Public Health Engineering Department Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Public Health Engineering Department - PHED Tender

Civil And Construction
Opening Date13 Oct 2018
Closing Date2 Nov 2018
Tender Amount₹ 35,11,445 
Notes
Download

Costs

Summary

Et/03/ee/nkwsmd/18-19(sl. No. 3)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
a. without rolling but including ramming.

170.9

9666

56.56

... More
Supply of stone boulder (N.B. variety) of approved quarries above 150 mm to 200 mm dia size.

-

-

-

... More
a) Local approved quarry variety

-

-

-

... More
b) local variety

35.5

43416

1223

... More
Carraige of materials by head load from road side to actual work site.

-

-

-

... More
a. cement @ Rs 9.05 *((3000-50)/50)

65.39

34914

533.95

... More
b. steel @ Rs 15.84 *((3000-50)/50)

2.78

2598

934.56

... More
(I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor

-

-

-

... More
(B) With local variety

-

-

-

... More
(a) 1:3:6 proportion

20

123370

6168.54

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.

-

-

-

... More
(a) For works in foundation and upto roof of ground floor/upto 4 m

-

-

-

... More
JSW/JSPL/SHYAM/ SRMB/BMASL/ELECROSTEEL/SSL

2.78

266210

95759.24

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)

-

-

-

... More
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

490.6

222428

453.38

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes

-

-

-

... More
(b) River bazree

50.5

401912

7958.67

... More
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.

-

-

-

... More
(i) (1:3:6) proportion

480.49

2107376

4385.89

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)

-

-

-

... More
With earth obtained from excavation of foundation.

35.25

3091

87.71

... More
Hand Packed rough dressed boulder wall with boulders from approved quarries including all carriage of all materials to site.

89

241383

2712.17

... More
Laying in position, re-fixing C.I./M.S. Tyton pipes including fitting, fixing & jointing with necessary valves, specials etc. where necessary including cutting & leveling (pipes, specials & valves & rubber gasket will be supplied by the departmentally).

-

-

-

... More
c) 250 mm dia.

120

16400

136.67

... More
d) 300 mm dia

130

28437

218.75



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.