Municipal Corporation Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Municipal Corporation - MAD Tender

Works
Civil And Construction
Pipe Line Project
Water Storage And Supply
Eprocure
Opening Date30 Oct 2024
Closing Date16 Nov 2024
Tender Amount₹ 13,73,824 
Notes
Download

Costs

Summary

Improvement Of Water Supply By Laying New Pipeline, Replacing Of Old Existing Pipeline Providing Valves When And Where Required And Repairing Of Distribution Pipeline Irrespective Of Dia Of Pipe

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation in trenches .................of the E.I.C UD & MAD (Schedule) 2018, P-1, it - 1(a) +1 (b)a)       Upto 1.5 M below G.L

450

119

53671.5

... More
Hire and labour charges 75 mm dia bamboo railing …………timber. Railing with 3 rows. UD & MAD (Schedule) 2018, P-3, it - 1.8(a)(ii)

350

49

17150

... More
Hire and labour charges for shoring work …………….of the E.I.C UD & MAD (Schedule) 2018, P-2, It- 1.6(a)+1.6(b) (a)     Depth up to 1.5M

40

386

15440

... More
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm............. complete. UD & MAD (Schedule) 2018, P-2, it - 1.3(a)

20

936

18724.2

... More
Lowering and type D.I pipes………….of the E.I.C. UD & MAD (Schedule) 2018, P-6, IT-2.2.b,c&d (a)     100 mm dia.

40

14

560

... More
Lowering and type D.I pipes………….of the E.I.C. UD & MAD (Schedule) 2018, P-6, IT-2.2.b,c&d (b)     150 mm dia.

30

18

563.4

... More
Lowering and type D.I pipes………….of the E.I.C. UD & MAD (Schedule) 2018, P-6, IT-2.2.b,c&d (c)     200 mm dia.

5.5

22

126.12

... More
Lead jointing to C.I pipes……….of the E.I.C UD & MAD (Schedule) 2018, P-7, IT-2.1.3 (a)     100 mm dia.

4

822

3288

... More
Lead jointing to C.I pipes……….of the E.I.C UD & MAD (Schedule) 2018, P-7, IT-2.1.3 (b)     150 mm dia.

10

1241

12410

... More
Lead jointing to C.I pipes……….of the E.I.C UD & MAD (Schedule) 2018, P-7, IT-2.1.3 (c)     200 mm dia.

4

1759

7036

... More
Lead jointing to C.I pipes……….of the E.I.C UD & MAD (Schedule) 2018, P-7, IT-2.1.3 (c)     400 mm dia.

2

2511

5022

... More
Supply of lead 99.999% purity KMDA(WS)2012’, P-112, IT-10.22 vi

0.35

140000

49000

... More
Lead jointing to C.I pipes and specials excluding cost of lead and spun yarn all complete to make the joint watertight at required hydraulic pressure as per specification and direction of the Engineer-in-charge, [Lead shall be supplied departmentally to the Agency at free of cost as per availability] UD & MAD (Schedule) 2018, P-7, IT-2.1.3 (a)     100 mm dia.

80

304

24320

... More
Lead jointing to C.I pipes and specials excluding cost of lead and spun yarn all complete to make the joint watertight at required hydraulic pressure as per specification and direction of the Engineer-in-charge, [Lead shall be supplied departmentally to the Agency at free of cost as per availability] UD & MAD (Schedule) 2018, P-7, IT-2.1.3 (b)     150 mm dia.

120

440

52800

... More
Lead jointing to C.I pipes and specials excluding cost of lead and spun yarn all complete to make the joint watertight at required hydraulic pressure as per specification and direction of the Engineer-in-charge, [Lead shall be supplied departmentally to the Agency at free of cost as per availability] UD & MAD (Schedule) 2018, P-7, IT-2.1.3 (c)     200 mm dia.

30

581

17430

... More
Lead jointing to C.I pipes and specials excluding cost of lead and spun yarn all complete to make the joint watertight at required hydraulic pressure as per specification and direction of the Engineer-in-charge, [Lead shall be supplied departmentally to the Agency at free of cost as per availability] UD & MAD (Schedule) 2018, P-7, IT-2.1.3 (c)     300 mm dia.

4

815

3260

... More
Flange joint to C.l./D.l/MS. pipes and specials including supply of rubber gasket. nuts. bolts. washers etc. of best quality to make the joint watertight at required hydraulic pressure all complete as per specification & direction of the Engineer-in-Charge. UD & MAD (Schedule) 2018, P-9, IT-2.1.6 (a)     100 mm dia.

2

461

922

... More
Flange joint to C.l./D.l/MS. pipes and specials including supply of rubber gasket. nuts. bolts. washers etc. of best quality to make the joint watertight at required hydraulic pressure all complete as per specification & direction of the Engineer-in-Charge. UD & MAD (Schedule) 2018, P-9, IT-2.1.6 (b)     150 mm dia.

2

723

1446

... More
Cutting C.I/D.I pipes for fittings with pipes……….of the E.I.C. UD & MAD (Schedule) 2018, P-10, IT-2.1.7 (a)     100 mm dia.

50

91

4550

... More
Cutting C.I/D.I pipes for fittings with pipes……….of the E.I.C. UD & MAD (Schedule) 2018, P-10, IT-2.1.7 (b)     150 mm dia.

60

126

7560

... More
Cutting C.I/D.I pipes for fittings with pipes……….of the E.I.C. UD & MAD (Schedule) 2018, P-10, IT-2.1.7 (c)     200 mm dia.

15

180

2700

... More
Cutting C.I/D.I pipes for fittings with pipes……….of the E.I.C. UD & MAD (Schedule) 2018, P-10, IT-2.1.7 (c)     300 mm dia.

8

211

1688

... More
Lowering fitting and fixing all types of valves………of the E.I.C. UD & MAD (Schedule) 2018, P-18, IT-2.4.1 (a)     100 mm dia.

1

986

986

... More
Lowering fitting and fixing all types of valves………of the E.I.C. UD & MAD (Schedule) 2018, P-18, IT-2.4.1 (b)     150 mm dia.

1

1510

1510

... More
C.I. Sluice Valve cast iron double flanged …………..I.S 1538:1993 UD & MAD (Schedule) 2018, P-47&48 , IT-8.6 & 8.7 (a) 100 mm dia.

1

5067

5067

... More
C.I. Sluice Valve cast iron double flanged …………..I.S 1538:1993 UD & MAD (Schedule) 2018, P-47&48 , IT-8.6 & 8.7 (b) 150 mm dia.

1

7487

7487

... More
Dismantling all types of masonry …………………as directed. PWD(B),2017, P-10 It-2(a).

0.1

447

44.7

... More
Sluice valve chamber with C.I heavy cover …………up to 900 mm depth. PWD(S&P),w.e.f 1/11/2017 , P-8 ,It-10

2

10459

20918

... More
Dewatering by pumps .........of the E.I.C. UD & MAD (Schedule) 2018, P-27, it - 7.2

2500

33

82500

... More
Centrifugally cast (Spun) D.I pipe…………….coating class K7 KMDA(WS)2012’, P-94, 95 IT-10.4 A,c,d,e & B, a,b (a)     100 mm dia.

40

760

30400

... More
Centrifugally cast (Spun) D.I pipe…………….coating class K7 KMDA(WS)2012’, P-94, 95 IT-10.4 A,c,d,e & B, a,b (b)     150 mm dia.

30

1119

33570

... More
Centrifugally cast (Spun) D.I pipe…………….coating class K9 KMDA(WS)2012’, P-94, 95 IT-10.4 A,c,d,e & B, a,b a)       200 mm dia.

5.5

1644

9042

... More
Hire & labour charges for diesel generating set for lighting including fuel, 300M wire, 11 points with 200 Watt bulb with post for hanging .................. UD & MAD (Schedule) 2018, P-4, it - 1.13

10

1650

16500

... More
Drilled & taping C.I main up to 15mmPWD(S&P) w.e.f 1.11.17 P-27 It-18(i)

2

160

320

... More
FIELD WELDING

2

1631

3262

... More
Supplying, fitting & fixing G.I pipe of TATA make underground…………..in all respect. PWD(S&P) 2017, P-3 It-2(i),(ii) & (iii) (a)     15 mm dia(M.Q).

20

214

4280

... More
Supplying, fitting & fixing G.I pipe of TATA make above ground………….in all respects. PWD(S&P) 2017,P-2 It-1(A)(a) ((b) (c) (i) (ii) (iii) (a)     15 mm dia(M.Q).

3

192

576

... More
Hydraulically testing of C.I/D.I pipes………….of the E.I.C. UD & MAD (Schedule) 2018, P-24 , it -5.1 (a)     100 mm dia.

150

21

3267

... More
Hydraulically testing of C.I/D.I pipes………….of the E.I.C. UD & MAD (Schedule) 2018, P-24 , it -5.1 (b)     150 mm dia.

125

22

2762.5

... More
Disinfection of water main by filling with water ……………….of the E.I.C. UD & MAD (Schedule) 2018, P-26, it - 6.1 (a)     100 mm dia.

150

8

1233

... More
Disinfection of water main by filling with water ……………….of the E.I.C. UD & MAD (Schedule) 2018, P-26, it - 6.1 (b)     150 mm dia.

125

8

1052.5

... More
Labour for cleaning and watering C.I pipes upto 150 mm dia.................... UD & MAD (Schedule) 2018, P-27, it - 7.3

300

7

2100

... More
Detachable joints to A.C pipes……………of the E.I.C. UD & MAD (Schedule) 2018, P-12, it - 2.2.3 (a)     100 mm dia.

