Public Health Engineering Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date9 Aug 2024
Closing Date2 Sep 2024
Tender Amount₹ 2,70,558 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 7,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbphed/ee/amd/niet-16 Of 2024-2025/11
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_731550_11Bid Award Id
ViewTender No
WBPHED/EE/AMD/NIeT-16 of 2024-2025Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://www.wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Making straight through joint of 3 core 10 mm² Al Ar cable with 3 Core x 4 Sqmm submersible flat cable by supplying Ferrul, rubber and other necessary materials to make the joint leak proof.(Without kit)
1
-
-
... More
Transformer Repairing Portion:-
-
-
-
... More
Transportation of the 100 KVA transformers from DP Colony Head Works site to work shop at Asansol by hired vehicle including loading unloading by engaging skilled & unskilled labour to avoid any sorts of damage as per direction of EIC.
1
-
-
... More
Atfirst opening of cover bolts then removing of Top cover with accessories and bushings next dismantling of Primary and Secondary Coil from core, by debrazing of circuit connection as per direction.
1
-
-
... More
Supply of New Core exchange of damaged.
25
-
-
... More
Restaggaring of cores after dismantling of core structure, cleaning & decarbonising of cores, dry out reassembling of magnetic circuit as per direction of EIC.
1
-
-
... More
Supply of Extra thick coated polyester base super enamelled copper wire for primary coils.
57
-
-
... More
Supply of bright annealed DPc strip copper conductor for secondary coils.
40
-
-
... More
Insulating materials for formation of Primary & Secondary coils, assembling of cores,coils of all three phases.
1
-
-
... More
Formation of primary & secondary coils of all 3 limbs.
1
-
-
... More
Assembling of core & newly formed coils with necessary circuit connection.
1
-
-
... More
Cleaning and decabonising of tanks in interior and exterior portion, varnishing of the newly wound transformer, then placed in heat chamber for baking/dry to driven out of moisture, achiving the proper insulation and improve of the IR Value as per direction.
1
-
-
... More
Supply delivery the following materials at site :-
-
-
-
... More
HT Insulator assembling with fittings
3
-
-
... More
LT Insulator assembling with fittings
4
-
-
... More
Gaskets RC 70C
2
-
-
... More
Misc. Hardware
1
-
-
... More
Transformer oil as per IS:335(1993) specification in a sealed drum.(Make- Approved Make)
210
-
-
... More
Refitting of core & winding with necessary connection with bushings and Placing the top cover and inspection cover in proper position and tighting of nuts and bolts for 100 KVA transformer as per direction of EIC.
1
-
-
... More
Filling the transformer oil through filter machine by new supplied oil after filtration to the 100 KVA transformer engaging skilled and unskilled personnel for increasing IR value as per direction.
210
-
-
... More
Final Testing of the transformer going through this parameter like iron loss,copper loss,eddy current loss and also measuring IR value by well calibrated megger as per direction.
1
-
-
... More
Transportation of the 100 KVA transformer from Workshop Asansol to DP Colony Zone-II by hired vehicle including loading unloading by engaging skilled & unskilled labour to avoid any sorts of damage as per direction of EIC.
1
-
-
... More
Add. GST@18%
1
-
-
... More
Add. Cess@1%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements