Public Health Engineering Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Works
Electrical and Electronics
Eprocure
Opening Date12 Oct 2024
Closing Date2 Nov 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Wbphe/ee/smd/niet33 Of 2024-25/1

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fixing of 250 Watt LED flood light fixture from 06.01.2025 to 18.01.2025 = 13 days x 100 pts.

1300

-

-

... More
Fixing of sodium vapour, flood light, street light, fixture & other accessories with 250/400 Watt S.V lamp from 06.01.2025 to 18.01.2025= 13 days.

-

-

-

... More
a)       250Watt/ (115 watt LED )[13 days x 235 pts]

3055

-

-

... More
b)       30 watt LED [13 days x 90 pts] for emergency

1170

-

-

... More
Fixing of 40watt tube light incl. supply of all necessary materials required to complete the work from 06.01.2025 to 18.01.2025 = 13 days x 315 pts.

4095

-

-

... More
Fixing 18/21/36 CFL lamp incl. supply of all necessary materials required to complete the work from 06.01.2025 to 18.01.2025 = 13 days x 460 pts.

5980

-

-

... More
Drawing of the flood light point for latrine area and fixing on steel tubular pole as per direction of EIC with Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 06.01.2025 to 18.01.2025 = 13 days x 5 pts.

65

-

-

... More
Making structure by 9 m long swaged type tubular pole with 1.5 m. long arm bracket in different points of temp. bus stand and mela ground on hire basis incl. fitting, fixing of S.V. Lamp & drawing of 3 ph. 4 wire insulator fitted with street tubular from 06.01.2025 to 18.01.2025.

120

-

-

... More
Supply at site on hire basis & temporary installation of controlling center incl. all inters connection with service line by necessary wiring materials reqd. as per direction of E.I.C

12

-

-

... More
Supply the following announcement accessories at site on hire basis & fitting fixing the same with supply of wire battery with stand etc. as reqd. for 24 hrs. Announcement programme as per direction of E.I.C. from 10.01.2025 to 16.01.2025. a) Loud Speaker 6 nos b) Amplifier 1 no c) Microphone 2 nos

10

-

-

... More
Making bamboo protection for steel tubular pole for Prevention of accident.

105

-

-

... More
Repairing of all glow sign board by changing of tube light, choke, starter etc. with interconnection complete by providing necessary connecting wire as per direction of the EIC

1

-

-

... More
Making remote control system on hire basis for inauguration of the whole lighting system at Kolkata bus stand in connection with Ganga Sagar Mela - 2025 by the Honb’le MIC & complete decoration of the opening ceremony area by LED dancing light and other necessary lights as required as per direction of the EIC

1

-

-

... More
Making LED lighting arrangement at mela ground with different coloured (blue/ white) LED light to be fixed by suitable G.I. wire across the road with all interconnection complete for the entire mela period i.e. from 06-01-2025 to 16-01-2025

2300

-

-

... More
Supply, delivery and fitting fixing at site of display board for PHED advertising on good quality flex cloth on hire basis at different places of mela ground of Kolkata bus stand as per following from 06-01-2025 to 16-01-2025 a.        With steel frame of sizes 6’ x 6’ ----------------------- 9 Nos. 6’ x 3’ ----------------------- 5 Nos. b.       Without steel frame of sizes 20’ x 4’ ---------------------- 1 No c.        Glow sign board with proper illumination arrangement 3’ x 1’ ----------------------- 1 No

1

-

-

... More
Supply, delivery and fitting fixing at site of LED light on hire basis as per following with electrical connection complete including supply of necessary connecting wire and all other necessary materials at different places of mela ground of Kolkata bus stand from 06-01-2025 to 16-01-2025 a.        LED Design Board of following sizes 8’ x 4’ ----------------------- 6 Nos. 4’ x 4’ ----------------------- 4 Nos. 2’ x 2’ ----------------------- 11 Nos. b.       LED Drop light of size 2’ -------------- 17 Nos. c.        LED strip light 60 Mtrs approx. d.       Colored LED Tree ---------------------- 2 Nos. e.       LED display board with lettering in Hindi, English & Bengali [Subject as per EIC]

1

-

-

... More
Supply, delivery and fitting fixing at site of display board for PHED advertising on good quality flex cloth on hire basis at different places of mela ground as per direction from 06-01-2025 to 16-01-2025 a. 16’ x 4’ ----------- 70 Nos. (inclu. The flex for gate no. 2) b. 6’ x 4’ ----------------------- 2 Nos.

1

-

-

... More
Supply, delivery and fitting fixing at site of LED light on hire basis as per following with electrical connection complete including supply of necessary connecting wire and all other necessary materials at different places of mela ground of Kolkata bus stand from 06-01-2025 to 16-01-2025 a. LED Screen- 6 nos ( 16' x 4') b. Coloured LED tree- 2 nos c. LED design board of following size: 6' x 3' ---- 6 nos 2' x 2' ----- 8 nos d. LED display board with lettering in different languages.

1

-

-

... More
Making bamboo structure for making LED gate in front of Gate no. 2 including supply of necessary materials to complete the work as per direction of EIC.

3

-

-

... More
Supply, delivery and fitting fixing at site of display board for making toilet in English and hindi language in both side on good quality flex cloth with steel frame on hire basis at different places of mela ground of Kolkata bus stand as per following from 06-01-2024 to 16-01-2024

1

-

-

... More
Supply & fitting fixing of 2 PIN 5 amps plug point for mobile chargers & 3 pin 15amps plug point for special purpose on hire basis

850

-

-

... More
Guarding arrangement of the whole installation of the above item for the entire period round the clock.

1

-

-

... More
Dismantling & taking out the whole installation after completion of mela as per direction of E.I.C.

1

-

-

... More
HIRING OF GENERATOR Supplying on hire basis truck mounted eco friendly silence in operation generating set with controlling panel, main switch, change over switch and necessary battery as per requirement and properly installed in suitable position as per direction of EIC with earthing complete including guarding arrangement complete for 24hrs

-

-

-

... More
From 06-01-2025 to 18-01-2025 = 13 days x 232 Kw [125 KVA x 2 Nos, 40 KVA x 1 No.]

3016

-

-

... More
From 08-01-2025 to 16-01-2025 = 9 days x 32 Kw x 2 [For emergency power supply]

576

-

-

... More
From 24-12-2024 to 05-01-2025 =13 days x 32 Kw [For Construction purpose]

416

-

-

... More
Running and maintenance of generating sets in full load balance with supply of fuel, lubricants, sundries and skilled operational staff and including all other materials required to complete the work with all electrical connections complete

-

-

-

... More
From 06-01-2025 to 18-01-2025 = 13 days x 232 Kw x 2 Hrs.

6032

-

-

... More
From 08-01-2025 to 16-01-2025 = 9 days x 32 Kw x 12 Hrs. [For emergency power supply]

3456

-

-

... More
24-12-2024 to 05-01-2025 =13 days x 32 Kw x 12 Hrs. [For Construction purpose]

4992

-

-

... More
DRAWING OF SERVICE CONNECTION Supply and erection of service meter board and distribution board on hire basis for receiving AC 3 phase 4 wire 440V powers by providing 4 pole MCCB, change over switch, DB consisting of MCB of different rating, danger board confirming to IE rules from 05.01.2025 to 19.01.2025.

3

-

-

... More
Supply on hire basis control panel comprising of MCB of 200A, 100A, 63A, 32A & volt meter, ammeter etc with bus bar chamber for distribution of power to different points of the mela ground from 05.01.2025 to 19.01.2025.

3

-

-

... More
Drawing of LT distribution line in 3 Ph. 4 wire system as per IE rules and ISS by 35/50 sq. mm. PVC single core wire/ Al. Ar. cable on hire basis through 6 mtrs. long bamboo post / underground trench with suitable protection as per direction of E.I.C. from 05.01.2025 to 19.01.2025.

41000

-

-

... More
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts and washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the steel tubular pole

125

-

-

... More
Construction of temp shed 12ft x 10 ft by bamboo structure with walling and G.I. corrugated roof during mela period as per direction of E.I.C.

3

-

-

... More
Construction of temp shed 8 ft x 6 ft by bamboo structure with walling and G.I. corrugated roof during mela period as per direction of E.I.C. for electrical control unit

3

-

-

... More
Supply delivery and installation of fire extinguisher on hire basis at Calcutta Bus Stand main office campus on a common visible place as per direction of E.I.C capacity 9 kg. filled and tested to 30 Kg/cm² as per IS: 2171 on hire basis from 09.01.2025 to 18.01.2025 = 6 such units 10 days.

60

-

-

... More
Supply and delivery at site on hire basis of DIP outdoor full colour LED module display board of size 3m x 2.4m having requisite technical parameters suitable for operating with 230 volt 50 HZ AC power supply with all required accessories for 09-01-2025

1

-

-

... More
Making necessary arrangement for remote controlled opening of screen with supply of necessary materials like screen, pulley, motor, remote, battery etc. on hire basis.

1

-

-

... More
Fitting fixing of the above items including supply of necessary materials like casing, speaker wire, wireless kit, speaker bracket etc. and jointing materials on hire basis as required to complete the work as per direction of EIC & dismantling the same after completion of the programme.

1

-

-

... More
Supply and fitting fixing on hire basis of 600 mm. dia industrial type stand fan at stage of inauguration of Ganga Sagar Mela-2025 at Outram ghat.

1

-

-

... More
Guarding arrangement of the whole installation for the entire period round the clock from 05.01.2025 to 19.01.2025

1

-

-

... More
Dismantling and taking out the whole installation including temporary service connection with LT wire after completion of mela as per direction of E.I.C. [All damaged materials will have to be replaced by the agency at their own cost.]

1

-

-

... More
Supplying on hire basis truck mounted eco friendly silence in operation generating set with controlling panel, main switch, change over switch and necessary battery as per requirement and properly installed in suitable position as per direction of EIC with earthing complete including guarding arrangement complete for 24hrs

-

-

-

... More
From 07.01.2025 to 18.01.2025 = 12 days x 80 KW

960

-

-

... More
From 24-12-2024 to 06-01-2025 =14 days x 24 Kw [For Construction purpose]

336

-

-

... More
From 08.01.2025 to 16.01.2025 [ for emergency power supply ] = 9 days X 20 KW.X2 nos.

360

-

-

... More
Running and maintenance of generating sets in full load balance with supply of fuel, lubricants, sundries and staff witn all other materials required to complete the work with all electrical connections complete

-

-

-

... More
From 07.01.2025 to 18.01.2025 = 12 days x 80 KW x 12 Hrs.

11520

-

-

... More
From 24-12-2024 to 06-01-2025 =14 days x 24 Kw x 12 Hrs. [For Construction purpose]

4032

-

-

... More
From 08.01.2025 to 16.01.2025 = 9 days X 20 KW. X 12 hrs.

2160

-

-

... More
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts and washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the steel tubular pole

70

-

-

... More
Supply and fitting fixing of Glow Sign Board for Gents & Ladies Toilets on hire basis from 07.01.2025 to 18.01.2025 (Size- 3'-0" x 2'-0")

2

-

-

... More
Guarding arrangement of the whole installation for the entire period round the clock from 05.01.2025 to 19.01.2025

1

-

-

... More
Dismantling & taking out the whole installation after completion of mela as per direction of E.I.C.

1

-

-

... More
WATER SUPPLY : Dismantling the submersible pump set parts by parts for repairing purpose as directed

2

-

-

... More
Repairing the pump set by replacing the fast moving spares e.g. impeller, diffuser ring, coupling, bush whichever is necessary to complete the job as directed

2

-

-

... More
Reassembling the pump set parts by parts which has been incorporated in item no.2 as directed

2

-

-

... More
Testing the pump set as per entire satisfaction of E.I.C

2

-

-

... More
Normal washing & cleaning of the 120 mm x 50 mm. dia. Tube well by bucket system and with the help of 40 mm. dia G.I. pipes, check valve & different types of tools & tackles and other materials on hire basis with lowering and fittings the above pipes and continuous washing the tube well & developing the above tube well by engaging skilled labour including supply of other materials to complete the job as per direction.

17

-

-

... More
Carrying charges of all Submersible pump capacity 2,000 GPH 60 ft. head with column pipe & all other accessories from Governor Estate, Kolkata to mela ground incl. loading & back to Governor Estate after completion of mela as per direction of E.I.C.[2nos]

2

-

-

... More
Installation of control panel for submersible pumping machinery

2

-

-

... More
Installation of above pump with 75 ft. column pipe including connection of power line as per direction of the E.I.C.

2

-

-

... More
Making delivery connection with fitting & fixing of non-return valve, pressure gauge and 1½” dia. 10 ft. long G.I. pipe connection for protection of flat submersible cable with supply of all materials reqd. to complete the work.

2

-

-

... More
Making safety device nylon rope / G.I wire for the above installation on hire basis. For 2nos pump

2

-

-

... More
Making cable jointing with reqd. Materials for pump motor set

2

-

-

... More
Running & maintenance of submersible pump set during mela period by engaging skilled operating staff in 3 shifts with supply of necessary sundries from 05.01.2025 to 18.01.2025 = 14 days x 20 hrs x 2 nos

560

-

-

... More
Supply & delivery of bleaching powder with 33% chlorine in 25kg poly bag (Make-DCM/ Kanoria or any other approved make)

10

-

-

... More
Making disinfections arrangement of the delivery line by bleaching solution with supply of required size of poly pipe, jar, bucket, stop cock, mug etc as required for the work as per direction of the EIC

2

-

-

... More
Guarding arrangement of the pump motor set of T.W. No. I & II, in 3 shifts with effect from 05.01.2025 to 18.01.2025

2

-

-

... More
With drawing the pump motor set with 75 ft. column pipe by derrick arrangement & disconnection of electrical & mechanical connection complete after mela period as per direction of E.I.C.

2

-

-

... More
Supply and delivery at site of Calcium Hypoclorite [Ca(OCL)₂] granules with minimum chlorine content 60% to 65% in air tight plastic container. (Make- Shree Rayalaseem Hi Strength Hypo Limited / Hind Pharma / Aquafit / PHE approved) N.B= Test certificate should be submitted at the time of delivery.

200

-

-

... More
Supply of submersible pumping machinery including column pipe on hire basis(3 phase Cora pump]for supply of drinking water as directed with effect from 05.01.2025 to 18.01.2025 = 14 days

-

-

-

... More
a.        For T.W. No. 3

14

-

-

... More
b.       For T.W. No. 4

14

-

-

... More
c.        For T.W. No. 5

14

-

-

... More
d.       For T.W. No .6

14

-

-

... More
e.       For T.W. No .7

14

-

-

... More
f.         For T.W. No .8

14

-

-

... More
g.        For T.W. No .9

14

-

-

... More
h.       For T.W. No .10

14

-

-

... More
i.       For T.W. No .11

14

-

-

... More
j.       For T.W. No .12

14

-

-

... More
k.       For T.W. No .13

14

-

-

... More
m.       For T.W. No .14

14

-

-

... More
n.       For T.W. No .15

14

-

-

... More
n.       For firefighting

14

-

-

... More
Supply of monoblock submersible pumping machinery including necessary pipe and fittings on hire basis(3 phase Cora]for supply of fire fighting water as directed with effect from 05.01.2025 to 18.01.2025

-

-

-

... More
a.        For T.W. No. 1

14

-

-

... More
b.       For T.W. No. 2

14

-

-

... More
c.        For Stand By Tubewell

14

-

-

... More
Supply & installation of control panel for submersible pumping machinery on hire basis from 05.01.2025 to 18.01.2025

16

-

-

... More
Installation of above pump with 75ft column pipe and connection of power line as per direction of EIC.

