Public Health Engineering Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date2 Aug 2024
Closing Date23 Aug 2024
Tender Amount₹ 35,90,549 
Notes
Download

Costs

Summary

Wbphed/ee/jd/e-nit- 13/2024-25 (sl.no.09)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

365.87

118541

324

... More
A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

30

15632

521.07

... More
Cement concrete with 30mm.down graded shingles excluding shuttering. NB Variety. In ground floor.

-

-

-

... More
a) 1:3:6 Proportion

23.4

76308

3261.06

... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.

310.5

206876

666.27

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor

-

-

-

... More
a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

1100

360800

328

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.

-

-

-

... More
a) River bazree

40

180124

4503.1

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16gauge black annealed wire at every inter-section, complete as per drawing and direction.

-

-

-

... More
(a) For work in foundation, basement and upto roof of ground floor

-

-

-

... More
(i) Tor steel / Mild steel II. JSW/JSPL/SHYAM/ SRMB/BMASL/ELECROSTEEL/SSL

3.6

312329

86758.29

... More
Plaster(to wall,floor,ceiling etc.) with sand and cement morter including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface,including throading, nosing and drip course where necessary.

-

-

-

... More
I) In Ground floor

-

-

-

... More
(a) With (4:1) cement morter , 20.mm thick plaster

430

75649

175.93

... More
(b ) With (4:1) cement morter, 15.mm thick plaster

425.5

65148

153.11

... More
(c ) With (4:1) cement morter, 10.mm thick plaster

243.4

30050

123.46

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m

140

4579

32.71

... More
M.S. or W.I. ornamental grill of approved design joints continuously welded with M.S., W.I. flats and bars for windows, railing etc fitted and fixed with necessary screws and lugs in ground floor

-

-

-

... More
i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.

4

40084

10021

... More
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) (a) With carried earth arranged by the contractor within a radius exceeding 5 km. but not exceeding 10 km. including cost of carried earth.

55

28179

512.36

... More
Applying extrior grade Acrylic primer of approved quality and brand on plastered or concrete surface old or new surface to receive decorative textured ( matt finish ) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface thoroughly, complete as per manufacturer's specirfication and as per direction of E.I.C. Two coats

1098

49519

45.1

... More
Protective and decorative acrylic exterior emulsion paint of approved quality as per manufacturer's specirfication and as per direction of E.I.C. to be applied over acrylic primer as required. The rate includes cost of material, labour,scaffolding and all incidental charges but excluding the cost of primer. Normal Acrylic Emulsion Two Coats

1098

73566

67

... More
a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

9

261

29

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc, on the surface if necessary:

-

-

-

... More
(a) On steel or other metal surface with super gloss (hi-gloss)

-

-

-

... More
i) Two coats (with any shade except white.)

9

711

79

... More
Brick work with 1st class bricks in cement mortar (1:4) a) In foundation and plinth

4

20407

5101.8

... More
Painting block letters or digits in Black Japan or any approved paint as per direction. a) Size above 12.5 cm. and upto 15 cm.

155

2325

15

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.b) River bazree

65

248294

3819.92

... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and\ brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section,\ consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural\ members only in finished work as per IS specified weight. \Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no separate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m

0.8

59656

74571

... More
Supplying fitting and fixing 600 mm ( ±30 mm) diametre R.B.T (Reinforced Barbed Tape) Concertina fencing on wall top using concertina coils stretched to approx.6 meters length at site clipped with two nos. of horizontal R.B.T strands which will be tensioned and fixed with the vertical M.S angle iron posts by means of security fasteners (such as 'C' clips, R.B.T clips etc.)

170

69360

408

... More
(2nd SITE)

-

-

-

... More
Earth work in excavation of foundation trenches or drain in all sorts of soil (including mixed soil but excluding lateritc or sand stone ) includig removing , spreading or stacking the spoils within a lead of 75m as directed .The item includes necessary trimming the bottom, bailing out water as required complete.

-

-

-

... More
(a) Depth of excavation not exceeding 1.500mm

66

7871

119.27

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

116

37584

324

... More
A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)

10.5

5471

521.07

... More
Cement concrete with 30mm.down graded shingles excluding shuttering. NB Variety. In ground floor.

-

-

-

... More
a) 1:3:6 Proportion

12.3

40111

3261.06

... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.

123

81951

666.27

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor

-

-

-

... More
a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

400.34

131311

328

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.

-

-

-

... More
a) River bazree

16

72049

4503.1

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16gauge black annealed wire at every inter-section, complete as per drawing and direction.

-

-

-

... More
(a) For work in foundation, basement and upto roof of ground floor

-

-

-

... More
(i) Tor steel / Mild steel II. JSW/JSPL/SHYAM/ SRMB/BMASL/ELECROSTEEL/SSL

1.5

130137

86758.29

... More
Plaster(to wall,floor,ceiling etc.) with sand and cement morter including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface,including throading, nosing and drip course where necessary.

-

-

-

... More
I) In Ground floor

-

-

-

... More
(a) With (4:1) cement morter , 20.mm thick plaster

165

29028

175.93

... More
(b ) With (4:1) cement morter, 15.mm thick plaster

166.78

25535

153.11

... More
(c ) With (4:1) cement morter, 10.mm thick plaster

100

12346

123.46

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m

100

3271

32.71

... More
M.S. or W.I. ornamental grill of approved design joints continuously welded with M.S., W.I. flats and bars for windows, railing etc fitted and fixed with necessary screws and lugs in ground floor

-

-

-

... More
i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.

1

10021

10021

... More
Earth work in filling in compound, tank, low land,ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) (a) With carried earth arranged by the contractor within a radius exceeding 5 km. but not exceeding 10 km. including cost of carried earth.

65

33303

512.36

... More
Applying extrior grade Acrylic primer of approved quality and brand on plastered or concrete surface old or new surface to receive decorative textured ( matt finish ) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface thoroughly, complete as per manufacturer's specirfication and as per direction of E.I.C. Two coats

432

19483

45.1

... More
Protective and decorative acrylic exterior emulsion paint of approved quality as per manufacturer's specirfication and as per direction of E.I.C. to be applied over acrylic primer as required. The rate includes cost of material, labour,scaffolding and all incidental charges but excluding the cost of primer. Normal Acrylic Emulsion Two Coats

432

28944

67

... More
a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

3

87

29

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc, on the surface if necessary:

-

-

-

... More
(a) On steel or other metal surface with super gloss (hi-gloss)

-

-

-

... More
i) Two coats (with any shade except white.)

3

237

79

... More
Brick work with 1st class bricks in cement mortar (1:4) a) In foundation and plinth

2

10203

5101.8

... More
Painting block letters or digits in Black Japan or any approved paint as per direction. a) Size above 12.5 cm. and upto 15 cm.

75

1125

15

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.b) River bazree

15

57298

3819.92

... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and\ brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section,\ consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural\ members only in finished work as per IS specified weight. \Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no separate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m

0.3

22371

74571

... More
Supplying fitting and fixing 600 mm ( ±30 mm) diametre R.B.T (Reinforced Barbed Tape) Concertina fencing on wall top using concertina coils stretched to approx.6 meters length at site clipped with two nos. of horizontal R.B.T strands which will be tensioned and fixed with the vertical M.S angle iron posts by means of security fasteners (such as 'C' clips, R.B.T clips etc.)

70

28560

408

... More
Supplying HDPE (Materials grade PE-100) pipes conforming to IS 4984-1995 with latest revision & amendments if any with necessary HDPE specials including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder,road sub-grade and aits flank but excluding moorum laterite or sand stone / hard rock cutting with chisel required including cutting road flank/ brick pavement etc. without damaging the exisiting telephone/electrical cable line etc.(in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be brone by the agency at his own cost)upto the depth (av.) so as to maintain 1.10m.earth cushion from top of the pipe upto G.L. including loading unloading carrying lowering laying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding/ adopting suitable method (But weld jointing with help of hydraulic tack and trimming machines, Hitter etc. for reaching at necessary melting point of HDPE pipe so that joint can be monolithic) so as to facilitate the maintenance of pipe line locally as per conventional method in future. (A) Pressure Rating : PN 6 (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.

-

-

-

... More
90 mm dia. (O.D.)

203

67193

331

... More
Construction of Sub Base using Local Materials: Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (iv) For Construction of Sub Base by compacting river bed materials. Note: Add cost at site of 1.28 m³ of materials to arrive at the complete rate

85

78771

926.72

... More
Providing FHTC from the existing Cl/DI/uPVC/HDPE/GI/AC distribution pipeline by installing 10 mm NB Gun-metal Ferrule conforming to IS 2692:1989 with latest amendments on the said pipeline with supply, fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipeline, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16)/20mm OD PPR-C (Class - SDR7.4/PN16) pipes upto required length with all necessary special5 1.0 metre below the ground connecting the ferrule including cutting trenches in all sorts of soil and filling up trenches’ as per direction of the Engineer-in-charge and upto a point just inside the premises of the household or as directed by EIC. Supply and installation of a 15mm dia. alloy iron Bib Cock (tested to 21 Kg/cm2) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm dia. with brass spindle (tested to 21 Kg/cm2) to be fitted in a position as directed by E.I.C. G.I pipe of TATA make (medium duly) of 2 metre length with all necessary specials to continue from the end of the PVC/HDPE/PPR-C pipe and upto 1.0 m above ground within the premises of household. Note : 1. PVC pipe shall of Schedule 80 (medium duty) conforming to ASTMD -1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). 2. P'PR-C (Poly propylene Random copolymer) pipe shall be 3-layer confirming to IS:15801 UV stabilised & anti-microbial fusion welded, having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random/fittings. 3. Rate is exclusive supply and delivery of 10mm NB gun-metal Ferrule. Supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100,PN16)/30mm OD PPR-C (Class - SDR7.4/PN16) pipes.

-

-

-

... More
a) Upto 10m length

15

28110

1874

... More
Add GST @ 18%

1

542288

542288.01

... More
Add Labour Wlfare Cess @1%

1

35549

35549.99



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.