Public Health Engineering Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date2 Dec 2022
Closing Date23 Dec 2022
Tender Amount₹ 21,65,940 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.1 KV grade 25 sq.mm 4 core XLPE insulated Al. Ar. armoured cable conforming to IS 7098 (Part-I) 1988, with upto date amendments

40

-

-

... More
Supply, delivery and storage at site of Wall mounted 2 mm. thick epoxy painted sheet steel enclosed front open fully automatic cum manual control motor control centre for operation of the pump motor in STAR-DELTA mode ranging from 7.5-12.5 HP, actuator with RDOL starter, Chlorinator with DOL starter and timer operated outdoor and indoor lighting as per approved drawing and NIT specification as laid in Scope of Work.

2

-

-

... More
Supply and delivery of the following valves, pipes and gauges etc at site:

-

-

-

... More
80mm dia M.S. seamless column pipe(black) 6.8mm to 7.1 mm thick with 150 mm long heavy type socket at one end.

-

-

-

... More
3.00 m long excluding socket having 8T.P.I. thread.

16

-

-

... More
1.50 m long excluding socket, one end having a thread of 11 T.P.I & the other end having a thread of 8 T.P.I.

4

-

-

... More
Heavy type suitable dia MS suspension clamp along with nuts bolts and washer.

4

-

-

... More
Cast Iron wafer type 80mm dia Butterfly Valve generally as per BS-5155, having body of cast iron as per 1S:210 gr. FG-260, disc of SS Gr CF-8, Shaft of St.steel AISI-410,‘O’ ring for shaft seal of Nitrile rubber, valves are suitable for PN 1.0 rating.Valves are operated by suitable RotorkK.range (three phase415 V) multi turn electrical actuator without starter.

2

-

-

... More
80 mm dia CIDF sluice valve-1 no., Non Return Valve-1 no., CIDF 90° bend-1 no., Cl flanged tee-lno. blank flange-1 no., Cl/ MS flanged short piece 0.50 mtr.-1 no, Cl/ MS flanged pipe 1 mtr. 1 no. etc as per IS specification and certification for Construction of delivery pipe line and wash out line.

2

-

-

... More
Heavy type 250 mm dia split type tube well cover with 12 mm thick clamping arrangement including holes of column pipe, air pipe and cable entry with 2 sets heavy type suspension clump, nuts, bolts and washer as per departmental design.

2

-

-

... More
Pressure gauge [H.Gur u/ Febi g] 150 mm dia [0-7Kg/Sq.cm] brass cock and fitting complete[This cost includes 15 mm. dia G.I. pipes and specials]

2

-

-

... More
5O mm. dia. non metalic pipes (IS:14930) and specials for protection of submersible cable

40

-

-

... More
Anti snapping safety device for pump set by supplying suitable size MS clamps two sets and nylon rope of required length including supplying of nuts, bolts and all other materials.

2

-

-

... More
100 Amps porcelin based rewirable type male female kit Kat fuse unit.

8

-

-

... More
100 Amp, 415 V TPN Rewireable type TPN Main switch.

2

-

-

... More
Laying of 25 sq. mm. 4 core AL. ar. Cable in wall/ floor by supplying of all necessary materials as per IE Rules and as per direction.

40

-

-

... More
Installation of the materials (to be supplied under above sl no 1 to 3) such as Pump motor set with column pipes, valves, panel fiting fixing pressure gauge, depth gauge, Non-return valve & drawing delivery out-let & washout line with the supplied specials / accessories by providing antisnapping cage of suitable size including supply of cable gland,sockets etc including brick, sand, cement rod stc as required to complete the job as per direction and up to the entire satisfaction of the EIC.

2

-

-

... More
Making brick pillar 0.25 mtr x 0.25 mtr. for supporting of valves and pipes with 12 mm thick plaster and net cement finish complete

2

-

-

... More
Making suitable size pump foundation with supplying of necessary cement, sand and stone chips including plastering and net cement finish complete

2

-

-

... More
Making double earthing arrangement in compliance with IE rules by G.I. pipe electrode of 5O mm. dia 3 mtr. Long 2 Nos for panel and pumping machinery 25 mm. x 6 mm. G.I. earth strips from earth pit to panel and all other accessories required to complete the work.

2

-

-

... More
Making internal electrification of pump house consisting of two bracket point, one tube light point, two bulk head point, one fan point and 1NO. 74 watt LED fixture with arm bracket at outside and one three pin plug point including supply of all necessary materials to complete the work as per IE rules and as per direction [All the fittings and lamp should be LED type as per choice of EIC)

2

-

-

... More
Supply & delivery of the PVC moulded Chair .

2

-

-

... More
Supply & delivery of thePVC moulded Table .

2

-

-

... More
Supply, delivery & installation of the following Fan as directed by EIC. a) Ceiling Fan 1200mm sweep OR b) Wall mounting Fan 400 mm sweep including Fan clamp as and when required.

