Public Health Engineering Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Machinery and Tools
Water Storage And Supply
Eprocure
Opening Date26 Sep 2024
Closing Date28 Oct 2024
Tender AmountRefer Documents
Costs
EMD
₹ 20,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbphed/ee/amd/niet-29 Of 2024-2025/2
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_758038_2Bid Award Id
ViewTender No
WBPHED/EE/AMD/NIeT-29 of 2024-2025Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://www.wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply and delivery and storage at site 3 Core X 10 Sqmm Al.Ar. Cable , XLPE Insulated 1.1 KV Grade conforming to IS 7098(I).
(Test certificate and guarantee certificate is to be submitted at the time of delivery)(extra cable Stored at site)
1050
-
-
... More
Supplying the fixing rubber insertion for dust and vermin proof entry of 3 Core X 10 mm2 XLPE Al. Ar. Cable at MCC panel.
4
-
-
... More
Supply of GI Wire for cable binding.(12 SWG)
8
-
-
... More
Earth work in excavation of Cable line trenches, in all sorts of soil including removing, spreading or stacking the spoils within a lead of 75 m. as directed &filling the same with excaveted soil including ramming dressing after all complete. The item includes necessary trimming the sides of trenches,levelling,dressing and ramming the bottom,bailing out water as required complete.
-
-
-
... More
Depth of excavation not exceeding 1,500 mm.
144
-
-
... More
Laying of 3 Core X 10 Sqmm Al. Ar. Cable along the length of collecting line including fixing with supplied clamps, nuts and bolts at a suitable interval so as to prevent sagging of cable complete as per direction of EIC.(From Kiosk To RBTW)
800
-
-
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
-
-
-
... More
With earth obtained from excavation of foundation.
144
-
-
... More
Making straight through joint between 1.5 mm2 or 2.5 mm2(motor cable) and supplied 4 mm2 submersible copper cable for extension of motor cable up to required lengh by supplying necessary seal kit to make joints leak proof all complete as per direction.( 1 No Joint for each RBTW)
4
-
-
... More
Making straight through joint of 3 core 10 mm2 and 3 Core X 4 sqmm Cu flat submersible cable by supplying ferule ans necessary socket all complete as per direction.(Without Kit)
4
-
-
... More
Installation of 5.5 KW/7.5 HP submersible pumping machinery along with 80 mm dia. M.S. column pipe part by part in the newly sunk tube wells with an arrangement of derrick, lifting tackles, tools and plants etc. on hire basis and binding the vertical submersible cable with the column pipes properly and fixing M.S. Top Cover on the tube wells with supplying necessary Clamps made of 65 mmX 12 mm thick flat as per reqd length, nuts, bolts, washers etc. all complete as per direction.
4
-
-
... More
Add. GST@18%
1
-
-
... More
Add. Cess@1%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements