Municipal Affairs Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date21 Nov 2024
Closing Date29 Nov 2024
Tender Amount₹ 2,89,755
Costs
EMD
₹ 5,795Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAD_771362_1Bid Award Id
ViewTender No
WBMAD/ULB/RSM/446/24-25Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
brick work with 1st class brick in cement morter(1:6) (a) in foundation and plinth.
17.25
5367
92594.72
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface] (i) With 1:6 cement mortar (c) 15 mm thick plaster
4.25
148
631.25
... More
Neat cement punning about 1.5 mm. thick in wall dado,window, sills, floor drains etc.
4.25
32
139.19
... More
(a) filling in foundation and plinth by silver sand in layers not exceeding 150mm as directed and consolidating the same by through saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finish quantity).
7.43
936
6951.36
... More
reinforcement for reinforced concrete work in all sorts of structures including distribution bars,strirups,binders etc initial straightening and removal of loose rust,cutting to recusite length,hooking and bending to correct shape,placeing in proper position and binding with 16 gauge black annealed wire at every intersection,complete as per drawing and direction. (a) for work in foundation and upto roof of ground floor upto 4m. (1) tor steel/mild steel SAIL/TATA/RINL
0.29
55194
15896.02
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm thick wooden shuttering without staging in found
27.5
209
5747.5
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes ) (a) Pakur & Chandil variety.
13.2
5863
77393.32
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation
1.95
77
151.2
... More
GST @ 18%
243123.75
-
43762.28
... More
Labour Welfare Cess @ 1%
286886.03
-
2868.86
... More
Total in Figures (including all taxes)
-
-
289754.89