Public Health Engineering Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date28 Nov 2024
Closing Date6 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Wbphe/ee/smd/niet-56 Of 2024-25/12

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Running and maintenance and guarding of 30 HP electric motor driven air compressor by engaging of skilled mechanic and unskilled labour continue running 6 hrs per day and guarding 24hrs basis[air compressor supplied by department] [ 2 Nos. x 12 Days] I .e. 24 unit

24

-

-

... More
Running of 40 BHP diesel engine driven generator set including supply of diesel oil , lubricants and sundry materials etc for power supply of electrical motor driven air compressor of 12 days x 6hrs x 2 Nos.

144

-

-

... More
Carrying charges of electric driven compressor with fuel tank and all other materials from work site to store after complete the job including loading and unloading all complete.

2

-

-

... More
Washing the tube well by bucket wash system with the help of 1.5” dia. G.I. Pipe, check valve and other materials on hire basis incl. lowering the tube well by engaging – skilled and unskilled labour with supply of chemicals and other necessary materials required to complete the work as per direction of E.I.C.

2

-

-

... More
Making delivery line connection with fitting fixing of sluice valve, reflux valve etc. incl. supply of nuts & bolts, rubber insertion etc. all complete.

2

-

-

... More
Carrying of submersible pump set, column pipe, valves and specials from Ganga Sagar Store to work site for installation at Kachuberia new tube well and back after mela period as per direction of EIC.

2

-

-

... More
Installation the above submersible set with column pipe by supplying necessary materials and tools on hire basis and skilled labour complete as per direction of EIC (pump sets column pipes etc to be supplied by department)

2

-

-

... More
Running of submersible pump sets at tube well by supplying skilled operating staff as per direction From 06-01-2025 to 17-01-2025= 12 days x 20 Hrs. x 2 nos.

480

-

-

... More
Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories to its existing base and withdrawing the same and storage to the departmental store after Mela as per direction of the EIC

2

-

-

... More
Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work from 06-01-2025 to 17-01-2025 [for 2 Nos. Machine]

12

-

-

... More
Withdrawing of submersible pump motor set after mela period from the tube well by supplying necessary Tools on hire basis and skilled labour as per direction of EIC.

2

-

-

... More
Guarding arrangement of the whole installation of the above item for the entire period round the clock from 06-01-2025 to 17-01-2025

12

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.