4

328

1312

... More
Detachable joints to A.C pipes……………of the E.I.C. UD & MAD (Schedule) 2018, P-12, it - 2.2.3 (b)     150 mm dia.

4

498

1992

... More
Labour for detachable joints to A.C pipes………of the E.I.C. UD & MAD (Schedule) 2018, P-12, it - 2.2.4 (a)     100 mm dia.

4

51

204

... More
Labour for detachable joints to A.C pipes………of the E.I.C. UD & MAD (Schedule) 2018, P-12, it - 2.2.4 (b)     150 mm dia.

4

68

272

... More
Supplying including cost of installation of C.I Mechanical compression ………………C.I/D.I pipes. UD & MAD (Schedule) 2018, P-30, it - 7.16 (a)     100 mm dia.

4

1650

6600

... More
Supplying including cost of installation of C.I Mechanical compression ………………C.I/D.I pipes. UD & MAD (Schedule) 2018, P-30, it - 7.16 (b)     150 mm dia.

4

2649

10596

... More
Supplying including cost of installation of C.I Mechanical compression ………………C.I/D.I pipes. UD & MAD (Schedule) 2018, P-30, it - 7.16 (c)      200 mm dia.

2

3425

6850

... More
(a)     Socket and Spigot ended. UD & MAD (Schedule) 2018, P-45, it - 8.1(a+b) 92     80 mm to 300 mm

320

61

19520

... More
All types of D.I specials ……………Bituminous coating. UD & MAD (Schedule) 2018, P-46, it - 8.3(a)(d)     Flange tee(80 mm to 300 mm)

200

357

71400

... More
Earth Work in filling in foundation trenches…………from excavation UD & MAD (Schedule) 2018, P-19, it - 1.2(a)

430

77

33342.2

... More
Removal of rubbish/Earth……….of the E.I.C. UD & MAD (Schedule) 2018, P-5, it - 1.18

50

166

8300

... More
Supply H.D.P.E pipe confirming to I.S-4984/1985.P.E-100 Rate accepted by H.M.C (a)     160 mm dia.

125

992

124076.25

... More
Supply H.D.P.E pipe confirming to I.S-4984/1985.P.E-100 Rate accepted by H.M.C (b)     110 mm dia.

150

471

70791

... More
Lowering and jointing labour charges for laying and jointing of 4984.P.E-100 Rate accepted by H.M.C (a)160 mm dia.

125

96

12000

... More
Lowering and jointing labour charges for laying and jointing of 4984.P.E-100 Rate accepted by H.M.C (b)110 mm dia.

150

64

9600

... More
Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (b)     160 mm dia pipe end

6

803

4820.76

... More
Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (d)     160 mm dia sand with flange

6

571

3427.08

... More
Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (e)     160 mm dia end cap

1

384

384

... More
Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (i)                  110 mm dia bend

1

514

514.07

... More
Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (ii)                110 mm dia pipe end

6

467

2805.96

... More
Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (iv)               110 mm dia sand with flange.

6

381

2291.88

... More
Supply H.D.P.E pipe fittings………….P.E-100 Rate accepted by H.M.C (v)                 110 mm dia end cap

2

280

560.22

... More
Hire charge movable type mounted …………..

2

8951

17902

... More
Supply fitting & fixing………………water tap for public use…………….make. PWD(S&P),2017, P-10.It-16(i,ii) i)15 mm dia.

4

298

1192

... More
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips(20 mm nominal size) excluding shuttering and reinforcement PWD (bldg) w.e.f - 1.11.2017, P- 24, Item - 4.a 1) Pakur variety.

15

5563

83445

... More
Shifting house connection or stand post connection from existing main to new main after excavation through any kind of soil and road materials up to required depth. dismantling existing ferrule with all fittings. plugging hole of old main with G.I. plug. drilling and tapping the new main. refixing the ferrule on the new main with serviceable old G.I pipes and other specials (New G.l. pipes and other specials. if required to be installed shall be paid extra) and back filling the trench with excavated materials all complete as per specification and direction of the Engineer- in-Charge. UD & MAD (Schedule) 2018, P-21, it - 3.7

50

1427

71350

... More
Repair of Air valve by supplying ebonite and- rubber ball. gasket. nuts and bolts with washers and la bour all complete UD & MAD (Schedule) 2018, P-28, it - 7.9 100 mm dia

4

3012

12048

... More
Repair of Air valve by supplying ebonite and- rubber ball. gasket. nuts and bolts with washers and la bour all complete UD & MAD (Schedule) 2018, P-28, it - 7.9 150 mm dia

4

3897

15588

... More
Add GST

1

207491

207491.46

... More
Add 1 % Cess

1

13602

13602.22



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.