Public Health Engineering Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date24 Dec 2024
Closing Soon10 Jan 2025
Tender Amount₹ 38,04,425 
Notes
Download

Costs

Summary

Wbphed/ Ee/hd/niet-23 Of 2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(iii) Depth greater than 20m and upto 30m metre

30

470

14100

... More
iii) Collection of Samples from the bore hole made as per B-a (a) Undisturbed

9

350

3150

... More
(b) Disturbed

9

120

1080

... More
Field Investigation Standard Penetration Tests (S.P.T.) by Split Spoon Sampler in the bore hole as per IS 2131.(i) 0.0m - 10.0m

6

350

2100

... More
(ii) 10.0m-20.0m

6

460

2760

... More
(iii) 20.0m-30.0m

6

570

3420

... More
Laboratory Investigation i) Liquid Limit as per IS 2720 (Part – V).

6

350

2100

... More
ii) Plastic Limit as per IS 2720 (Part – V)

6

350

2100

... More
iii) Grain size analysis by Sieving as per IS 2720 (Part – IV).

6

530

3180

... More
iv) Grain size analysis by Hydrometer Method as per IS 2720 (Part – IV).

6

690

4140

... More
v) Determination of Water Content as per IS 2720 (Part – II).

6

140

840

... More
vi) Determination of Specific Gravity as per IS 2720 (Part – III).

6

460

2760

... More
vii) Direct Shear Test as per IS 2720 (Part – XIII).

6

570

3420

... More
viii) Determination of Unconfined Compression Strength as per IS 2720 (Part – X). a) Undisturbed

6

690

4140

... More
xiv) Determination of Consolidation Properties as per IS 2720 (Part – XIV).

6

920

5520

... More
xvi) Tri-Axial Shear Test. a) Determination of Shear strength Parameters of a specimen tested in Unconsolidated Undrained Tri-axial compression without measurement of pore water pressure as per IS 2720 (Part – XI).

9

920

8280

... More
Preparation and submission of report in 6 (Six) copies, giving all relevant information data like site plan, Bore log and water table, test results, calculations, discussions, suggestions and recommendations in respect of suitable foundation etc. including determination of silt factor calculation of waterways and complete design of foundation including analysis of Bearing Capacities and settlements in bound and presentable form complete as per direction of Engineer-in-Charge. b) Detailed Investigation

1

12500

12500

... More
Carriage of all Disturbed & Undisturbed Samples from site of work to the Divisional office or elsewhere including loading and unloading as per direction of Engineer-in-Charge. Detailed Investigation.

1

1600

1600

... More
Making of foundation design considering the geographical investigation work and submission of 4 set hard copy of foundation drawing and design consideration after duly vetted by the eligible authority as per complete direction & satisfaction of EIC.

1

35000

35000

... More
Providing Bored Cast-in-situ M-25 grade R.C.C. pile in position as per specifications in all kinds of soil including cost of boring using drilling mud to stabilize the bore and flushing the bore of excess mud with freshly prepared drilling fluid by using pumps prior to placing concrete by tremie pipe in one continuous operation and including the cost of all materials and labour for placing of concrete and also including the cost of mobilization and hire charges of all equipment necessary for boring, welding of reinforcement cage as necessary and lowering of reinforcement cage, preparation and placing of concrete, including the cost of concrete but excluding the cost of reinforcement and labour for bending binding etc. complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Work to be executed as per IS: 2911 (Part II Sec 2). Note: 1. The rate provided is exclusive of cost of concrete. Construction wing is to add cost of concrete of desired grade for volume corresponding to 1.0mlength of pile length, to arrive at the complete rate. Also the desired crushing strength is to be mentioned in the space provided in the description of item.The Rate of providing the temporary steel casing upto 3m depth is included. 2.To obtain the complete rate the construction wing have to add cost of concrete volume for 1m length of pile, multiplied by a factor:[1+ { dummylength of pile( max=1.5m) / Individual pile length}] 3. The cost of dismantling the length of the pile above cut off level is to be paid separately. (b) Using tripod and winches (ii) 600 mm. diametre pile.

80

2721

217711.2

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite orsandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom,bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm

18.75

119

2236.31

... More
(b) Depth of excavation for additional depth beyond 1500 mm and upto 3000 mm but not requiring

7.5

192

1442.85

... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) a) Depth upto 1.5 m.

36

386

13896

... More
(b) For additional depth beyond 1.5 m. and upto 3.00 m

14.4

439

6321.6

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

13.52

357

4826.64

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety.

1.35

5197

7026.7

... More
Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture] M 25 Grade Distance 20 Km from Shalimar Rly. Yard (a)For works in foundation,basement and upto roof of ground floor/upto 4m

30

6184

185544.3

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht shall be allowed under 12 (e) for every 4 m or part thereof) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. (a)For works in foundation, basement and upto roof of ground floor/upto 4m

40

368

14720

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. I. SAIL/TATA/RINL

3.5

96393

337376.73

... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.I) For structural members of specified sections weighing less than 22.5 Kg./m

25

72603

1815075

... More
Providing and Painting of structural steel surfaces of bridge members by grit blast cleaning or centrifugal blasting with a suitable abrasive materials like crushed slag in accordance with clause-III of IS 6586 : 1989 immediately before painting , to make the surface free from grease, oil, rust and other foreign materials. The rate includes supply of abrasivesand,fuel, cost of paint including all transportation, lead, lift and labour charges, consumables, tools & plants complete in all respect but exclusive of cost for staging/scaffolding. Painting of approved Zinc-phosphate primer of DFT 65 micron followed by finish coat of Micaceous iron oxide pigmented drying oil type paint of DFT 75 micron.

200

593

118600

... More
b) Assembling, erection I launching of fabricated steel girders in proper position, line, level, alignment including erection of staging and scaffolding, dismantling the same after completion of work. The rate shall be inclusive all complete in all respect with all materials, labour, tools & plants, lead and lift. This item pertains to erection of girders by contractor's own cranes I derricks staging, machineries, plants & equipment etc., wherever required to complete the job, as per approved drawing. The rate is inclusive of all stand by cranes, equipment, machineries etc. as directed by Engineer-in-charge to complete the work.

25

13000

325000

... More
Add GST @ 18%

1

574590

574590.12

... More
Add CESS @ 1%

1

37667

37667.57



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.