Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date3 Jul 2024
Closing Date30 Jul 2024
Tender Amount₹ 29,40,452 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
140 mm (OD)

60

43320

722

... More
160 mm (OD)

120

109320

911

... More
180 mm (OD)

60

67740

1129

... More
Carrying CI/DI pipes with specials and valves and lowering placing in position and laying carefully inside the trenches in proper alignment and gradient etc. including earth work in excavation of adequate width as per specification having min. clear cover from top of pipe is 1.10mtr. below existing ground level in any kind of soil including mixed with boulder, road sub-grade and its flank,but excluding moorum and laterite and stone etc.without damaging the exisiting telephone/electric cable etc.(in case of damaged if any type of cable line during excecution , necessary damaged charges as applicable by the respective authority will be borne by the agency in his own cost) preparing the bottom surface for continuous bedding of pipe line and laying pipes, fitting, fixing specials and valves with bailing out water if any including carriage of pipes, specials and valves from local deptt. store within 8KM and back filling the trenches with excavated earth in layers to original condition as per specification and direction of EIC. The surplus materials after execution of work are to be return to the deptt. store. N.B: i) Any deviation from required clear cover of 1.10mtr., due to site adverse condition, prior permission is to be obtained from the EIC in exceptional situation and payment will be made on prorate basis over the rate of entire item ii) No payment will be made without hydraulic test of the pipe line either part or full iii) The pipes, specials and valves , rubber gasket will be supplied deptt. free of cost. (i)100 MM DIA

33

2376

72

... More
150 MM OD

55

6160

112

... More
200 MM OD

55

7480

136

... More
250 MM OD

55

9020

164

... More
Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source).A) For CI/DI pipe. b) 100 mm dia.

33

109

3.33

... More
b) 150 mm dia.

55

231

4.2

... More
200 MM OD

55

308

5.61

... More
250 MM OD

55

366

6.66

... More
B) For UPVC/HDPE Pipe. b) 90 mm dia.(OD)

2400

8640

3.6

... More
110 mm (OD)

240

907

3.78

... More
125 mm (OD)

60

229

3.82

... More
140 mm (OD)

60

254

4.24

... More
160 mm (OD)

120

573

4.78

... More
180 mm (OD)

60

310

5.17

... More
Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source)A) For CI/DI pipe. b) 100 mm dia.

33

31

0.94

... More
b) 150 mm dia.

55

84

1.54

... More
200 MM OD

55

130

2.38

... More
250 MM OD

55

190

3.47

... More
B) For UPVC/HDPE Pipe. b) 90 mm dia.(OD)

2400

2112

0.88

... More
110 mm (OD)

240

259

1.08

... More
125 mm (OD)

60

74

1.24

... More
140 mm (OD)

60

86

1.44

... More
160 mm (OD)

120

207

1.73

... More
180 mm (OD)

60

123

2.05

... More
Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in RCC cover slab with necessary opening for operation of valve all complete including cost of labour & materials as per Departmental Dwg. [Reinforcement type:- Other manufactuerers not specified] i) 80 mm to 150 mm dia pipe

6

71010

11835

... More
ii) 200 mm dia pipe

4

59988

14997

... More
25.0 mm to 350 dia pipe

2

37272

18636

... More
Making rubber gasket joint to CI/DI pipes maintaining proper alignment level etc. by mechanical arrangement with or without using mobile cranes where necessary and with help of all other equipments tools and tackles etc. as required providing lubricants of approved quality and direction of EIC. (rubber gasket will be supplied deptt. free of cost) i)100 MM DIA

6

120

20

... More
ii)150 MM DIA

10

380

38

... More
200 MM dia

10

510

51

... More
250 MM dia

10

640

64

... More
Supply at site/local store CIDF and CISS specials as per relevent IS specification with latest amendments including cost of loading carrying uncloding stacking properly and sales tax & all othrs charges. etc. complete.

500

47290

94.58

... More
Withdrawing and relaying of DI/CI pipes / AC pipe after excavation of earth and with the help of chain pully derrick etc. by dismantling & jointing by rubber gasket joint or lead joint or flange joint and stacking the withdrawn pipes and specials at site store /road flank, godown etc. all complete in the excavated same trench & as per direction of EIC. a) 80 mm dia to 125 mm dia

140

20160

144

... More
Submission of complete detailed drawing of distribution system, rising main etc. after execution of work showing position of different types of valves, fittings/specials sluice valve chamber with location, node to node wise in the sanctioned drawing as completion drawing of the water supply scheme as per direction and satisfaction of EIC. The list of dia wise fitting/specials, different pipes ;of valve used in the rising main should be shown in the completion drawing (not separate) with verified by SAE & AE in-charge of the scheme. The above drawing will be submitted in 5 copies.

3138

1192

0.38

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm

55

6559

119.27

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.

11

852

77.54

... More
Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety In ground floor (a) 1:3:6 proportion

10

33930

3393

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.

20

94900

4745

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m II. Other than SAIL/ TATA/RINL. II. JSW/JSPL/SHYAM/ SRMB/BMASL/ELECROSTEEL/SSL (For JJM Works)

2.1

192624

91726

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 ( (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

180

36900

205

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (i) With 1:4cement mortar (c) 10 mm thick plaster

140

17640

126

... More
Near cement punning about 1.5mm thick in wall ,dado, window , sills ,floor, drain etc

140

4760

34

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. (ii) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including the cost of carried earth.

500

199505

399.01

... More
Supplying & laying as per IRC-SP:063-2004 paver unit of any shade of approved quality as per relevant IS code, laid inpattern as directed in pavement, footpath, driveway (paver block only), etc including necessary underlay complete in all respect with all labour and material. [Border concrete if necessary to be paid separately]. Note: Sub-grade CBR should not be less than 5.(b) 50 mm thick interlocking designer concrete paver block M 30 grade for non-traffic zone,buiding premises,garden,parks,domestic drive as per IS: 15658- 2006(over 20-30 mm medium sand bed on 200mm thk bound gnaular /granular base course including cost of sand for sand bed but excluding cost of base course & subgrade preparation. ii) Coloured Decorative

80

89440

1118

... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. II) For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m

1.5

115854

77236

... More
Cutting DI pipe (all class & type) to required length with cutting device etc. and grinding the cutting portion with file as per direction and satisfaction of EIC.

5

705

141

... More
Chamfering the spigot end of all type/class of DI pipe for proper using of push joint by means of grinder set at site for proper joint etc. all complete as per direction of EIC. b) 100mm dia.

4

328

82

... More
b) 150 mm dia.

4

432

108

... More
b) 200mm dia.

4

452

113

... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof. (a) upto 150 mm. thick

8

7512

939

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.

8

32048

4006

... More
Bituminous pucca road (approx. 450mm depth) cutting by using gaiti, chisel, hammer etc. and picking uip the withdrawing excavated materials and remove the same within distance of 30mtr. at least all complete for fixing/crossing all dia of pipe line as per direction of EIC

20

20460

1023

... More
Providing FHTC from the existing/DI/UPVC/GI/AC distribution pipe line by installing 10mm NB Gun-metal Ferrule conforming to IS 2692: 1989 on the said pipeline with supply ,fitting & fixing of all other accessories line saddle piece of required size to fit the existing distribution pipeline ,specials, nut& bolts, rubber sheet, washers etc. And supply & laying of 15 mm NB PVC schedule 80)/20 mm OD HDPE (PE100,PN16) pipe (average 15 m length) with all necessary specials 1.0 metre below the ground connecting the ferule including cutting trenches in all sorts of soil and filling up trenches as per direction of the Engineer -in-charge and upto a point just inside the premises of the household or as directed by EIC. Supply and installation of 15mm dia alloy iron Bib Cock (tested to 21 Kg/cm2 ) above 1.0 Mtr. From ground , an alow Stop Cock of 15 mm dia . with brass spindle (tested to 21 Kg/cm2) to be fitted in a position as directed by EIC GI pipe (Medium duly) of 2 metre length with all necessary specials to continue from the end of the HDPE/PVC pipe and upto 1.0m above ground within the premises of household. Note:-1. PVC pipe shall of schedule 80(medium duty) conforming to ASTMD-1785 and threaded to match with GI pipes as per IS: 1239 (Part-I) 2. Rate is exclusive of supply and delivery of 10mm NB gun-metal Ferrule. 3. Payment of supply & laying of 15 mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials 1.0 metre below the ground will be made on actual measurement basis. The rate of this item is Rs. 117/- per metre) a) Upto 10m. length

10

18740

1874

... More
b) Aove 10m. upto 20m. Length

50

152200

3044

... More
Repairing of flange joint after dismantling the joints, removing the unserviceable rubber insertion and supply new rubber insertion and supply upto 50 % of new nuts and bolts all complete including necessary earth work dewatering & supply of washer etc. all complete as per direction of EIC. a) 80 mm dia. to 100 mm dia.

4

1244

311

... More
a) 125 mm dia. to 200 mm dia.

4

2180

545

... More
ADD 18% GST

1

444102

444102.52

... More
ADD1% CESS

1

29113

29113.39



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.