Public Health Engineering Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Public Health Engineering Department - PHED Tender
Civil And Construction
Opening Date13 Oct 2018
Closing Date2 Nov 2018
Tender Amount₹ 35,11,445
Costs
EMD
₹ 71,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Et/03/ee/nkwsmd/18-19(sl. No. 3)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_PHED_194320_1Tender No
eT/03/EE/NKWSMD/18-19(Sl. No. 3)Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://https://www.wbphed.gov.in/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
a. without rolling but including ramming.
170.9
9666
56.56
... More
Supply of stone boulder (N.B. variety) of approved quarries above 150 mm to 200 mm dia size.
-
-
-
... More
a) Local approved quarry variety
-
-
-
... More
b) local variety
35.5
43416
1223
... More
Carraige of materials by head load from road side to actual work site.
-
-
-
... More
a. cement @ Rs 9.05 *((3000-50)/50)
65.39
34914
533.95
... More
b. steel @ Rs 15.84 *((3000-50)/50)
2.78
2598
934.56
... More
(I) Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor
-
-
-
... More
(B) With local variety
-
-
-
... More
(a) 1:3:6 proportion
20
123370
6168.54
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
-
-
-
... More
(a) For works in foundation and upto roof of ground floor/upto 4 m
-
-
-
... More
JSW/JSPL/SHYAM/ SRMB/BMASL/ELECROSTEEL/SSL
2.78
266210
95759.24
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after
completion of works (upto roof of ground floor)
-
-
-
... More
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
490.6
222428
453.38
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes
-
-
-
... More
(b) River bazree
50.5
401912
7958.67
... More
Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
-
-
-
... More
(i) (1:3:6) proportion
480.49
2107376
4385.89
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
-
-
-
... More
With earth obtained from excavation of foundation.
35.25
3091
87.71
... More
Hand Packed rough dressed boulder wall with boulders from approved quarries including all carriage of all materials to site.
89
241383
2712.17
... More
Laying in position, re-fixing C.I./M.S. Tyton pipes including fitting, fixing & jointing with necessary valves, specials etc. where necessary including cutting & leveling (pipes, specials & valves & rubber gasket will be supplied by the departmentally).
-
-
-
... More
c) 250 mm dia.
120
16400
136.67
... More
d) 300 mm dia
130
28437
218.75