2

-

-

... More
Supply, delivery & storage at site of automatically controlled diaphragm type Chlorinator dosing Pump with flow rate 100 LPH and maximum pressure of 10 kg/cm2 with all accessories for pump and motor , foundation bolt , suction and discharge flange and with storage tank of dosing solution of 100 liter capacity and the prime mover to be coupled with pump of 0.5 HP, 3 phase , 1450 RPM ,squirrel cage TEFC induction motor , Motor will be IE3. [ Test & Warranty Certificates are to be submitted at the time of delivery ]

2

-

-

... More
Installation and commissioning of above supplied Chlorinator including supplying of suitable capacity main switch ( Havells) Starter & drawing of power line by supplying PVC copper wire & continuous earthing. This include the cost of all necessary foundation ( at least 200mm height) with concrete mixture ( sand, cement, stone) and neat cement finish by supplying of all required materials and testing the entire set by supplying necessary chemical for at least 04 ( four) hours trial run as per entire satisfaction of the EIC.

2

-

-

... More
Supply and delivery at site of Calcium Hypochlorite granules minimum Cl content 60%-65% in air tight plastic jar (3Kg each) as per direction of EIC ) Test certificate, containing toxic element to be submitted at the time of delivery with showing chlorine percentage of the above materials.

90

-

-

... More
Supply and delivery at site following voltage corrector with electrical accessories.

-

-

-

... More
Supply and delivery at site of 15 KVA, 3 phase Oil cooled type Servo Motor operated copper wound line voltage corrector conforming to IS-9815 (Pt.-1)-1994 suitable for un-balanced input voltage with following specifiction including first filling of oil as per IS-335 where applicable.(Make: Approve make of P.H.E. Dte.) a) Input Voltage:- 3 phase, Main supply may or may not be balanced with respect to Phase to Phase 250V.-500V.Phase to Neutral-145V.-290V. b) Out put voltage:- 3 phase balanced out put voltage. Phase to Phase 400V.or 415V.± 1% ,Phase to Neutral- 230V.-240V.±1% ( Provision should be made to adjust the Variation of out put voltage per phase by a variable pot oil within ± 5% of out put). c) Line regulation:- Out put voltage should remain well with ±1% of set voltage ( From Minimum to Maximum i.e. either 400V. or 415V. supply variation). d) Load regulation : Out put voltage should remain neutral well within ±1% of set voltage be (From no load to full load ) i.e. either 400V. or 415V. e) Correction speed:- Better than 35 Volt / Second. f) Efficiency:- Better than 95% on full load. g) Cut off limit for ( minimum & maximum ) by limit switch with Audio & Visual. h) Metering Indication:- By Selector switch provision should be made available to measure input mains supply and out put voltage other stabilizer for load current measurement an Ammeter with selector switch should be available. i) Lamp Indication :- For Input & Output should be provided. ( 3 lamps per side ). j) MCB Protection: For Input side. k) Load protection : HRC Fuse on each out put phase should be available. l) Output over shoot:- Beyond 210V to . 255V /phase in case of “ MANUAL MODE” & voltage protection :AUTO MODE” operation.(Manufacturing test certificate should be provided at the time of delivery) m) VISUAL Indication for under voltage & over voltage of output. n) Manual Mode:- Up & Down correction with O / P voltage over shoot protection. Beyond 210 V-255 V. per phase. o) Nature of cooling:- Oil/Air cooled system . p) Electric current over load protection . q) Circuit for delay out put . r) Input high voltage cut - off above 500 V. s) Mode of Operation:- AUTO/MANUAL with a provision to restore the normal working of the unit “STANDBY OPERATION” should be available increase of any Electronic failure in auto mode. t) Auto Mode:- Normal * Standby.( Manufacturing test certificate should be Provided at the time of delivery)

2

-

-

... More
100 Amp, 415 V, 4 pole on load changeover switch

2

-

-

... More
100 amp, 415 V TPN Rewireable type Mainswitch

2

-

-

... More
100 Amp 4 way copper busbar chamber box by 16 SWG sheet steel enclosure including porcelain chair etc . With painting complete as per direction of EIC.

2

-

-

... More
25 sqmm, 4 core pvc insulated 1.1 KV grade, Aluminium Armoured Cable.

40

-

-

... More
Making brick built foundation with supplying of all required materials suitable for the above voltage stabilizer by (4:1) cement mortar including holding down foundation bolts and plaster with neat cement finish, sloping all complete as per direction of EIC.

2

-

-

... More
Fitting , fixing of change over switch, Busbar chamber and main switch as mentioned in item no. 15.02 to 15.04 on the iron angle frame of suitable size fixed at suitable position on wall by supplying all necessary fixing materials all complete as per direction of EIC.

2

-

-

... More
Installation of the above voltage stabilizer as in item no. 14.01 on the foundation including making all connection complete as per direction of EIC.

2

-

-

... More
Drawing & connection of cable on wall as in item no. 14.05 & all connection complete with all equipment as per requirement & as per direction of EIC.

40

-

-

... More
Making joints of the cable by Supplying compression type gland thimple socket etc as per requirement & as per direction of E.I.C.

20

-

-

... More
Double earthing the whole installation complying with IE rule including supplying of all necessary earthing materials to complete the job as per direction of EIC.

2

-

-

... More
Commissioning of the installation with full satisfaction of EiC and trial run as per departmental operation & guarding by engaging skilled staff for 90 days.

2

-

-

... More
N.B.:MAKE: AS PER PHE APPROVED VENDOR LIST AND ADDENDUM/CORRIGENDUM (IF ANY)

-

-

-

... More
Add GST @18%

1

-

-

... More
Add Labour Welfare Cess @ 1%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.