Public Health Engineering Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date17 Feb 2024
Closing Date2 Mar 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Wbphe/ee/smd/niet-59 Of 2023-24/1

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Checking of all brazing / gas welding points of coils and leads for rectification wherever necessary prior to re-insulation. Removal of burrs, cleaning of core assembly and varnishing core limb laminations succeeded by re-insulating the old good coils by supplying required insulating materials such as compressed press board, krap paper, perma wood and SRBG with replacement of allied insulating materials viz. Separators, Spacers, Spacer Lock Sticks, Coil Base & Top, Axial Sticks, Coil Holding Studs etc. from inner & inter-layer of winding including supplying of transformer oil necessary for cleaning of entire core assembly.

1

-

-

... More
Supplying of new annealed tinned copper conductors for complete rewinding of HV & LV side windings (R-Phase) using the existing as well as newly supplied copper conductors. (This includes the deduction of cost for old damaged winding retained by the entrusted agency)

1

-

-

... More
Labour charges for copper windings by engaging competent personnel including cost for lead brazing complete. This includes reassembling the transformer part by part including cores and coils as per its original dimensions complete including tanking.

1

-

-

... More
Replacement of all gaskets and oil seals including supplying of necessary fixing materials such as adhesives etc. This includes physical checking, tightening of HV & LV side and physical checking of all bushings, tank & radiator for oil leakage and cleaning of contacts, bolts & nuts etc.

1

-

-

... More
Heating of the complete core-coil assembly at workshop for removing the moisture and improving IR value up to the mark.

1

-

-

... More
Supply & delivery of transformer oil as per IS 335-1993.

150

-

-

... More
Filling the Transformer oil through filter machine by old oil and new supplied oil after filtration in the 2000 KVA transformer by engaging competent manpower for increasing I.R. value as per direction (For Transformer and OLTC.

3000

-

-

... More
Charges for carrying out routine tests on transformer (IR VALUE, MAGNETIC BALANCE, CORE LOSS, COPPER LOSS, HIGH VOLTAGE, DOUBLE VOLTAGE DOUBLE FREQUENCY, VECTOR GROUP, OTI, WTI & BUCHHOLZ RELAY OPERATIONAL CHECK, OLTC MANUAL & AUTO OPERATION CHECK Electrical parameters of repaired transformer shall be same as declared in Manufacturer’s Test Certificate/Name plate details. Permissible variation for % Z (percentage impedance) is acceptable up to ± 5% (five) w.r.t the original. All the instruments/metering equipments involved in testing of the transformers should carry latest calibration certificate as per relevant IS and it should be shown to the testing engineer before commencement of testing.All routine tests shall be carried out in accordance with IS:2026.

1

-

-

... More
Installation of the repaired transformer in position and making all the relevant electrical connections complete followed by testing & commissioning at site.

1

-

-

... More
Add GST @ 18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.