Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Works
Electrical and Electronics
Solar Installation and Products
Eprocure
Opening Date1 Aug 2024
Closing DateCancelled
Tender Amount₹ 60,57,896 
Notes
Download

Costs

Summary

Supply, Delivery, Installation, Commissioning And Trial Run Upto 7.5 Hp Submersible Pump Motor Set With Solarization Project With 10. Kwp Solar Photovoltic Panel Along With Related Accessories For Daribas Pratham Khanda Water Supply Scheme Tw No.- I

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply & delivery Photovoltaic upto 7.5HP 415 Volt 3 Phase solar pump controller consist of Change Over Switch for Solar DC and Ac operation , and Consist of IEC Certificates EN IEC61800-3:2018 , 61000-3-2:2019+A1:2021 , 61000-3-3:2013+A1:2019+A2:2021 , EN IEC 61800-3:2018 ,IEC 61000-4-2:2009 , IEC 61000-4-3:2020 , IEC 61000-4-4:2012 , IEC 61000-4-5:2014+A1:2017 , IEC 61000-4-6:2014 , IEC 61000-4-8:2009 , IEC 61000-4-11:2020 , EN 61800-5-1:2007+A1:2017+A11:2021 and CE Certificate . Maximum Power Point tracker (MPPT) is to be provided for optimal use the Solar panel and maximize the water discharge, Inverter should be provided for the systems as to operate AC motors, The system shall have full protection against open circuit, accidental short circuit and reversed polarity, The whole system is to be properly earthed and shall generally conform to IS:3043 / 1987 (latest amendment thereof and requirements of Indian Electricity Rules, 1956, there should beadequate protection from lightning and hail storm., The power conditioning unit should be mounted in lock and key steel enclosure having at least IP54 protection to be installed at a suitable position on civil structure. The controller must have change over switch to run from grid connection in night or cloudy days. (Brand - "INNATA").

3

-

-

... More
The Structure Mounting of Solar Panels should be designed that they face the sun Optimally. Only Anti Thefts Fasteners should be used in mounting structure with RCC Foundation Design all Possible Load (Dead, Live and Imposed load) along with BIS Specification and Corrosion Resistance., It should be framed in Hot Dip Galvanised Structure Supported by Design which can withstand 150 Km/hr wind velocity. 4 Solar Modules in Each Structure and assuming Each Structure weight 100-115 Kg,

3

-

-

... More
Supply & delivery of the following Electrical accessories:-

-

-

-

... More
1.1 KV grade 4 sq.mm x 3 Core water proof flat submersible cable for above motor

150

-

-

... More
Making double earthing arrangement in compliance with IE rules by G.I. pipe electrode of 5O mm. dia 3 mtr. Long 2 Nos for panel and pumping machinery 25 mm. x 6 mm. G.I. earth strips from earth pit to panel and all other accessories required to complete the work. ( 2 Nos for Solar Structure , 2 Nos for Piller Box , 1 for Pump , ) As per IS 3043 (1987) .f 8 T.P.I.

6

-

-

... More
4 Sq.mm,1 core Multi Strain Fire Reterdent Cu Cable .(200 mtr for each pump house)

600

-

-

... More
Supply ,delivery and fitting fixing at site of Ligtning Arrester 7 Meter High Bottom Dia 5 Inches Top Dis 4 Inches Fabricated Pipe With Copper Lighting Arrester Connected through 3 MM Copper Srip with 3 Nos Earthing as Per IS 3043 (1987)

3

-

-

... More
Supply & delivery of the following Mechanical accessories:-

-

-

-

... More
3 mtr long 80 mm dia UPVC standard type column pipe [cream color) with bothside threaded and one end side socketed with registered KPMG

21

-

-

... More
1.5 mtr long 80 mm dia UPVC standard type column pipe [cream color) with both side threaded and one end si de socketed with registered KPMG

6

-

-

... More
80 mm dia Cl top & bottom adopter

6

-

-

... More
Heavy type suitable dia MS suspension clamp along with nuts bolts and washer

6

-

-

... More
80 mm dia CIDF sluice valve-2 nos., Non Return Valve-1 no., CIDF 90° bend-2 nos., Cl flanged tee-1 no. blank flange-1 no., Cl/ MS flanged short piece 0.50 mtr.-2 nos, Cl/ MS flanged pipe 1 mtr. 2 nos. etc as per IS specification and certification for Construction of delivery pipe line and wash out line.

3

-

-

... More
Heavy type 200 mm dia split type tube well cover with 12 mm thick clamping arrangement including holes of column pipe, air pipe and cable entry with 2 sets heavy type suspension clump, nuts, bolts and washer as per departmental design

3

-

-

... More
Pressure gauge [H.Gur u/ Febi g] 150 mm dia [0-7Kg/Sq.cm] brass cock and fitting complete[This cost includes 15 mm. dia G.I. pipes and specials]

3

-

-

... More
5O mm. dia. non metalic pipes (IS:14930) and specials for protection of submersible cable

30

-

-

... More
Anti snapping safety device for pump set by supplying suitable size MS clamps two sets and nylon rope of required length including supplying of nuts, bolts and all other materials.

3

-

-

... More
Installation of above pump motor, panel, valves and specials as in sl. NO. 1, 2 & 3 including supply of cable gland,sockets etc including brick, sand, cement rod stc as required to complete the job as per direction and up to the entire satisfaction of the EiC.

3

-

-

... More
Making brick pillar 0.25 mtr x0.25 mtr. for supporting of valves and pipes with 12 mm thick plaster and net cement finish complete

3

-

-

... More
Making suitable size pump foundation with supplying of necessary cement, sand and stone chips including plastering and net cement finish complete

3

-

-

... More
Making internal electrification of pump house consisting of two bracket point, one tube light point, two bulk head point, one fan point and one three pin plug point including supply of all necessary materials to complete the work as per IE rules and as per direction [All the fittings and lamp should be LED type as per choice of EIC)

3

-

-

... More
Supply & delivery of the PVC moulded Chair .

3

-

-

... More
Supply & delivery of thePVC moulded Table .

3

-

-

... More
Supply, delivery & installation of the following Fan as directed by EIC. a) Ceiling Fan 1200mm sweep OR b) Wall mounting Fan 400 mm sweep including Fan clamp as and when required.

3

-

-

... More
SOLAR FOR CHLORINATION PUMP

-

-

-

... More
Supply & deliveryPhotovoltaic 1 HP 415 Volt 3 Phase solar operated Dosing pump controller consist of Change Over Switch for Solar DC and Ac operation , and Consist of IEC Certificates EN IEC61800-3:2018 , 61000-3-2:2019+A1:2021 , 61000-3-3:2013+A1:2019+A2:2021 , EN IEC 61800-3:2018 ,IEC 61000-4-2:2009 , IEC 61000-4-3:2020 , IEC 61000-4-4:2012 , IEC 61000-4-5:2014+A1:2017 , IEC 61000-4-6:2014 , IEC 61000-4-8:2009 , IEC 61000-4-11:2020 , EN 61800-5-1:2007+A1:2017+A11:2021 and CE Certificate . Maximum Power Point tracker (MPPT) is to be provided for optimal use the Solar panel and maximize the water discharge, Inverter should be provided for the systems as to operate AC motors, The system shall have full protection against open circuit, accidental short circuit and reversed polarity, The whole system is to be properly earthed and shall generally conform to IS:3043 / 1987 (latest amendment thereof and requirements of Indian Electricity Rules, 1956, there should beadequate protection from lightning and hail storm., The power conditioning unit should be mounted in lock and key steel enclosure having at least IP54 protection to be installed at a suitable position on civil structure. The controller must have change over switch to run from grid connection in night or cloudy days. (Brand - "INNATA")

3

-

-

... More
Supply & delivery of 1700 Wp ( 50 Wp X 34 Nos ) Solar Photovoltaic Module (for 1 HP 415 Volt 3 Phase Chlorinator Pump) Confirming BIS Certificate and ALMM Listed .The efficiency of the PV modules should be minimum 14% and fill factor should be more than 70%.

5100

-

-

... More
The Structure Mounting of 1700 Wp Solar Panels should be designed that they face the sun Optimally. Only Anti Thefts Fasteners should be used in mounting structure with RCC Foundation Design all Possible Load (Dead, Live and Imposed load) along with BIS Specification and Corrosion Resistance., It should be framed in Hot Dip Galvanised Structure Supported by Design which can withstand 150 Km/hr wind velocity. 4 Solar Modules in Each Structure and assuming Each Structure weight 100-115 Kg,

3

-

-

... More
Supply, delivery & storage at site of automatically controlled plunger type Chlorinator dosing Pump with flow rate 100 LPH and maximum pressure of 10 kg/cm2 with all accessories for pump and motor , foundation bolt , suction and discharge flange and with storage tank of dosing solution of 100 liter capacity and the prime mover to be coupled with motor of 0.5 HP, 3 phase , 1450 RPM ,squirrel cage TEFC induction motor , Motor will be IE3. [ Test & Warranty Certificates are to be submitted at the time of delivery ]

3

-

-

... More
Installation and commissioning of above supplied Chlorinator including supplying of suitable capacity main switch ( Havells) Starter & drawing of power line by supplying PVC copper wire & continuous earthing. This include the cost of all necessary foundation ( at least 200mm height) with concrete mixture ( sand, cement, stone) and neat cement finish by supplying of all required materials and testing the entire set by supplying necessary chemical for at least 04 ( four) hours trial run as per entire satisfaction of the EIC.

3

-

-

... More
Supply ,delivery and fitting fixing of Solar Street Light for 11 Watt with 50 Wp 36 Cell Poly Solar Module , Li-on Battery with 3 Days Backup. Galvanized Pole Height 3 Mtr . 3.000 Nos

4

-

-

... More
Supply and delivery at site of Calcium Hypochlorite granules minimum Cl content 60%-65% in air tight plastic jar (3Kg each) as per direction of EIC ) as per direction of E.I.C. Test certificate, containing toxic element to be submitted at the time of delivery with showing chlorine percentage of the above materials.

135

-

-

... More
Installation of SPV module, controller, structure and allied item as per MNRE guidline.

3

-

-

... More
Commissioning of the installation with full satisfaction of EiC and trial run as per departmental operation & guarding by engaging skilled staff for 3 month.

3

-

-

... More
N.B.:Make as per MNRE approved ALMM and Phed approved vendor list

-

-

-

... More
Add GST @18%

1

-

-

... More
Add Labour Welfare Cess @ 1%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.