Public Health Engineering Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Jan 2025
Closing Soon31 Jan 2025
Tender Amount₹ 8,85,882 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(i) Pakur Variety. (analysis rate) Ground floor ( upto 4 mtr. Height)

12.5

6130

76627.63

... More
Hire and labour charges for shuttering with cantering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor)

-

-

-

... More
(a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of Engineer-In-Charge.

100

324

32400

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.

-

-

-

... More
(a) For works in foundation, basement and upto roof of ground floor/upto 4 m.

-

-

-

... More
(i) Tor steel/ Mild steel .( Other than SAIL/TATA/RINL)

0.98

84555

82948.53

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface]

-

-

-

... More
(ii) With 1:4 cement mortar

-

-

-

... More
(a) 15 mm thick plaster

870

155

134850

... More
Cement washing including cleaning & smoothening surface thoroughly( cement to be used @25 kg /100 sqm. Of surface area for two coats

1840

14

26201.6

... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. In ground floor.

-

-

-

... More
(iii) Two Coats.

1840

49

90160

... More
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. 1x 7.50 Sqm.x28.00Kg/Sqm=2.10 Qntl.

-

-

-

... More
Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor)

-

-

-

... More
i) Grill weighing above 16 Kg./sq.mtr and above

-

-

-

... More
MODE OF MEASUREMENT):-

-

-

-

... More
The weight of grill per sq.m. will be determined by taking the physical weight of fabricated grill and dividing the same by coveredarea of the same

-

-

-

... More
N.B. No shop priming will be allowed to facilitate inspection of workmanship. Weight of grill is to be taken after final grinding and finishing the weld.

2.1

9696

20361.6

... More
(b) Extra for work in grill gate. 1x 6 nos.x1.50Kg/nos=9.00 kg i.e. 0.09 Qntl.

-

-

-

... More
(I) For hanging and locking arrangements including supply of materials and labour complete.

-

-

-

... More
(15% extra over the corresponding item of grill )

0.09

11150

1003.54

... More
ii) For supplying fitting and fixing bottom rollers including all labour complete. 1x 2 nos.x1.50Kg/nos=3.00 kg i.e. 0.03 Qntl.

-

-

-

... More
(5% extra over the corresponding item of grill )

0.03

10180

305.42

... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conformingto IS: 226, IS: 808 & SP (6)- 1964 connected to one another withbracket, gussets, cleats as per design, direction of Engineer-inchargecomplete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming toIS: 816- 1969 & IS: 1995 using electrodes of approved make andbrand conforming to IS:814- 2004, haulage, hoisting and erectionall complete. The rate includes the cost of rolled steel section,consumables such as electrodes, gas and hire charge of all tools andplants and labour required for the work including all incidentalchages such as electricity charges, labour insurance charges etc.

-

-

-

... More
Payment to be made on the basis of calculated weight of structuralmembers only in finished work as per IS specified weight. Paymentfor gusset, bracket, cleat, rivets, bolts and nuts may be make byadding the actual weight of such items with the weight of finishedstructural members or 7% of weight for finished structural membersweighing not less than 22.5 Kg. / m. or 15 % of weight for finishedstructal members weighing less than 22.5 Kg. / m. may be increasedallow for bracket, cleat, rivet, bolts and nuts etc. and no seperatepayment being made for these items, as per direction of Engineer InCharge. The rates are considered for a height of erection 8m. / 2ndfloor level from the ground. Add 1.5% extra over the rate for eachadditional floor or 4m. beyond initiial 8m. or part thereof.

-

-

-

... More
(a)ForStructuralWorksinRoofTrussesetc.usingjoists,channels and angles of specified section weighing less than 22.5 kg/ m

-

-

-

... More
1x2x2.50Mx20.00kg.=100.00kg.

-

-

-

... More
Total=100.00Kg. i.e. 0.10 M.T., Say 0.10 M.T.

0.1

73761

7376.1

... More
Add GST@18%

1

133796

133796.6

... More
Add Cess@1%

1

8771

8771.11



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.