Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Eprocure
Opening Date13 Feb 2019
Closing Date5 Mar 2019
Tender Amount₹ 20,81,415 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 41,628Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_PHED_214821_11Bid Award Id
ViewTender No
13/CD/2018-19Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://www.wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete with 30 mm down graded shingles excluding shuttering (N.B. Variety). In ground floor a) 6:3:1 proportion.
19.97
-
3838.16
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
River Bazree
88.79
-
5437.67
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation, basement and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
6.273
-
79780.14
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor).
a) 25 mm to 30 mm shuttering without staging in foundation.
293.7
-
231.9
... More
b) 25 mm to 30 mm thick wooden shuttering as per decision &ddirection of the E.I.C. in foundation.
297
-
371.03
... More
Labour for horizontal boring under pucca road etc. for laying UPVC pipe line through horizontal boring incl. all labour , tools & plants incl. all incindental charges all complete as per direction and instruction E.I.C.
up to 150 mm dia or 180 mm OD
12
-
262.6
... More
Supplying, fitting and fixing G.I. pipes of NON-TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately)
(A) For Exposed Work
(i) 80 mm dia. medium quality
662.2
-
740.25
... More
Carriage of pipe & specials from Depttl. Store inclu. Loading & unloading and stacking at Site
3
-
486
... More
Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with powdered earth or local sand.
82.5
-
364.25
... More
Disinfection of distribution line (AC/DC/CI) by flushing with water containing bleaching power @ 56mg/lit of water and cleaning the same with fresh water. The water should remain in the main for a minimum period of 24 hrs. the bleaching power solution will be applied continuously for a period of time to provided a column of chlorinate water in contact with all inner surface of the main for period of at least 3 hrs. operation (To be repeated twice) (The DCM brand bleaching power and water will be supplied by the Agency) 100mm.dia.
85
-
2.22
... More
Hydraulically testing of different type (AC/DI/CI) of pipe in section by hand pump and the proposed field testing to check the quality of workmanship of pipeline and the quality of pipe. The test pressure shall be kept 105 times to the actual operating pressure (i.e the test pressure recommended by ISI for corresponding pipe materials) whether the gauge pressure will remain static for 30 minutes by filling the pipeline with water including supply of all necessary equipments such as generator set, pumps gauge, air compressor in section along with as specified in the specification including providing blank flange duly stiffened with angle or joint section on either side of the pipeline necessary equipments& supply of water will be necessary for testing etc. all complete as per direction of the EIC. (When the water will be supplied by the department the rate will be reduced & 33% from the following rate)
100 mm dia.
85
-
1.06
... More
Neat cement punning about 1.5 mm thick in wall, dado, window sills, floor, drains etc.
250
-
38.46
... More
Plaster (to wall, floor,celling etc.) with sand and cement morter(1:4) including rounding off or chamfering Corner as directed and raking out joints including throating,nosing and drip course, scaffolding/staging where necessary(Ground floor).[Excluding cost of chipping over concrete surface] 1:4 Cement Morter
10 mm thick plaster
250
-
142.53
... More
Making flange joints in the pipeline (C.I./D.I) with supplhy of Nuts and Bolts with washer (Nut & Boltsll, Washer should be TATA / G.K.W Make).Rubber insertion 6 Kg./Mtr. Sq. 1/8 gauge and other materials required (all standard type and I.S.I approved quality) etc. all complete incl.making joints holes shuttering planking de-watering the trenches and supply of all materials and labour charges all complete as per direction of E.I.C.
-
-
-
... More
80 mm dia.
6
-
85.85
... More
100 mm.dia.
4
-
139.38
... More
Earthwork in excavation in trenches width having minimum depth to keep the top surface of pipe 1.20 M. below of the existing ground level in any kind of soil mixed with boulder road sub-grade and its flank,dewatering the trenches preparig the bottom surface for continuous bedding of pipeline,fitting,fixingvalves,specials etc. in position cutting of pipes as required carriage of materials from Depttl.Store to work site,filling of the trenches with excavated materials consolidating the same in layers,removing the surplus materials from site including all labour,tools& plants as per specification and instruction of E.I.C.(the pipes,specials, valves, Rubber Gusket, C.I.D.T Joints will be supplied departmentally.The surplus materials are to be returned back Depttl.Store at his own cost) A) For C.I / D.I./D.F Pipe
-
-
-
... More
100 mm dia.
55
-
40.4
... More
Supply of sand site (Fine Sand)
105
-
487.9
... More
M.S. structural works in columns, beams etc.with simple rolled structural members (e.g.joists, angle, channel sections conforming toIS: 226, IS: 808 & SP (6)- 1964 connected toone another with bracket, gussets, cleats asper design, direction of Engineer-in- chargecomplete including cutting to requisite shapeand length, fabrication with necessarybolting, metal arc welding conforming to IS:816- 1956 & IS: 1995 using electrodes ofapproved make and brand conforming toIS:814- 1957, haulage, hoisting and erectionall complete. The rate includes the cost ofrolled steel section, consumables such aselectrodes, gas and hire charge of all toolsand plants and labour required for the workincluding all incidental chages such aselectricity charges, labour insurance charges etc
i)for structural work…….. Less than 22.5kg/m
0.3
-
84354.71
... More
Fitting fixing jointing properly C.I / D.I. pipe (Tyton joints) with Rubber Gusket as per specificatin and direction of E.I.C. and Rubber Gusket will be supplied departmentally.)
-
-
-
... More
100 mm dia.
6
-
12.12
... More
Construction of Sluice Valve Chamber as per Depttl. Drawing No. 32/NBC - 79/97 with brick work in cemernt mortar(4:1) over 15cm.of cement concrete(6:3:1) with supply of approved quality C.I.Surface Box embedded into 150mm.thick R.C.C removal slab in (4:2:1) including fitting,fixing and overhauling the valves if necessary all complete as per specification and instruction of E.I.C (Valves, Specials will be supplied Departmentally.)
-
-
-
... More
100 mm dia.
1
-
7925
... More
Supplying, laying,fitting fixing and jointing of UPVC class-III pipes(As per I.S. 4985-2000), pressure not less than 6Kg./cm2 with solvent cement joint (as per I.S. 14182-1994) including supply of fabricated P.V.C. fittings (As per I.S.101-1988) including fitting and fixing with C.I./A.C. pipes, valves, specials etc. where necessary including required sand cushioning & cost of all anciliary works connected in aligning positioning & fixing all pipes, specials & valves etc. up to an average depth of 1M over t5op of the pipes so as to maintain through out the length of the pipe line including cutting trenches in all types of soil and back filling the trenches in layers with excavated materials including hydrolic testing dis-infection and washing of pipe line complete as per direction of E.I.C. (solvent cement along with specials & valves upto 63mm O.D for U.P.V.C. pipeline to be supplyed by the Agency and valves above 63mm O.D. will be supplyed be the Deptt.) A) U.P.V.C. Pipe Class III (I.S. 4985-2000)
90 mm OD
30
-
271
... More
Withdrawing of DI/CI/UPVC pipes AC pipe after excavation of earth and with the help of chain pulley derrick etc. by dismantling of jointing of rubber gasket joint or lead joint or flange joint and stacking the withdrawn pipes and specials at site store / road flank godown etc. all complete as per direction of EIC. WITHDRAWING PIPES SHOULD BE IN FULL LENGHT AS CONNECTED WITH DI JOINT/JOINTS.
a) 80 mm to150 mm AC / DI /CI Pipe.
100
-
107
... More
Bailing or pumping out water from foundation trenches. This item should be executed on the specific direction of the Engineer-incharges when he is satisfied in his absolute discretion, that this has not been necessitated due to any fault on the part of the contractor
20
-
23.62
... More
Filling empty bags with dry earth or sand, stiching the bag(cost of thread incl) &carring and placing them in position an all incidental charges complete but excluding cost of samdgunney bags.
3000
-
3.5
... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m
In ground floor including roof. (a) upto 150 mm. thick
12.6
-
1062.2
... More
Supplying empty cement bags in good conditions.
3000
-
3.3
... More
Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy clay or earth.
NB. -- This rate only for Northern Circle, NBCC-I & NBCC-II
60
-
51
... More
R.C.C. well ring made with cement concrete 1:1.5:3 with stone chips and 0.80% reinforcement (including the cost of shuttering and reinforcement) cast at site fitted and fixed in position after proper curing true to plumb in the well including jointing with cement mortar 1:2 complete as per direction.
a) 65 mm thick and 0.9 metre internal dia.
60
-
1399.29
... More
Digging earth in any soil including mixed soil but excluding moorum, laterite sand stone or any other hard stone including spreading or stacking the spoils within a lead of 75 metres as directed bailing out water upto 1 metre depth, shoring etc., when and if required and back filling with fine sand ( including cost of sand) on completion of steining works
A) R.C.C. Ring Well
i) 1.2 metre diameter of digging for 0.9 metre internal diameter of well ring.
a) Upto 3 metre below G.L.
12
-
683.24
... More
Labour for propping up overhead members as a precautionary measure against falling as directed with necessary planks, Eucalyptus props, packing nails, wire ropes, iron wires etc. including hire charges of all materials fitting, fixing dismantling and removing the props etc and all ancillary works in this connection