Public Health Engineering Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Building Construction
Eprocure
Opening Date14 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 2,91,318
Costs
EMD
₹ 5,826Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbphed/ae/rsd/niet_10/24-25_4
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PHED_800418_4Tender No
WBPHED/AE/RSD/NIeT_10/24-25Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://www.wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Reinforcement for reinforced concrete work in all sorts of structure including distribution bars stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending in correct shape, placing improper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. i) Tor steel / Mild steel. [JSW/JSPL/SHYAM/SRMB]
0.36
83433
30035.93
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety
7.25
5218
37837.24
... More
Cement concrete (6:3:1) prop. with graded stone chips (40 mm size) excluding shuttering. a) In ground floor and foundation
0.5
4233
2116.5
... More
Hire and labour charges for shuttering for concrete work with centring and necessary staging upto 4.0m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slab, beams, columns, lintels, curved or straight including fitting, fixing, striking out after completion of works. a) 25mm to 30mm thick wooden shuttering as per direction of EIC.
15
328
4920
... More
25mm to 30mm thick shuttering without stagging
52
205
10660
... More
Brick work with 1st class bricks in cement mortar (6:1)
a) In foundation and plinth
5.14
4243
21809.02
... More
b) In superstructure. Ground floor.
8.4
4466
37514.4
... More
Plaster including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface, Plaster (to wall, floor, ceiling etc.) with sand and cement mort including throating, nosing and drip course where necessary.(ground floor).
a) 10 mm thick plaster (4:1)
10.8
122
1317.6
... More
b)15 mm thick plaster (6:1)
65
135
8775
... More
b)20 mm thick plaster (6:1)
45
153
6885
... More
25 mm. thick damp proof with cement concrete (1:1.5:3) (with graded stone aggregate 10 mm. normal size) and painting the top surface with a coat of bitumen [VG.40 ] using 1.7 kg. per
sq.m. including heating the bitumen and cost and carriage of all materials complete. [Bitument to be supplied by the Agency]
12
247
2964
... More
Neat cement punning about 1.5mm. thick in wall dodo window sills, floor drain etc. Note: Cement 0.152 cum per 100 sqm
25
34
850
... More
Cement washing including cleaning and smoothening surface thoroughly (cement to be used @ 15 kg/100 m² of surface for one coat and @ 25 kg/100 m² of surface for two coats ) External Surface(ground floor)
a) Two coat (on new works any)
95.8
14
1364.19
... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer” s specification. In ground floor. a) Two coat.
40
49
1960
... More
Supplying, fitting and fixing windows & vertilators with or integrated grills conforming to IS 1038-1975 and manufactured from rolled steel sections conforming to IS 7452-1974 with non-friction projecting type box type hinges, glazing clips lugs, locking brackets, handle plate etc. including hoisting in position straightening if required fixing lugs in cement concrete(1:2:4) with stone chips 19mm. down cutting holes & mending good damaged to match with existing surface complete in all respects excluding glazing. Openable steel windows as per IS sizes with side hung shutters and horizontal glazing bars with or without fixed type ventilators.
a)Without integrated grill
i) Openable steel windows as per IS sizes with hung shutters and horizontal glazing bars with/without fixed type ventilators.
3.6
1663
5986.8
... More
ii) MS integrated grill as per approved design integrated with steel window or ventilator, joints continuously welded with M.S. flats and bar.
75
67
5025
... More
Supplying 1.5 mm thick M.S. sheet fitted & fixed on one or both faces of M.S. or W.I. gate etc. with point welding at not more than 150 mm apart complete in all respect as per design in/c cost of all labour and materials.
2.52
977
2462.04
... More
White washing including cleaning and smoothening surface thoroughly.
Al floors. i) Three coats on new work only
55.8
20
1116.56
... More
Painting two coats on steel or other metal surface with synthetic enamel oil bound primer of approved quality including smoothening surface by sand papering etc.
9.7
29
281.3
... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. using putty etc. on the surface if necessary.
a) On Steel or other metal surface with super gloss (hi-gloss) i) Two coats (with any shade except white)
9.7
79
766.3
... More
Earth work in filling in foundation trenches or plinth with good earth in layer not exceeding 15 cm including watering, ramming etc layer-by-layer complete. ( with earth obtained from excavation of foundation).
5.2
77
403.21
... More
Artificial stone in floor, dado, staircase etc. with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off cor ners including racking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @1.75 kg/sq.m all complete including all materials and labour. In ground floor.
3 mm. thick topping (high polishing grinding on this item is not permitted with ordinary cement i) 25 mm. thick.
10.8
247
2667.6
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a) Pakur Variety
2.8
4711
13192.87
... More
Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in RCC cover slab with necessary opening for operation of valve all complete including cost of labour & materials as per Departmental Dwg. [Reinforcement type:- Other manufactuerers not specified]
i) 80 mm to 150 mm dia pipe
3
11804
35412
... More
Add GST @18% on sum of Item No. 1 to 27
1
43998
43998.42
... More
Add Cess @1% on sum of Item No. 1 to 28
1
2884
2884.34
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%