Public Health Engineering Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date10 Feb 2024
Closing Date21 Feb 2024
Tender Amount₹ 7,33,797
Costs
EMD
₹ 14,676Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_664536_6Bid Award Id
ViewTender No
WBPHED/AE/JSSD/e-NIT-06/23-24Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://www.wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Making rubber gasket joint to CI/DI pipes maintaining proper alignment level etc. by mechanical arrangement with or without using mobile cranes where necessary and with help of all other equipments tools and tackles etc. as required providing lubricants of approved quality and direction of EIC. (rubber gasket will be supplied deptt. free of cost)
-
-
-
200 mm dia.
33
1683
51
150 mm dia.
75
2850
38
Carriage of different type of departmental pipes from Divisional/Sub-divisional store to the work site by truck including loading, unloading, stacking etc. including cost of fuel, lubricant and also cost of driver, helper etc. and all other taxes and charges as applicable as per direction of EIC. Distance = 42.7 Km
-
-
-
e) Above 30 Km upto 40 Km
4
12852
3213
Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985- 2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by
adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. (A) Pressure Rating : Class - III Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
-
-
-
a) 200 mm O.D.
246
379824
1544
Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source). A) For CI/DI pipe
-
-
-
200 mm dia.
180
1009
5.61
150 mm dia.
410
1722
4.2
B) For UPVC/HDPE Pipe
-
-
-
200 mm dia.
246
1387
5.64
Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source).
A) For CI/DI pipe
-
-
-
200 mm dia.
180
428
2.38
150 mm dia.
410
631
1.54
B) For UPVC/HDPE Pipe
-
-
-
200 mm dia.
246
595
2.42
Making flange joint to DI/CI pipes, specials and valves where necessary with supply of required rubber insertion and nut bolts, washers etc. of approved quality and type all complete as per specification and direction of EIC (Nut and bolts shall be of TATA/GKW rate). 200 mm dia.
3
711
237
150 mm dia.
4
880
220
Supply of CI Jeffy coupling as per IS specification.
-
-
-
200 mm dia.
15
32505
2167
150 mm dia.
7
11389
1627
Labour charges for Jeffy joint of all diameter.
22
1864
84.75
Supply at site/local store CIPE and CISS specials as per relevant IS specification with latest smendments including cost of loading, carring, unloading, stacking peoperly and sales tax & all other charges etc. complete as per direction of EIC (Mode of measurement will be on book weight) & specials.
755
71407
94.58
Labour for horizontal boring under pacca road etc. for laying of GI/CI/DI pipeline thorugh horizontal boring including all labour tools and plants and all incidental charges complete as per direction of EIC.
48
10576
220.34
Cutting DI pipe (all class & type) to required length with cutting device etc. and grinding the cutting portion with file as per direction and satisfaction of EIC.
150 mm dia. to 200 mm dia pipe
4
564
141
Bituminous pucca road (approx. 450mm depth) cutting by using gaiti, chisel, hammer etc. and picking uip the withdrawing excavated materials and remove the same within distance of 30mtr. at least all complete for fixing/crossing all dia of pipe line as per direction of EIC
0.2
204
1023
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree
2.5
9534
3813.9
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation
12
2460
205
Submission of complete detailed drawing of distribution system, rising main etc. after execution of work showing position of different types of valves, fittings/specials sluice valve chamber with location, node to node wise in the sanctioned drawing as completion drawing of the water supply scheme as per direction and satisfaction of EIC. The list of dia wise fitting/specials, different pipes ;of valve used in the rising main should be shown in the completion drawing (not separate) with verified by SAE & AE in-charge of the scheme. The above drawing will be submitted in 5 copies.
590
224
0.38
Add GST @ 18%
1
110826
110826.83
Add Labour Wlfare Cess @1%
1
7265
7265.31