Public Health Engineering Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Electrical and Electronics
Eprocure
Opening Date3 Oct 2024
Closing Date23 Oct 2024
Tender AmountRefer Documents
Costs
EMD
₹ 7,304Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_760395_7Bid Award Id
ViewTender No
WBPHED/AE/EMSD-II/NIET_10 of 2024-2025Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Line regulation:- Out put voltage should remain well with ±1% of set voltage (From Minimum to Maximum i.e. either 400V. or 415V. supply variation).
1
-
-
Load regulation : Output voltage should remain neutral well within ±1% of set voltage be ( From no load to full load ) i.e. either 400V. or 415V.
1
-
-
Correction speed:- Better than 35 Volt / Second.
1
-
-
Efficiency:- Better than 95% on full load.
1
-
-
Cut off limit (minimum &maximum ) by limit switch with Audio & Visual.
1
-
-
Metering Indication:- By Selector switch provision should be made available to measure input mains supply and output voltage other stabilizer for load current measurement an Ammeter with selector switch should be available.
1
-
-
Lamp Indication :- For Input & Output should be provided. ( 3 lamps per side ).
1
-
-
MCCB Protection: For Input side.
1
-
-
Load protection : MCCB on each output phase should be available
1
-
-
Output over shoot:- Beyond 210V to . 255V /phase in case of “ MANUAL MODE” & voltage protection :AUTO MODE” operation.
1
-
-
VISUAL Indication for under voltage & over voltage of output.
1
-
-
Manual Mode:- Up & Down correction with O / P voltage over shoot protection. Beyond 210 V-255 V. per phase.
1
-
-
Nature of cooling:- Oil cooled system.
1
-
-
Electric current over load protection .
1
-
-
Circuit for delay output
1
-
-
Input high voltage cut-off above 500 V.
1
-
-
Mode of Operation:- AUTO/MANUAL with a provision to restore the normal working of the unit “STANDBY OPERATION” should be available in case of any Electronic failure in auto mode.
1
-
-
Auto Mode:- Normal * Standby.( Manufacturing test certificate should be Provided at the time of delivery).
1
-
-
Supply and Delivery of foollowing materials at site
1
-
-
100 Amp. 4 pole on load change over switch (Make:Approve make of P.H.E. Dte.)
1
-
-
100 Amp. Re-wireable type TPN main switch (Make: Approve make of P.H.E. Dte.)
1
-
-
100 Amp. 4 way Copper busbar chamber box by 16 SWG sheet steel enclosure including porcelain Chair etc. with painting complete as per direction of the EIC. (Approved make)
1
-
-
25 sqmm. 3 ½ core PVC insulated 1.1KV, AI., Ar. cable(Make: Approve make of P.H.E. Dte.)
40
-
-
Making brick built foundation with supplying of all required materials suitable for the above Voltage stabilizer by (4:1) cement mortar including holding down foundation bolts(If required) and plaster with neat cement finish as per direction of E.I.C.
1
-
-
Fitting, Fixing and connection of above supplied changeover switch, bus-bar and Main Switch as in item no 2/2.01 to 2/2.03 on the wall by supplying all necessary materials to complete the job as per direction of E.I.C
1
-
-
Installation of the above voltage stabilizer of item no. 1 on the foundation including all connection complete as per direction of E.I.C
1
-
-
Drawing and connection of cable on wall as in item no. 2/2.04 and all connection complete with all equipment as per requirement and as per direction
30
-
-
Making joints of the cable by supplying compression type gland thimple, socket etc.as per requirement and as per direction of EIC.
8
-
-
Double earthing the whole installation complying
with IE rule including supplying of all necessary
earthing materials to complete the job as per
direction of EIC.(inside P/H)
1
-
-
Add GST @ 18%
1
-
-
Add LWC @ 1%
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements