Public Health Engineering Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Pipe Line Project
Water Storage And Supply
Eprocure
Opening Date26 Nov 2024
Closing Date16 Dec 2024
Tender Amount₹ 3,64,163
Costs
EMD
₹ 7,283Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_773940_4Bid Award Id
ViewTender No
NIeT NO-25/ALD/2024-2025Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dewatering from the excavated trenches for repairing any type of pipe line including Hire Charge of pump / carriage / Fuel & lubricant / Operator etc. for big dia pipes more, than 200 mrn dia all complete as per direction of EIC. (This item will be executed after the permission of E.l.C.)
4
931
3724
... More
Cleaning the chokage of AC/DI/CI / UPVC Pipes in the existing line by split bamboo passing through the new pit on the line and cleaning silt, bats or any obstructed materials in the line and cleaning by washed water. (Work to be executed as per prior approval and direction of EIC).
16
84
1344
... More
Supplying fitting & fixing gun metal wheel valve of approved brand and make tested to 21 kg per sq.cm (for water lines only). Iv)50 mm dia.
15
2277
34155
... More
Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in RCC cover slab with necessary opening for operation of valve all complete including cost of labour & materials as per Departmental Dwg. [Reinforcement type:- Other manufactuerers not specified]
i) 80 mm to 150 mm dia pipe
10
11835
118350
... More
ii)200 mm dia pipe.
4
14997
59988
... More
Extra repairing charges over item no 2 for changing of gland packing of sluice valve/air valve with supplying of gland packing grease etc. bailing out of water including removing the top cover slab of vaIve chamber and refixing the same after completion of work as per direction of EIC.
a) 150 mm dia. to 250 mm dia.
5
322
1610
... More
Taking out of old and damaged valve of any type from the existing line after dismantling of Flange Joint or Socket Joint and fitting, fixing of New Valve. ( Cost of dismantling of joint and renewing the same to be added with this item to complete the job in all respect )
i) 125 mm to 150 mm dia
2
280
560
... More
i) 200 mm to 250 mm dia
2
500
1000
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm
10
119
1192.7
... More
beyond 1.5 mtr upto 3.0 mtr but not requiring shoring.
5
192
961.9
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
3
77
232.62
... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof. (a) upto 150 mm. thick
10
939
9390
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
10
4006
40060
... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacture's specification. Two coats.
81
49
3969
... More
Panel shutters of door and window, as per design (each panel consisting of single plank without joint), including fitting and fixing the same in position but
excluding the cost of hinge and other fittings. In ground floor. (In case of non-supply of single plank, penal rate of reduction of 20% will be made)(iii) 35mm thick shutters with 19mm thick panel of size 30 to 45 cm. (c) Other Local Wood.
4
2789
11156
... More
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals).d) Sal : Local.
0.05
81936
4096.8
... More
(b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
5
38
190
... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :
(a) On timber or plastered surface :(iv) Two coats (with any shade except white)
5
81
405
... More
Supplying and laying standard four course bituminous water proofing treatment as per specification laid down in I.S. 1346 - 1991 to be finished with pea size gravel including necessary preparatory works such as shaping mouth of outlets, cutting as and where necessary and refilling with sand and Cement mortar (4:1) or Cement Concrete (1:2:4) with graded stone chips before undertaking the treatment including cutting grooves in parapet and inserting edge of felt and mending good damage complete in all respect as per direction of Engineer - in - Charge including cost of all materials and labours and incidental charges but excluding the cost of Cement Mortar or concrete required for levelling and grading. (In sloped roof Course sand of approved varieties is to be used in place of Pea size gravels as fourth and final course.) i) 1st and 3rd Course with bonding materials of hot applied industrial blown type bitumen of grade 85/25 or 90/15 conforming to I.S.702 - 1988 @ 12Kg/10Sqm on each layer. ii) 2nd course with Hessian base self finished bitumen type3 Gr.-I conforming to I.S. 1322-1993 (weighing 23kg/10Sqm gross with bitumen content 12.10kg/10Sqm ) tested under the provision of I.S. 13826 - 1993 part VII iii) 4th course with washed and clean pea sized gravel or grit @ 0.006 cum/Sqm. A. Over Flat Roof.
10
320
3200
... More
Add 18% GST
1
55000
55000.26
... More
Add 1% Cess
1
3605
3605.57