Public Health Engineering Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing Date30 Oct 2024
Tender Amount₹ 45,25,867
Costs
EMD
₹ 90,517Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Et/10/se/gta Circle /phe Dte.of 2024-25 (sl. No. 24)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PHED_758895_24Bid Award Id
ViewTender No
eT/10/SE/GTA CIRCLE /PHE DTE.OF 2024-25 (SL. NO. 01 to 95)Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing & Labour for laying 150 mm. to 200
mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics including rolling and preparing the bed to proper level and filling up all joints with sandy
clay or earth.
170.1
10886
64
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
-
-
-
... More
a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of
Engineer-In-Charge.
996.3
399317
400.8
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal
size) excluding shuttering and reinforcement,if any, in gound floor as per
relevant IS codes.
(b) River bazree
129.88
798437
6147.5
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
-
-
-
... More
(i) Tor steel/Mild Steel
10.8
1138683
105433.7
... More
PIPE SUPPORT ALONG ALIGNMENT OF 220 NOS FOR SURFACE WATER BASED HATTA PWSS TO ACCOMMODATE FHTC IN DARJEELING PULBAZAR BLOCK WITHIN DARJEELING DISTRICT.
-
-
-
... More
Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed.
335.25
3352
10
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the
bottom, bailing out water as required complete.
-
-
-
... More
(a) Depth of excavation not exceeding 1,500 mm.
255.12
30428
119.27
... More
(A) Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
9.05
15970
1764.73
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of
ground floor)
-
-
-
... More
a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of
Engineer-In-Charge.
331.78
132977
400.8
... More
PWD(WB) Bld Wrk, Pg No 26-It. No 10 (ii), 3rd Corrigenda Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (b) River bazree
77.17
536186
6948.12
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
-
-
-
... More
(i) Tor steel/Mild Steel
6.85
722220
105433.7
... More
ADD GST @18 %
1
683550
683550.92
... More
ADD CESS@1%
1
44810
44810.56
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements