NHPC Limited Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

NHPC Limited - NHPC Tender

Works
Civil And Construction
Eprocure
Opening Date19 May 2023
Closing Date8 Aug 2023
Tender Amount₹ 2,97,43,967 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Design Manufacture Supply Erection Supervision of Erection Testing and Commissioning Work of Alternate Arrangement of Power Evacuation System from Power House to Switchyard of TLD IV PS Kalijhora
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of GS Earthwire 7/3.15 size as per PTS

1

-

-

... More
Supply of Different Types of insulators as per PTS:(i) Suspension Type 70 KN Insulators

112

-

-

... More
Supply of Different Types of insulators as per PTS: (ii) Tension Type 120 KN Insulators

3120

-

-

... More
Supply of Conductor & Earthwire Accessories as per PTS: (a)Mid span compression joint for ACSR Moose Conductor*

6

-

-

... More
Supply of Conductor & Earthwire Accessories as per PTS:(b)Repair Sleeve for ACSR Moose Conductor*

6

-

-

... More
Supply of Conductor & Earthwire Accessories as per PTS: (c)Vibration Damper for ACSR Moose Conductor*

100

-

-

... More
Supply of Conductor & Earthwire Accessories as per PTS: (d)Mid span compression joint for 3/7.15 mm GS Earthwire

2

-

-

... More
Supply of Conductor & Earthwire Accessories as per PTS: (e)Flexible Copper Bond for 7/3.15mm GS Earthwire

10

-

-

... More
Supply of Conductor & Earthwire Accessories as per PTS: (f) Vibration Damper for 7/3.15 mm GS Earthwire

20

-

-

... More
Supply of Conductor & Earthwire Accessories as per PTS: (g) Tension Clamp for 7/3.15 mm GS Earthwire

10

-

-

... More
Supply of Conductor & Earthwire Accessories as per PTS: (h) Single Suspension Pilot Insulator (Suitable for 70 KN CLR Insulators) Hardware fittings suitable for Single ACSR Moose Conductor

8

-

-

... More
Supply of Conductor & Earthwire Accessories as per PTS: (i) Double Tension Insulator (Suitable for 120 KN CLR Insulators) Hardware fittings suitable for Single ACSR Moose Conductor

52

-

-

... More
Supply of Earthing Materials for Towers: (a) Counterpoise Type (120m Length)

2

-

-

... More
Survey: (a) Detailed survey including route alignment, profiling, tower spotting etc. using modern survey technique

1

-

-

... More
Survey: (b) Check Survey

1

-

-

... More
Erection of towers, its body extensions, leg extensions (complete) including bolts and nuts, anti theft measure etc. as per PTS of Towers: (a) DD+0 (Standard Tower)

1

-

-

... More
Erection of towers, its body extensions, leg extensions (complete) including bolts and nuts, anti theft measure etc. as per PTS of Towers: (b) DD+9M Extn.

1

-

-

... More
Erection of Earthing of Towers (Supply of Charcoal and Salt to be included in pipe type earthing, while Al. lugs to be included in counterpoise earthing): (a) Counterpoise type (120m length)

2

-

-

... More
Installation of insulator strings complete with arcing horns & necessary hardware, installation and stringing of conductor including fixing of conductor accessories, installing & stringing of earthwire including fixing of earthwire accessories for: (a) Double Circuit (Normal Section)

0.7

-

-

... More
Dismantling of D/C erected tower structures including insulators, hardwares, anticlimbing device etc. and hand over the same to NHPC Limited's store as per instruction of EIC (per tower LS)

2

-

-

... More
Removal of Conductors, groundwire etc., per route KM of D/C Line and handover the same to the NHPC's Store as per instruction of EIC

1

-

-

... More
Benching: (a) Fissured Rock

2090

-

-

... More
Benching: (b) Hard Rock

4054

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (A)Tower Type DD+0: (i) Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out of water as required complete: (a) Depth of excavation not exceeding 1,500 mm

39.02

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (A)Tower Type DD+0: (i) Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out of water as required complete: (b) Depth of excavation for additional depth beyond 1,500 mm and upto 3,000 mm but not requiring shoring

40.08

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (A)Tower Type DD+0: (i) Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out of water as required complete: (c) Add extra for cutting lateriate/sandstone-Cutting with chisel

79.09

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (A)Tower Type DD+0: (ii) Ordinary Cement Concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS Codes. River Bazree

11.38

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (A)Tower Type DD+0: (iii) Cement Concrete with graded stone ballast (40 mm size excluding shuttering) in ground floor with N.B. variety stone metal-1:3:6 proportion.

1.51

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (A)Tower Type DD+0: (iv) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc., initial straightening and removal of rust (if necessar), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 guage black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4m -Tor Steel/Mild Steel-SAIL/TATA/RINL

1.11

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (A)Tower Type DD+0: (v) Hire and labour charges for shutering with centering and necessary staging upto 4 m using approved stout props and thick hardwood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)

48.28

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (A)Tower Type DD+0: (vi) Earthwork in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm, including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) -with earth obtained from excavation of foundation.

66.2

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (B)Tower Type DD+9: (i) Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out of water as required complete: (a) Depth of excavation not exceeding 1,500 mm

42.14

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (B)Tower Type DD+9: (i) Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out of water as required complete: (b) Depth of excavation for additional depth beyond 1,500 mm and upto 3,000 mm but not requiring shoring

43.24

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (B)Tower Type DD+9: (i) Earthwork in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out of water as required complete: (c) Add extra for cutting lateriate/sandstone-Cutting with chisel

85.37

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (B)Tower Type DD+9: (ii) Ordinary Cement Concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS Codes. River Bazree

12.08

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (B)Tower Type DD+9: (iii) Cement Concrete with graded stone ballast (40 mm size excluding shuttering) in ground floor with N.B. variety stone metal-1:3:6 proportion.

1.62

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (B)Tower Type DD+9: (iv) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc., initial straightening and removal of rust (if necessar), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 guage black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4m -Tor Steel/Mild Steel-SAIL/TATA/RINL

1.09

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (B)Tower Type DD+9: (v) Hire and labour charges for shutering with centering and necessary staging upto 4 m using approved stout props and thick hardwood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)

48.28

-

-

... More
Design & Construction of Tower Foundation for following towers including excavation, stub setting and placement. Concreting and supply and placement of Reinforcement as per PTS: (B)Tower Type DD+9: (vi)Earthwork in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm, including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) -with earth obtained from excavation of foundation.

71.67

-

-

... More
Protection of Tower Footing (Supply & Installation): (i) Rubble masonary in cement (1:6) with hard dressed stone from approved querries and clean, coarse and washed sand including carriage of all materials to site (a) In Road and Jhora work.

2500

-

-

... More
Protection of Tower Footing (Supply & Installation): (ii) Concrete nominal mix 1:2:4 for top seal cover

15

-

-

... More
Protection of Tower Footing (Supply & Installation): (iii) Earthwork in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm, including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) -with earth obtained by fresh excavation (including cost of excavation upto 1800 mm depth) from land arranged by Deptt. within a lead of 100m.

1000

-

-

... More
Freight & Insurance Charges: F&I Charges on Schedule of Quantities & Prices (Supply)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.