Police Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Police Department - KP Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date30 Dec 2024
Closing Date8 Jan 2025
Tender Amount₹ 4,94,735 
Notes
Download

Costs

Summary

Wbkp/cp/nit-498/ Repair, Rehabilitation And Retrofitting Of R.c.c. Structural Components, South Traffic Guard Building /ten, Dated. 24.12 .2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed

95

19

1805

... More
Cleaning the exposed corroded Reinforcement as well as worn out concrete by sand blasting with air compressor including all materials, hire charges of machineries and labour etc. all complete as per technical specification and direction of the Engineer-in-Charge

72

604

43488

... More
"Guniting concrete surface with cement mortar (25 mm nominal thick) applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification"

28.8

912

26265.6

... More
Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m² of concrete surface).

28.8

309

8899.2

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mmnominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.

1.2

5247

6297.08

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including round off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] (iii) With 1:4 cement mortar (b) 10 mm thick plaster Ground floor

37.44

133

4979.52

... More
1st floor

34.32

137

4701.84

... More
2nd floor

34.32

141

4839.12

... More
3rd floor

34.32

145

4976.4

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including round off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] (iii) With 1:6 cement mortar (b) 15 mm thick plaster

28.5

151

4303.5

... More
1st floor

28.5

155

4417.5

... More
2nd floor

28.5

159

4531.5

... More
3rd floor

9.5

163

1548.5

... More
Supplying. preparing and placement of ready mix non shrink cementious microconcrete having no metalic aggregate or chlorides for repairing and\iackting of damaged R.C.C.members. Themicro concrete should achieve compressive strength not less than 10 |MPaafter 24 hours. 40 Mpa after 7 days and 50 Mpa aftre 28 days at 300C.It should have unrestrained expansion in between 1 to 4%. flexural strength shall not be less than 5MPaafter 28 days. Micro concrete should have a co-efficient of thermal expansion similar to that of the host concrete

3.6

50546

181965.6

... More
Supplying and application of chemical for post Installed rebar connection by ~ using ETA approved for seismic criteria In rebar connection, Including drill/ng .!2 hole to the required depth by rotary hammer drill, cleonlng with brush &jet ~ of clean air, /ill/ng chemical usIng serrated noule to eliminate mIxIng error and in a voldless manner IncludIng charges for all tools & plants. Application to be designed for post· Installed rebars as per ECZ/TR023 or relevant tested i) Cost of post installed rebaring application with chemical as speclfled for 8 mmdia per cm of depth and accepted design guidelines and the design document to be furnished by the manufacturer. The chemical should have ETA apprOVal for seIsmIc criteria .li of rebar fixing whIch should be furnished by manufacturer. The installation Superintending Engineer of the respective circle and Injection process should and the setting instructions should be strIctly followed as per manufacturer'specl/icatlons as approved by EICprior to drlll/ng along with post· Installed rebar embedment design report. The existing concrete member should be scanned using rebar scanner to avoid hitting existing reinforcement in concrete during drilling. Notes : 1)This rate Is excluding the cost of scaffolding. 2)Thls work should not be excuted without specific permission of be executed in the presence oj officer not below the rank 0/ Assistant Engineer to supervise the work minutely. 3) Rebar grouting Is specifically required for extension and strengthening ~ purpose of old or existing RCCstructural members with new RCCstructural ~.:::: members through rebar fixing chemical Item without breaking beam, coloumn, roof slab, lintel, cellina etc.

3200

16

51200

... More
Hire and labour charges for shuttering with centreing and necessary staging upto 4 m using approved stout props and thick hard wood planksof approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. 25mm to 30mm shuttering without staging

67.2

359

24124.8

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. including supply of rods, initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every inter-section, complete as per drawing and direction. For works in foundation, basement and upto roof of ground floor / upto 4 m. Tor steel.(SAIL/TATA/RINL) In ground floor :-

0.45

54940

24723

... More
Sub Total

-

-

-

... More
GST 18%

1

74720

74720.27

... More
LWC 1%

1

4898

4898.33



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.