Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date2 Aug 2024
Closing Date2 Sep 2024
Tender Amount₹ 1,04,39,185
Costs
EMD
₹ 2,08,785Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbphed/ee/md/niet_24 Of 2024-2025,sl. No.07
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_726213_7Tender No
WBPHED/EE/MD/NIeT_24 of 2024-2025Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://www.wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Collection of house hold Details at Prescribed Format through Mobile App/Hard Copy including Geo- as directed by EIC and Submission of the same to PHE Dte. in soft copy.
2400
67200
28
Provision for extra supply and laying of 15 mm NB PVC schedule 80)/20 mm OD HDPE (PE 100, PN 16) pipe with all necessary specials 1.00 meter bellow the ground level including cutting trenches in all sorts of soil and filling up trenches as per direction of the E.I.C., beyond 15 mtr length as consider in item No.43
1600
187200
117
Making plain Cement concrete (Mix - 1:2:4) with graded stone chips (20mm niminal size) excluding shuttering and reinforcement if any in ground floor as per relevant IS codes. (0.60 m bellow GL and 0.30 m above GL) for fixing 15 mm dia GI pipe for FHTC or as per direction of E.I.C . (Pakur Variety)
18
91939
5107.74
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof.
-
-
-
(a) upto 150 mm. thick
18
16902
939
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
-
-
-
(a) In ground floor including roof.
24
10728
447
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety.
9.43
53038
5624.39
Making Village Road (Avg. 3M width) crossing by Horizontal auger borng for accomodation of laying of avarage 3(three) nos. 15 mm dia pipes for FHTC or as per direction of Engineer-In-Charge.
960
180480
188
Horizontal road crossing by Augor-boring including boring charge, pipe laying and jointing, making baricates, lighting arrangement etc. all complete as per direction of E.I.C. For 80 mm dia. to 200 mm dia. pipes.
24
119284
4970.19
Hire and labour charges for shuttering with centering and necessery staging upto 4m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and stricking out after completion of works (upto roof of ground floor) a) 25mm to 30mm thick wooden shutering as per deceision & direction of engineer-in-charge
96
31488
328
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (a) 15 mm thick plaster with cm (1:4).
96
15085
157.14
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
96
3142
32.73
Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple,longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required,jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line
measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately. For expose work.
-
-
-
( i) 15 mm dia. medium quality
2880
552960
192
Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C.
-
-
-
N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii) No part payment at any stage on account of supply of materials shall be entertained. iv) Payment will be made on actual consumption of materials. v) UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list.
vi) Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii) All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. ix) No payment will be made without hydraulic test of the pipe line either part or full
-
-
-
(A) Pressure Rating : Class - III
(ii) Laying of pipe line including cost of pipe & fittings /specials but excluding cost of valves.
-
-
-
a) 90 mm(OD)
3600
1231200
342
Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source).
-
-
-
a) 90 mm(OD)
3600
12960
3.6
Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source).
-
-
-
a) 90 mm(OD)
3600
3168
0.88
Add GST @ 18%
0.18
1576651
8759175.4
Add Cess @ 1%
0.01
103358
10335826.97