NHPC Limited Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
NHPC Limited - NHPC Tender
Civil And Construction
Eprocure
Opening Date13 Oct 2020
Closing Date27 Oct 2020
Tender AmountRefer Documents
Costs
EMD
₹ 4,53,000Document Cost
₹ 1,680Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_NHPC_590282_1Bid Award Id
ViewTender No
NH/TLD-IV PS/PNC/W-753/2020/2829Tender Authority
NHPC Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Protection works around Cellular wall at TLD-IV Power Station Kalijhora
BOQ Items
... More
Handling, transporting and placing the newly casted Cubes and Tetrapods in layers near Cellular wall between B4 to B7 and other places as per direction of the Engineer-In- charge including cost of handling operations, labour, materials, tackles, cranes, plants & equipments etc. complete within a lead of 100 metre and all lifts.
1977
-
-
... More
Shuttering made up of steel material for casting of Tetrapod including providing sand heap at base as per drawing and technical specification
173
-
-
... More
Providing and construction of a gabion structure for training the TRC discharge with segments of wire crates of size 7 m x 3 m x
0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x
100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire (rate is inclusive of cost and carriage of all labour and materials).
990
-
-
... More
Supply of boulder above 225 mm
356.24
-
-
... More
Carriage charges of boulder 225mm
356.24
-
-
... More
Loading, unloading and stacking by Manual Means.A. Loading in to trucks at the lifting point, unloading at destin ation, stacking properly in go downs or yard etc. as directed including carriage by head load up to a lead of 50.00 m at each of the twopoints. (d) Stone Aggregate above 40 mm nominal size and above
356.24
-
-
... More
Supply of Steel ropes and tying the cubes/ tetrapods - Ungalvanized Steel Core(Dia- 16mm, Size-6x19 mm) Steel Wire Rope, Tensile Strength : 1960 N/mm², Manpower for tying the cubes / tetrapods shall be additional.
1000
-
-
... More
Labour charges for tying the cubes / tetrapods with one to another with steel ropes as per direction of EIC
447
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
River Bazree
30
-
-
... More
Providing and utilization of excavator 0.9 to
1.05 Cum capacity with crew members excluding fuel charges.
Single shift
60
-
-
... More
Fuel charges of excavator 0.9 to 1.05 Cum
capacity @ 15.29 liter per hour, Average 5 hours per day
4587
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements