New Town Kolkata Development Authority Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

New Town Kolkata Development Authority - NKDA Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date22 Jul 2024
Closing Date13 Aug 2024
Tender Amount₹ 3,46,08,960 
Notes
Download

Costs

Summary

Construction Of Cement Concrete Box Drai

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation

3020

279084

-

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (c) (i) With carried earth arranged by the contractor within a radius of 1 km. including cost of carried earth.

800

468892

-

... More
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note : Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835.(The payment is to be made on the basis of the finished compacted volume.)

17.28

33540

-

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. (In two layers)

4238

1808185

-

... More
Supplying, spreading and consolidating Stone Dust to a depth of 100 mm and above at desired density and C.B.R. as per Specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification. Note: Add cost at site of the materials to arrive at the complete rate. The compaction factor is 0.70. (The payment is to be made on the basis of the finished compacted volume of stone dust)

582

1630356

-

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. Pakur variety.

345

2168752

-

... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner-in-charge). (a) Depth upto 1.5 m.

600

276018

-

... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner-in-charge). (b) For additional depth beyond 1.5 m. and upto 3.00 m.

600

313920

-

... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner-in-charge). (c) For additional depth beyond 3.00 m.

400

237404

-

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.

5227

2086879

-

... More
Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 320 Kg of cement with super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture] (M 30 Grade). (i) Pakur Variety.

1641

9970371

-

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m. I) SAIL/ TATA/RINL.

161

11624077

-

... More
Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor.

168

1160888

-

... More
Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame. As per I.S-12592 (M.D). (i) 35 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size: Cover: 700 mm X 100 mm Frame: 910 mm X 185 mm opening: 560mm Weight: 245 kg (approx)

60

288463

-

... More
Bailing or pumping out water from foundation trenches.

2100

52257

-

... More
Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge.

3200

87712

-

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] iii) With 1:3 cement mortar. (a) 20 mm thick plaster.

1766

433570

-

... More
Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length).

1100

38016

-

... More
Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary.

300

3930

-

... More
Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.

140

3669

-

... More
Fitting, fixing bitumen drum sheet to bullah piling and wailing pieces including cutting straightening drum sheet fixing with country nails @20cm c/c at top & bottom and bolts& nuts at top & bottom at every joint of drum sheet with a laping of 15 cm, including supply of drum sheet,fixture all complete as per direction of the Engineer - in - charge.

80

41664

-

... More
Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg).

1200

8580

-

... More
Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,(tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.

1200

10008

-

... More
Extra rate for item no above for each additional lead of 60 metre or part thereof beyond the initial lead of 30 metre. 30 Mtr to 90 Mtr

300

3573

-

... More
90 Mtr to 150 Mtr

400

6192

-

... More
150 Mtr to 210 Mtr

500

9525

-

... More
Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts.

1200

4284

-

... More
Taking out old bamboo pins from piling and stacking the same within 150 metre from the site of work. (a) Where boats are not necessary.

300

2859

-

... More
Taking out bamboo wailing pieces after removing iron nails and stacking the same within 150 metre from the site of work. a) Where boats are not necessary.

150

327

-

... More
Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag. & then disposing off the same at a distance not less than 150 metre from the channel site.

1200

8580

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.