Public Health Engineering Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Eprocure
Opening Date23 Sep 2024
Closing Date21 Oct 2024
Tender Amount₹ 44,77,011
Costs
EMD
₹ 89,540Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Temporary Hogla Structure For Govt. And Other Organizations And Special Latrine At Different Places Of Ganga Sagar Mela Ground Including Maintenance, Making Change Room (04 Nos.) In Connection With G.s. Mela 2025 Under Kakdwip Sub-divn., Phe Dte.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_755981_5Bid Award Id
ViewTender No
WBPHED/EE/NIeT-43/AD/2024-2025Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://www.wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
iii) 'H' type of size 28' x 8' Police (Press)- 2, Joginath - 1, Trinamool Seva Dal-1, N.G.O.(Prerona) - 2
6
51803
8633.93
iv) 'H1' type of size 14' x 8' NGO(Prerona) - 1
1
4975
4975.51
v) Hogla Structure of size 16' x 8' (Joginath - 1)
1
4592
4592.02
vi) Hogla Structure of size 100' x 16' (shed) Police (Wood Bunglow) - 2, Colony Para F.P. School - 01 no.
3
118228
39409.5
vii) Muli Chatai walling as and where necessary. (Jail Hazzat near 2no sea beach)
50
6961
139.23
viii) Hogla walling as and where necessary. (Prerona, Joginath, Police(Wood Bunglow & 3&4 road)
855
68724
80.38
ix) 'F' type of size 10' x 8' (Prerona)
2
7113
3556.63
x) Special Bath/Urinal of size 1.2m x 1.2m including brick flat soling. (NGO Prerona) - 6 No)
6
7546
1257.77
Construction of the following temporary structure made with Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work) (GCI sheet to be supplied by contractor on hire basis) With 0.60 mm thick sheet.
-
-
-
i) "K1" - type of size 15' x 10'
2
35785
17892.64
ii) "K2" - type of size 10' x 8'
2
24687
12343.55
Construction of Temporary Special type of Latrine (4unit) with out Leach Pit made with Galvanised Plain Sheet at various pin point sites with 125 mm thick Brick Work (4:1) 225 mm depth including earth work in excavation and filling upto required depth, Brick flat soling, 15 mm thick plaster (6:1) and Neat Cement punning 1.5 mm thick, fitting fixing W.C. Pan and syphone on hire basis, laying and jointing S.W. pipe including covering all sides and roof by G.I. Sheet, door made by Corrugated Tin (.75mtr. x 2.0 mtr.) including digging two nos. sludge pit of 1.0 mtr. dia & 1.20 mtr. depth with Earthen Ring / R.C.C. Ring covererd. Necessary supply of Mug, bucket, Drum etc. on hire basis to be provided for watering with required bleaching powder for disinfection in all respect and dismantling the same after the mela is over and cleaning the premises as per full satisfaction of E.I.C.
-
-
-
With Leachpit
5
128036
25607.37
Without Leachpit
5
122345
24469.16
Construction of 1 No. Special Latrine (1 Unit) made with 125 mm thick Brick Work (4:1) 225 mm depth including earth work in excavation and filling upto required depth, Brick flat soling, 15 mm thick plaster (6:1) and Neat Cement punning 1.5 mm thick (Outside), fitting fixing W.C. Pan laying on 12 mm thick Water Resistant Ply with Decorative Lamination (white) and syphone on hire basis, laying and jointing S.W. pipe including covering all sides and roof by Hogla Sheet with door of Corrugated Tin (.75mtr. x 2.0 mtr.) including digging one no. sludge pit of 1.0 mtr. dia & 1.20 mtr. depth with Earthen Ring / R.C.C. Ring covererd. Necessary supply of Mug, bucket, Drum etc. on hire basis to be provided for watering with required bleaching powder for disinfection in all respect and dismantling the same after the GS Mela is over as per full satisfaction of E.I.C.
(Police(Helipad) - 1,Police(wood Bunglow)-2,Joginath-1, Jail Hazzat - 2, Wood bunglow front- 20)
21
115038
5478.03
Construction of 1 No. Special Latrine (2 Unit) made with 125 mm thick Brick Work (4:1) 225 mm depth including earth work in excavation and filling upto required depth, Brick flat soling, 15 mm thick plaster (6:1) and Neat Cement punning 1.5 mm thick (Outside), fitting fixing W.C. Pan laying on 12 mm thick Water Resistant Ply with Decorative Lamination (white) and syphone on hire basis, laying and jointing S.W. pipe including covering all sides and roof by Hogla Sheet with door of Corrugated Tin (.75mtr. x 2.0 mtr.) including digging one no. sludge pit of 1.0 mtr. dia & 1.20 mtr. depth with Earthen Ring / R.C.C. Ring covererd by R.C.C. circular Slab and Mullichatai, Polythene sheet. Necessary supply of Mug, bucket, Drum etc. on hire basis to be provided for watering with required bleaching powder for disinfection in all respect and dismantling the same after the GS Mela is over as per full satisfaction of E.I.C.
(Police(Helipad) - 1,Police(wood Bunglow)-2,Joginath-1, Jail Hazzat - 2, Wood bunglow front- 20)
40
398517
9962.93
Engagement of labour for Cleaning, sweeping, watering, disinfecting the premises on and from 08.01.2025 to 17.01.2025 roted the clock wise with full satisfaction of E.I.C. (For 10 Nos. Each 4 Unit) 2 Nos. X 3 Shifts x 10 days.
60
19536
325.6
Engagement of labour for Dressing & Chilcheling, levelling, dismantling and removing all objectionable materials etc as and where necessary complete in all respect as per direction and satisfaction of the E.I.C.
27.12.2024 to 05.01.2025 = 20 Nos x 10 Days
200
65120
325.6
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
120
112345
936.21
Labour for laying soiling with departmental bricks including carriage of departmental bricks within a lead of 150 metres preparation of bed as necessary with brick joints properly filled in and packed with brick joints properly filled in and packed with local sand or powdered earth and including necessary cushion of similar materials below the soling (and in between layers when more than one layer is used) (The item included the cost of obtaining local sand or powdered earth)
(a) Single brick flat soling (thickness 75 mm)
6189
221813
35.84
Hire charges for supply of bricks for temporary pathway at 5 no. Toilet Ground.
198000
1207800
6.1
Labour for withdrawing bricks from different types hogla structre, Galvanized Structure and approach road of Temporary Latrine. (Ordinary Mazdoor)
130
35035
269.5
Hiring charges of 5HP capacity Pump for continuous pumping of water / waste water from the sump / pond / ditches etc including fuel and other necessary accessories as when necessary and withdrawing the same after completion of the work.
3300
323400
98
Engagement of Pump Operator (Plumbing Mistry)
95
34067
358.6
Engagement of Helper (Ordinary Mazdoor)
95
25602
269.5
Hiring charges of Tractor for Shifting of Mobile Toilet and other departmental materials as and where necessary on emergency basis at Sagar Mela Ground.
35
166250
4750
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
1570
37680
24
Labour for taking out old soling edging including removing debris (a) Single flat soling
2345
23004
9.81
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface : With other than hi-gloss of approved quality- iv) Two coats (with any shade except white)
706
50832
72
Hiring charges of J.C.B. for Shifting of Mobile Toilet and other departmental materials as and where necessary on emergency basis at Sagar Mela Ground.
14
79800
5700
Making temporary Change Room (4 unit) on hire basis by M.S Slotted angle size 1⅝ '' x 1⅝ '' with A.C.P. Board Walling and G.I. sheet roofing with door fitted by M.S. Hinges and locking arrangement by M.S. Clamp as per direction and satisfaction of the E.I.C. at Ganga Sagar Mela ground in connection with Ganga Sagar Mela-2025 under Kakdwip Sub-Division of Alipore Division, P.H.E. Dte.
4
125658
31414.54
Labour engaged for shifting of change room as per Low and High Tied at Sea Beach area and take care and cleaning the change room for 24 hours during mela period. (From 10.01.2025 to 16.01.2025) (ordinary mazdoor) 4 nos. x 3 shift x 7 days = 84 nos.
84
22638
269.5
Add 30% Riverine on item No 16,18 i.e. on Rs 88512.00
1
26553
26553.6
Add GST @ 18% on all item i.e; on Rs. 3756512.34
1
676172
676172.22
Add Labour Welfare Cess @ 1% o i.e ; on Rs. 4432684.56
1
44326
44326.85
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements