Public Health Engineering Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date29 Jul 2024
Closing Date14 Aug 2024
Tender Amount₹ 10,22,060 
Notes
Download

Costs

Summary

Wbphed/ee/md/niet_18 Of 2024-2025, Sl. No. 20

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
( a ) From 6 Mtr. to 60 Mtr.

54

23895

442.5

... More
( b ) From 60 Mtr. to 90 Mtr.

30

14610

487

... More
( c ) From 90 Mtr. to 120 Mtr.

30

16065

535.5

... More
( d ) From 120 Mtr. to 150 Mtr.

30

17670

589

... More
( e ) From 150 Mtr. to 180 Mtr.

10

6480

648

... More
2)Rate for reaming by 12 1/4 " dia. bit will be @ 14% of item rate.

-

-

-

... More
( a ) From 6 Mtr. to 60 Mtr.

54

6690

123.9

... More
( b ) From 60 Mtr. to 90 Mtr.

30

4090

136.36

... More
( c ) From 90 Mtr. to 120 Mtr.

30

4498

149.94

... More
( d ) From 120 Mtr. to 150 Mtr.

30

4947

164.92

... More
( e ) From 150 Mtr. to 180 Mtr.

10

1814

181.44

... More
3)Rate for reaming by 15 " dia. bit will be @ 16% of item rate.

-

-

-

... More
( a ) From 6 Mtr. to 60 Mtr.

54

7646

141.6

... More
( b ) From 60 Mtr. to 90 Mtr.

30

4675

155.84

... More
( c ) From 90 Mtr. to 120 Mtr.

30

5140

171.36

... More
( d ) From 120 Mtr. to 150 Mtr.

30

5654

188.48

... More
( e ) From 150 Mtr. to 180 Mtr.

10

2073

207.36

... More
Supplying and delivery of the following accessories

-

-

-

... More
a) UPVC Cap 200 mm. Dia.

2

2744

1372

... More
c) M.S. Housing clamp 200 mm dia.

1

3252

3252

... More
d) M.S Centre Guide ( Special type)

6

5700

950

... More
Lowering the tube well assembly (UPVC Casing pipe ,well pipe, strainer along with UPVC accessories) vertically in a position with proper lowering arrangement by applying necessary jointing compound including labour cost for subsequent gravel packing and machine operation cost etc.

1

26571

26571

... More
Cost of Consumables for drilling rigs and machineries

1

22077

22077

... More
Supply and delivery of Washed gravels size ranging from 1.80 mm to 4.74 mm. conforming to IS 4097 : 1967.

10

38100

3810

... More
Packing the side of the tube well housing pipe with puddle clay & with good quality local earth as per direction.

48

921

19.2

... More
Supply and delivery of Bentonite Powder conforming to IS 6186:1986

3

41889

13963

... More
Development (Min. 8 Hr. continuous) of tube well by using suitable air compressor (Min. Capacity: 600CFM & operating Pressure 14 Bar) followed by yield testing with BHT pump (Head :45 to 50mtr.,Discharge :1100 to 1000 LPM and 25 BHP engine) all complete including To & Fro Transportation cost and Cost of fuels, lubricants & Labour etc.

1

56908

56908

... More
Water sample collection and chemical test including Arsenic Test.

1

2425

2425

... More
Electro-logging charge.

1

15715

15715

... More
Supply and delivery of UPVC pipe (CM) conforming to IS 12818:2010. (CIPET Certified)

-

-

-

... More
a) 200 mm dia.

130

292240

2248

... More
Supply and delivery of UPVC Deep Well Screen (RDS) Pipes with Ribs conforming to IS 12818:2010. (CIPET Certified). a) 200 mm dia.

30

99150

3305

... More
Transportation cost of drilling equipment and accessories rig machine etc. including cost of fuel lubricant & loading unloading the materials from store/stack yard/ suppliers godown and unloading/stacking the same at site. (Up to 60 Km distance)

1

59786

59786

... More
Add GST 18.00 %

857576.6

154363

0.18

... More
Add Labour Welfair Cess 1%

1011940.39

10119

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.