16

-

-

... More
Making delivery pipe line connection and fitting fixing non return valve, pressure gauge and 1 ½ “ dia 12 ft long GI pipe connection and cable protection including supply of necessary materials required to complete the job

16

-

-

... More
Making safety device nylon rope/GI wire for the above installation on hire basis

16

-

-

... More
Making cable jointing with required materials

16

-

-

... More
Running & maintenance of submersible pump set during mela period by engaging skilled operating staff in 3 shift with supply of necessary sundries from 05.01.2025 to 18.01.2025 = 14 days x 20hrs x 16 nos

4480

-

-

... More
Guarding arrangement of the pump motor set of TW No. 4 to 10 in 3 shifts from 05.01.2025 to 18.01.2025

16

-

-

... More
Supply of the following G.I. Pipe and specials at site on hire basis and damaged materials will have to be replaced by the agency at their own cost from 05.01.2025 to 19.01.2025. a. 1 ½”dia. (40 mm) G.I. socket…. 2 nos. b. 1½ “dia. (40 mm) G.I. pipe… 20 ft. c. 1 ½” dia. (40 mm) G.I. Jum nut …1 No. d. 6” x 1 ½” dia. (40 mm) long screw-1 no. e. 1½’’dia. (40 mm) full way valve-1 no.

16

-

-

... More
Making arrangement of washout line by supplying the following materials on hire basis from 05.01.2025 to 19.01.2025 by supplying the following materials. The damaged materials will have to be replaced by the agency at their own cost. a. 40 mm dia G.I. bend …. 1 no. b. 40 mm dia G.I. pipe … 15 ft. c. 40 mm dia long screw ... 1 no. d. 40 mm peets valve (ISI marked)-1 no.

16

-

-

... More
The connection of delivery pipe line with G.I. pipe & specials of item no. 1 including necessary thread cutting damaged materials will have to be replaced by the agency at their own cost from 05.01.2025 to 19.01.2025

13

-

-

... More
Supply and fitting fixing of following pipes and valves on hire basis to make necessary connection with the fire fighting tanks[4 places] and spout 2[two] places including supplying of all specials as required on hire basis from 05.01.2025 to 19.01.2025. This includes the cost of dismantling the same after closing date as per direction a. 40mm dia GI pipe[M] 120 ft b.   40mm.dia. peets valve[ISI] 8 nos

3

-

-

... More
Supply on hire basis of automatic chlorinator with all required accessories for chlorination of the ganges water from 05.01.2025 to 18.1.2025

14

-

-

... More
Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories in suitable position and withdrawing the same after Mela as per direction of the EIC

1

-

-

... More
Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work from 05.01.2025 to 19.01.2025

14

-

-

... More
Withdrawing the pump set with 75ft column pipe by derrick arrangement and disconnection with electrical and mechanical connection complete after mela period as per direction of EIC.

16

-

-

... More
Supply on hire basis of automatic chlorinator with all required accessories for chlorination from 06.1.2025 to 19.01.2025= 3 nos. X 14 days

42

-

-

... More
Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories to its existing base and withdrawing the same and storage to the departmental store after Mela as per direction of the EIC

3

-

-

... More
Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work from 06-01-2025 to 19-01-2025 [for 3 Nos. Machine]

14

-

-

... More
Supply and fitting fixing on hire basis of 600 mm. dia industrial type stand fan at stage of inauguration of Ganga Sagar Mela-2025 at Outram ghat.

6

-

-

... More
DECORATIVE LIGHTING, LED DISPLAY BOARD, AUDIO VISUAL AND SOUND SYSTEM Supply, delivery and fitting fixing on hire basis of 35 nos. LED par light with necessary adjustable stand ,bar etc. at stage and other places of mela office incl.fitting fixing the same by hiring necessary fixing and connecting materials and drawing of power line as per directionfitting fixing the same by hiring necessary fixing and connecting materials and drawing of power line as per direction

1

-

-

... More
Supply and delivery at site on hire basis of DIP outdoor full colour LED module display board of size 3 m. X 2.4 m. having requisite technical parameters viz router etc. incl. complete videography suitable for transmission operating with 230Volt 50Hz AC power supply with all required accessories from 09.01.2025 to 11.01.2025

3

-

-

... More
Providing on hire basis microphone with stand , 800Watt/1000 Watt Amplifier set ( 3 Pairs) complete with equalizer ,cordless microphne ,voice changer,mixing machine JBL sound box twin core cable for connection of speaker /horn etc. for PA system complete with master operator and dismantling the entire system after completion of the programme. mixing machine JBL sound box twin core cable for connection of speaker /horn etc. for PA system complete with master operator and dismantling the entire system after completion of the programme.

1

-

-

... More
Making concealed wiring by laying pvc conduit,fitting fixing of GI box for modular switch ( 3 module 2 nos.,2 module- 2 nos., 3 module plate - 2 nos.,2 module plate -2 nos., 6Amp. Modular switch (Athena) 5 nos. ,16 A modular switch -1 no. , 16 A modular socket -1 no.) 17 watt LED fixture - 4 nos. , Mirror light ( LED) - 1 no.,6 " PVC exhaust fan - 1 no.,10 Ltr. Star Rated Geyser - 1no. With proper earthing as per IE rules and specification.fitting fixing of GI box for modular switch ( 3 module 2 nos.,2 module- 2 nos., 3 module plate - 2 nos.,2 module plate -2 nos., 6Amp. Modular switch (Athena) 5 nos. ,16 A modular switch -1 no. , 16 A modular socket -1 no.) 17 watt LED fixture - 4 nos. , Mirror light ( LED) - 1 no.,6 " PVC exhaust fan - 1 no.,10 Ltr. Star Rated Geyser - 1no. With proper earthing as per IE rules and specification.

1

-

-

... More
Hiring and Laying of 95 sq. mm. 3.5 core Al. ar. Cable for power supply

570

-

-

... More
Supply and erection on hire basis MCC control panel to operate the entire programme at venue as per direction.( all connections are duly socketed) and double earthing complete.

1

-

-

... More
WATER CARRIAGE Supply, delivery and storage at site of 100 Kgs capacity gunny bag as per sample for carrying of drinking water pouches.

10000

-

-

... More
Carrying of 350 ml. water pouches from MTU at IIEST, Shibpu, Howrah to Kolkata Bustand in connection with Ganga Sagar Mela 2020including filling of 100 nos pouch in each gunny bag and stitching and loading, unloading complete by hiring diesel vehicle as per direction of EIC

200

-

-

... More
Manual carrying of above nos gunny bags from vehicle parking area to stack yard and different points at mela spots by involving unskilled manual labour as per direction round the clock as and when required

10000

-

-

... More
Hiring of silent type Diesel genarating set on hire basis for opening ceremony by Hon'ble Chief Minister, Government of West Bengal Supplying on hire basis truck mounted eco friendly silence in operation generating set with controlling panel ,main switch, change over switch and necessary battery as per requirement and properly installed in suitable position a per direction of EIC with earthing complete for 24 hrs. 100 KW on 8.01.2025

100

-

-

... More
Running and maintenance of generating set in full load balance with supply of fuel,lubricants sundries and skilled operatioanal staff and including all other materials required to complete the work with all electrical connections complete. on 08.01.2025 ; 100KW X 12 Hours

1200

-

-

... More
Hiring of silent type Diesel genarating set on hire basis for fighting arrangement Supplying on hire basis truck mounted eco friendly silence in operation generating set with controlling panel ,main switch, change over switch and necessary battery as per requirement and properly installed in suitable position a per direction of EIC with earthing complete for 24 hrs. From : 05.01.2025 to 18.01.2025 = 14 days X20 KW

280

-

-

... More
Running and maintenance of generating set in full load balance with supply of fuel,lubricants sundries and skilled operatioanal staff and including all other materials required to complete the work with all electrical connections complete. on 05.01.2025 to18.01.2025 = 14 days 20KW X 2 Hours

560

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.