Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

New Town Kolkata Development Authority - NKDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date25 Jul 2024
Closing Date9 Aug 2024
Tender Amount₹ 31,41,745 
Notes
Download

Costs

Summary

Memo. No. 3039/nkda/ Engg-36/2010(xv)- Construction Of Smart Construction Of Barrier Free Footpath, Street No. 43 In Action Area - Ia, Under Nkda, New Town, Kolkata

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand

340

-

430.24

... More
Filling foundation or plinth by fine sands in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of fine sand ( payment to be made on the basis of mesurement of finished quantity of work ) (B) Do-by fine sand.

102

-

1579.34

... More
Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture] M 25 Grade (i) Pakur Variety 850x1.325x0.15=168.94cum

168.94

-

6072.22

... More
125 mm thick brick work with 1st class bricks in cement mortar (1:4) in ground floor

255

-

877.16

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor(f) 25 mm to 30 mm shuttering without staging in foundation

146.94

-

249.09

... More
providing and fixing at or near ground lavel precast cement concrete in kerbs (size: 450 mm x 350mm x width 150 mm at bottom with bevelled nosing at top) of cement concrete m20 grade without reinforcement, fixing as per approved pattern and setting in position at site after preparing the jhama khoa (1: 4: 8) as per specification and direction of Enggineer-in-charge inclouding filling of joints with 10 mm thick cement morter (3:1) and back filling the vertical piece properly whit earth duly compacted and curing the morter joints for atleast 3 days including cost and carriage of all materials complete.

850

-

757.98

... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes.Pakur Variety

53.65

-

6494.11

... More
Supplying, fitting and fixing in position C.I. manhole/ pit cover with rim.(c) Rectangular (i) 600 mm X 450 mm X 25 kg (approx.)

66

-

2418.16

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.I. SAIL/ TATA/RINL

0.15

-

72199.24

... More
Supply of UPVC Pipes (B tupe) & fittings conforming to IS 13592-1992 Single socket 3.00mtr. Length (b) 160mm.

324

-

650.72

... More
(b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering

447.3

-

89.38

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessar(a) on plastered surface (iv)Two coats with any shade except white

447.3

-

89.38



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.