Public Health Engineering Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Construction Material
Water Storage And Supply
Eprocure
Opening Date9 Dec 2022
Closing Date20 Dec 2022
Tender Amount₹ 2,70,324
Costs
EMD
₹ 5,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbphed/25/ee/nacd-ii Of 2022-23
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_PHED_431387_1Bid Award Id
ViewTender No
WBPHED/25/EE/NACD-II OF 2022-23Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Page No-2 Item No-4 (Approved rate of SE/EC vide Memo No 1627/EC. Dt : 29/08/2018 w.e.f. 01/09/2018): 'Labour for boring (horizontal) through any kind of soil for road crossing LDS including hire charges & labour for supply of subtable dia crossing upto full width road with necessary tools, trackles, inclu. Necessary arrangement for boring & pushing reqd. inclu. fixing, jointing, pumping out accumulated water, lighting arrangement, sealing of two casing ends by B/W (1:4) etc. as per direction of EIC. (B/W to be given seperately) (calculated Base rate).
-
-
-
80 mm dia
12
3543
295.29
Making Village Road (average 3m width) crossing by horizontal auger boring for accomodation of laying of average 3 (three) nos. 15mm dia Gl pipes for FHTC or as per direction of Engineer-in-Charge.
80
15040
188
Collection of House Hold Details at Prescribed Format through Mobile App / Hard Copy including Geo-Reference as directed by EIC and Submission of the same to PHE Dte in soft copy.
40
1120
28
Supplying, fitting and fixing PVC pipes for underground work of approved make of Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I). with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted including cost of all materials, jointing materials, cutting pipes, making threads ,cutting trenches upto 1.5 metre below surface in all sorts of soil and refilling the same as directed complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials No separate payment will be made for accessories, specials.) PVC Pipes (Dia)
25 mm dia
6
1146
191
40 mm dia
6
1866
311
Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C
-
-
-
N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line.
ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list.
iii)No part payment at any stage on account of supply of materials shall be entertained.
iv)Payment will be made on actual consumption of materials.
v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list.
vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so.
vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of
entire item.
viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill
-
-
-
(A) Pressure Rating : Class - III
(ii) Laying of pipe line including cost of pipe & fittings/specials but
excluding cost of valves. i) 63 mm OD UPVC line
120
24240
202
ii) 75 mm OD UPVC line
140
36120
258
ii) 90 mm OD UPVC line
130
44460
342
Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source) B) For UPVC/HDPE Pipe
75 mm OD UPVC line
140
96
0.69
90 mm OD UPVC line
150
132
0.88
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m
In ground floor including roof (a) upto 150 mm. thick
1.5
1408
939
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety
2
11438
5719
Add GST @12% on all the above items
1
28676
28676.47
Labour welfare cess 1% on all the above items
1
2676
2676.47