New Town Kolkata Development Authority Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
New Town Kolkata Development Authority - NKDA Tender
Civil And Construction
Real Estate Service
Eprocure
Opening Date17 Oct 2023
Closing Date18 Nov 2023
Tender Amount₹ 39,64,184
Costs
EMD
₹ 79,284Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_NKDA_595523_1Bid Award Id
ViewTender No
48/EE-I/NKDA/2023-24Tender Authority
New Town Kolkata Development Authority ViewPurchaser Address
-Website
http://https://wbtenders.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
122.85
-
-
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
-
-
-
(a) With earth obtained from excavation of foundation.
10
-
-
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches
612
-
-
Hire and labour charges for shuttering with centering and necessary staging upto 4m using approved stout ,props and thick hard wood planks of approved thickness with required bracing for concrete slab, beam, columns,lintels,curved or straight including fitting , fixing and striking out after completion works (upto roof of ground floor).
-
-
-
a) 25mm to 30mm wooden shuttering in foundation without staging as per decision & direction of the Engineer-in-Charge.
108
-
-
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor
as per relevant IS codes. (a) Pakur Variety
87.6
-
-
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. For works in foundation and upto roof of ground floor/upto 4 m.
(i) Tor steel/Mild Steel.
I. SAIL/ TATA/RINL
0.5
-
-
M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to
IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc
Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.
For structural members of specified sections weighing less than 22.5 Kg./m
3.38
-
-
M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, allconsumables such as electrodes, gas and hire charges of all toolsand plants and labour reqired for execution and all incidentalchages (such as electricity, labour insurance) etc. complete.
Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a hight of erection
8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or partthereof.
i)For roof truss works
7.34
-
-
Removal of Rubbish, earth, etc from the working site and disposed of the same beyond compund in confirmity of municipal/ corporation Rules of such diaposal loasding into Truck and cleaning the site in all respect asper directio of the Engineer-in-Charge.
6.25
-
-
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
75.94
-
-
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
650
-
-
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :
(a) On steel or other metal surface :
(i) Two coats (white in shade)
650
-
-
Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colourcoated on both side) steel sheet work having minimum yieldstrength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mmdia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work). (i) In Roof:- a) With 0.5 mm thick sheet
1428
-
-
Aluminium sheet ridging fitted with self tapping screws, EPDM washers etc complete.(Minimum 225mm end lapping).
(A) 300 mm lapping each way a) With 0.71 mm sheet
85.59
-
-
Galvanised iron sheet eaves gutter fitted and fixed with necessary 50 mm X 6 mm M.S flat bar clamps bent to design, bolts, nuts, washers etc. complete. Eaves gutter made of 0.63 mm. sheets.(300mm End lapping)
(a) 225 mm. wide gutter
285.3
-
-
Supply of Chlorinated Polyvinyl Chloride (CPVC) pipes & fittings conforming to IS-15778: 2007 (A)(I) CPVC Pipes Class-1,SDR-11 50 mm
25
-
-
Labour for fitting and fixing high density poly-ethylene pipes or P.V.C.pipes for above ground work including cost of jointing materials paints etc. fitting and fixing all necessary specials, cutting pipes, making threads, cutting holes in walls or R.C. floor where necessary and mending good all damages excluding the cost of masonry or concrete work, if necessary, but including the cost and fitting and fixing holder bat clamps(any floor) or for underground work including cutting trenches upto 1.5 metre and
refilling the same complete as per direction of the Engineer-in-charge. (Payment will be made on centre line measurement of the total pipeline
including specials. )
50 mm
46.55
-
-
Supplying, fitting and fixing bib cock or stop cock. (f) (i) Polythene Bib Cock / Stop Cock (HD) with metal inlet (EMCO /
ATLAS or equivalent)
15 mm each
125
-
-
Supplying, fitting, fixing approved quality asbestos cement quality down pipe in positin with necessary clamps, nails including making holes in wall, floor etc. and cutting trenches in any soil or through masonry, concrete structures etc. if necessary and mending good damages including jointing materials complete.
(ii) 101.6 mm Dia.
17
-
-
Electrical work as per direction of EIC
1
-
-