Public Health Engineering Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date30 Jul 2024
Closing Date23 Aug 2024
Tender Amount₹ 72,32,648
Costs
EMD
₹ 1,44,653Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbphed/ee/jd/e-nit- 11/2024-25 (sl. No.15)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_724560_15Bid Award Id
ViewTender No
WBPHED/EE/JD/e-NIT- 11/2024-25Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://www.wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. JSW/JSPL/SHYAM/ SRMB/BMASL/ELECROSTEEL/SSL
1.16
101040
87103.74
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 thick wooden shuttering as per direction & decision & of EIC.
183.62
60227
328
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (b) River bazree
22.57
86215
3819.92
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
-
-
-
... More
(i) With 1:4 cement mortar (c) 10 mm thick plaster
377.59
46617
123.46
... More
(i) With 1:4 cement mortar (c) 15 mm thick plaster
200.51
30700
153.11
... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
97.5
3189
32.71
... More
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor (Two Coat) c) Normal Acrylic Emulsion.
125.53
8410
67
... More
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc.
Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no separate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m
0.2
14914
74571
... More
Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work) (ii) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including
the cost of carried earth.
155
65034
419.58
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
88.7
59098
666.27
... More
Supplying HDPE (Materials grade PE-100) pipes conforming to IS 4984- 1995 with latest revision & amendments if any with necessary HDPE specials (excluding cost of CIDF valves) including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder,road sub-grade and aits flank but excluding moorum laterite or sand stone / hard rock cutting with chisel required including cutting road flank/ brick pavement etc. without damaging the exisiting telephone/electrical cable line etc.(in case of damage of any type of cable line by the agency at the time of execution necessary damage charge as applicable by the respective authority will have to be brone by the agency at his own cost)upto the depth (av.) so as to maintain 1.10m.earth cushion from top of the pipe upto G.L. including loading unloading carrying lowering laying fitting fixing carefully pipes, valves and specials with the all types of jointing materials in trenches maintaining proper levels and alignment jointing the pipes and specials by butt welding/ adopting suitable method (But weld jointing with help of hydraulic tack and trimming machines, Hitter etc. for reaching at necessary melting point of HDPE pipe so that joint can be monolithic) so as to facilitate the maintenance of pipe line locally as per conventional method in future. (A) Pressure Rating : PN 6 (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
-
-
-
... More
200 mm (OD)
900
1228500
1365
... More
140 mm (OD)
1500
1083000
722
... More
125 mm (OD)
200
118000
590
... More
110 mm (OD)
350
158900
454
... More
90 mm (OD)
4000
1324000
331
... More
Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source).
-
-
-
... More
B) For UPVC/ HDPE Pipe
-
-
-
... More
200 mm (OD)
800
1936
2.42
... More
140 mm (OD)
1500
2160
1.44
... More
125 mm (OD)
200
248
1.24
... More
110 mm (OD)
350
378
1.08
... More
90 mm (OD)
4000
3520
0.88
... More
Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source).
-
-
-
... More
For HDPE Pipe
-
-
-
... More
200 mm (OD)
800
4512
5.64
... More
140 mm (OD)
1500
6360
4.24
... More
125 mm (OD)
200
764
3.82
... More
110 mm (OD)
350
1323
3.78
... More
90 mm (OD)
4000
14400
3.6
... More
Providing FHTC from the existing Cl/DI/uPVC/HDPE/GI/AC distribution pipeline by installing 10 mm NB Gun-metal Ferrule conforming to IS 2692:1989 with latest amendments on the said pipeline with supply, fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipeline, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16)/20mm OD PPR-C (Class - SDR7.4/PN16) pipes upto required length with all necessary special5 1.0 metre below the ground connecting the ferrule including cutting trenches in all sorts of soil and filling up trenches’ as per direction of the Engineer-in-charge and upto a point just inside the premises of the household or as directed by EIC. Supply and installation of a 15mm dia. alloy iron Bib Cock (tested to 21 Kg/cm2) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm dia. with brass spindle (tested to 21 Kg/cm2) to be fitted in a position as directed by E.I.C. G.I pipe of TATA make (medium duly) of 2 metre length with all necessary specials to continue from the end of the PVC/HDPE/PPR-C pipe and upto 1.0 m above ground within the premises of household.
Note :
1. PVC pipe shall of Schedule 80 (medium duty) conforming to ASTMD -1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I).
2. P'PR-C (Poly propylene Random copolymer) pipe shall be 3-layer confirming to IS:15801 UV stabilised & anti-microbial fusion welded, having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random/fittings.
3. Rate is exclusive supply and delivery of 10mm NB gun-metal Ferrule.
Supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100,PN16)/30mm OD PPR-C (Class - SDR7.4/PN16) pipes.
-
-
-
... More
b) Above 10m upto 20m length
450
1369800
3044
... More
Collection of House Hold Details at Prescribed Format through Mobile App / Hard Copy including Geo-Reference as directed by EIC and Submission of the same to PHE Dte in soft copy.
450
12600
28
... More
Mobilization charges of all tools & Plans along with accessories, material, labour, supervision etc. at site of work required in connection with boring and testing work, including setting to boring rigs and shifting to different Bore-hole points etc. and also including whthdrawal of same from the site after completion of work, complate ad per direction of EIC b) Detailed Investigation.
1
25000
25000
... More
Labour for making Bore-Holes of 150mm to 250mm dia. by any standard method to any depth below ground level / bed level in all kinds of soil like clay, , silt, sand, stiff clay, mixed soils etc. except rocks (for the purpose of collecting Disturbed & Un disturbed soil samples, conducting Standard Penetration Test at suitable intervals etc.) including preparation and submission of bore-log as per IRC : 75 and 78 and Clause 2400 of Specifications for Road & Bridge Works (5th Revision), Published by IRC, and also including hire charges of tools and plants complete as per the direction of Engineer-in-Charge.
30
10200
340
... More
Depth greater than 10m and upto 20m
30
12000
400
... More
Depth greater than 20m and upto 30m
30
14100
470
... More
Field Investigation:
-
-
-
... More
Collection of Samples from the bore hole
made as per B-a (a)Undisturbed
6
2100
350
... More
(b) Disturbed
10
1200
120
... More
Standard Penetration Tests (S.P.T.) by Split
Spoon Sampler in the bore hole as per IS
2131. (i)0.0m - 10.0m
15
5250
350
... More
(ii)10.0m-20.0m
20
9200
460
... More
iii)20.0m-30.0m
20
11400
570
... More
A. Laboratory Investigation:
-
-
-
... More
i) Liquid Limit as per IS 2720 (Part – V).
18
6300
350
... More
ii) Plastic Limit as per IS 2720 (Part – V)
18
6300
350
... More
iii) Grain size analysis by Sieving as per IS 2720
(Part – IV).
18
9540
530
... More
iv) Grain size analysis by Hydrometer Method as
per IS 2720 (Part – IV).
18
12420
690
... More
v) Determination of Water Content as per IS
2720 (Part – II).
6
840
140
... More
vi) Determination of Specific Gravity as per IS
2720 (Part – III).
6
2760
460
... More
vii) Direct Shear Test as per IS 2720 (Part – XIII).
9
5130
570
... More
viii) Determination of Unconfined Compression
Strength as per IS 2720 (Part – X). a) Undisturbed.
6
4140
690
... More
xiii) Determination of Density Index (Relative
Density of cohesion less soil) as per IS 2720
(Part – XIV).
6
5520
920
... More
Tri-Axial Shear Test. a) Determination of Shear strength
Parameters of a specimen tested in
Unconsolidated Undrained Tri-axial
compression without measurement of
pore water pressure as per IS 2720 (Part –
XI).
6
5520
920
... More
Preparation and submission of report in 6 (Six) copies, giving all relevant information data like site plan, Bore log and water table, test results, calculations, discussions, suggestions and recommendations in respect of suitable foundation etc. including determination of silt factor calculation of waterways and complete design of foundation including analysis of Bearing Capacities and settlements in bound and presentable form complete as per direction of Engineer-in-Charge.
1
12500
12500
... More
Carriage of all Disturbed & Undisturbed Samples from site of work to the Divisional office or elsewhere including loading and unloading as per direction of Engineer-in-Charge. Detailed Investigation.
1
1600
1600
... More
Add GST @ 18%
1
1092361
1092361.74
... More
Add Labour Wlfare Cess @1%
1
71610
71610.38