Municipal Affairs Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date22 Apr 2025
Closing Date13 May 2025
Tender Amount₹ 38,02,902
Costs
EMD
₹ 76,058Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Improvement Of Bituminous Road Bandhan Marriage Hall To Shyambandh Water Tanky ,mother Teresa Road , Shyambandh, Borough-vii,under Amc
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_837555_1Tender No
ET-06 /WS/Eng/2025Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Prime Coat
Providing and applying primer coat with Cationic
Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For WBM / WMM Surface:
(with primer @ 0.70-1.0 kg/sqm)
1062.5
29
31683.75
... More
GST 18 % =Rs.
1
574360
574360.03
... More
Providing and laying Premixed Seal Coat (Type B)
with approved quality sand/grit @ 0.6 m3/ 100 m2
and bitumen binder on thoroughly cleaned black
top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and
aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of
fuel and lubricants, including hire charges of
machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H
(5th Revision).
II By Manual Means
With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)
3641.5
36
134662.67
... More
(ii)on Bitminous surface(using cataionic bitumen) per sqm
210.1
9
2023.29
... More
Labour Cess 1 % = Rs.
1
37652
37652.49
... More
Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver inSub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve thedesired density, including supply of all materials, machinery, fuel and lubricants, including incidentalcosts for lighting, guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H
(5th Revision).
Material to be used per Cum
Stone metal 26.5 mm-0.3960 cum
Stone metal13.2 mm-0.2640 cum
Stone metal 5.6 mm-0.3564 cum
Stone dust -0.3036 cum
106.25
1396
148367.5
... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand
22.2
640
14227.09
... More
Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade confirming to IS: 8887-1978 on the prepared surface cleaned Hydraulic broom, moistenning the surface including cost and carraige of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per clause 503 of specifications for Road & Bridge Works of MoRT & h (5th Revision). (i) on Granular surface (using Bitumen emulsion at the rate of 0.20 to 0.30 Kg per sqm.
3641.5
10
38090.09
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand
444
324
143856
... More
Repairing pot-holes and making up small
depressions using Cationic Bitumen Emulsion
conforming to IS 8887- 1978 with stone metals / chips premixed with emulsion in concrete mixer or any other method approved by the Engineer-in-Charge, including cutting the pot-hole area in regular shapes with vertical edges, thorough cleaning & moistening of surface, applying tack coat, filling up the potholes with pre-mixed metals/chips in layer/layers as per specification and direction of the Engineer-incharge, compacting by power roller, finishing the top of repaired surface levelled with adjoining area including cost and carriage of stone aggregates, blinding material & bitumen emulsion, hire & running charges of rollers and other tools & plants, cost of fuel & lubricants and other incidental charges excluding cost of applying tack coat. [Using stone chips of size 22.4 mm and 11.2 mm in 60: 40 proportion, premixing with bitumen emulsion @ 70.7 kg per m3 of loose net volume of stone chips.]
15.76
4144
65304.62
... More
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary
(a) Depth up to 150 mm.
1474
14
21225.6
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
144.55
166
23995.3
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, In ground floor as per relevant IS codes. (i) Pakur Variety
181.59
5215
947073.57
... More
Supplying, spreading and consolidating Stone Dust to a depth of 100 mm and above at desired density and C.B.R. as per Specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3
days, mending cracks and depressions by rolling
where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification
83.44
768
64129.48
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements