Municipal Corporation Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Corporation - MAD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date15 Sep 2023
Closing Date4 Oct 2023
Tender Amount₹ 20,12,598
Costs
EMD
₹ 40,252Document Cost
₹ 5,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MAD_570377_12Bid Award Id
ViewTender No
WB-HMC/NIT/ED/12/EE-II/23-24Tender Authority
Municipal Corporation ViewPurchaser Address
-Website
http://https://www.hmcgov.in/hmcweb/index.php
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). [PWD (Rds) Page 249, Item -4.12]
43.6
111649
2560.76
... More
Supplying ready mixed concrete of M 20 Grade with well graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved super plastisizer, designing concrete mix following I.S. 10262 and I.S. 456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work, compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [Cement to be supplied by the Manufacturer or supplier (i) Without approved concrete Pump [Ref : P.W.D.(Bldg.), Page-32, Item No. 17(i)]
81.9
542301
6621.51
... More
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth [Ref: P.W.D (Bldg) 2017, Page - 15, Item.- 7]
6.1
33916
5560
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (b) 15 mm thick plaster [Ref : P.W.D.(Bldg) 2017, Page-189 , Item No. 1.ii]
39.6
6336
160
... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.[Ref : P.W.D.(Bldg) 2017, Page- 192, Item No. 15]
39.6
1346
34
... More
Supplying & laying as per IRC-SP:063-2004 paver unit of any shade of approved quality as per relevant IS code, laid in pattern as directed in pavement, footpath, driveway (paver block only), etc including necessary underlay complete in all respect with all labour and material. [Border concrete if necessary to be paid separately]. Note: Sub-grade CBR should not be less than 5.(c) 60 mm thick interlocking designer concrete paver block M-35 grade for light-traffic zone,commercial & office complex,tourist resort as per IS: 15658-2006 (over 20-40 mm medium sand bed on 250mm thk WBM/ WMM base course & 250 mm thk bound gnaular /granular sub-base course including cost of sand for sand bed but excluding cost of base ,sub-base course & subgrade preparation.) [P.W.D(Bldg) 01.01.2017, P-75, It-48,C,1]
435.5
610135
1401
... More
Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect.[Ref: P.W.D (Bldg) 2017, Page-43, Item No- 38]
30
11040
368
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II. Other than SAIL/ TATA/RINL [Ref : P.W.D (Bldg) 2017, Page-43, 44 Item No. 40.a.(i).II]
0.3
21380
71269
... More
Add G.S.T @ 18%
1
303966
303966.83
... More
Welfare Cess
1
19926
19926.71
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements