Municipal Affairs Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date15 Feb 2025
Closing Date3 Mar 2025
Tender Amount₹ 60,23,640
Costs
EMD
₹ 1,20,473Document Cost
₹ 3,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_816068_3Tender No
eNIT No 16/ 2024-25/PW-10 / ALIPURDUAR Date 15.02.2025Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cleaning and removing conservancy garbage mixed with rubbish & other filthy materials from the road side flank,drain and compound including cutting, loading, unloading to and from truck or cart by Mathor labour & removing the same to any distance.
22.5
56
1273.95
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm.
532.44
119
63504.12
... More
(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring.
239.6
192
46094.25
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation.
33.04
77
2561.92
... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
26.62
521
13870.88
... More
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete and including cost of sand and gunny bags.
262
3
917
... More
Close Bamboo Walling made of 65mm to 75mm dia. bamboos (in single line) driven about half-length into the ground side by side, with stout stays at an interval of 1m, 3nos. of half split bamboo runner of same dia fitted and fixed with nails etc. complete as per direction. (Measurement to be taken along the length of piling after finishing the works).
(iii) With bamboos of length above 2.50m and
upto 3.00m
234
587
137358
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand..
648.51
324
210117.24
... More
(II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety
In ground floor
(a) 1:3:6 proportion
325.7
3261
1062123.99
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor.
73.75
666
49137.41
... More
Supplying, fitting galvanised 2 ply 12 gauge / 2 points line of barbed wire in fencing (holes already made in the body of the post)
or fixed by staples tightening and fixing the wires in taut condition with straining bolts including the cost of cutting and of lapping
joints in the wire as necessary but excluding the cost of galvanised staples,straining bolt and binding wire as necessary 2 ply 12
gauge/ 2 points. %Mtr. 2483 2483 2483 2483 2483 2483 2483 2483 2483 2483 2483 2593 2483 2483 2483 (Payment to be mad
2016
24
50057.28
... More
Supplying galvanised straining bolts (with eye at one end with double nuts and washers) fitted and fixed complete
1344
50
67200
... More
Supplying galvanised staples fitted and fixed complete.
1344
2
2983.68
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) of Pakur variety excluding shuttering and reinforcement if any, as per relevant IS codes.- In Ground Floor (1) Pakur Veriety
211.14
5842
1233623.46
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor / upto 4m (i) Tor steel/Mild Steel (In Gr.floor) II. JSW/JSPL/SHYAM/ SRMB/BMASL/ELECROSTEEL/SSL
16.57
59241
981626.35
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
1230.12
363
446533.56
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(f) 25 mm to 30 mm shuttering without staging in foundation
22.13
205
4536.65
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). (ii) With 1:4 cement mortar
(a) 10 mm thick plaster
In Gr.Fl.
716.04
123
88402.3
... More
(b) 15 mm thick plaster
In Gr.Fl.
36.88
138
5106.4
... More
Labour for chipping of concrete surface before taking up plastering work.
716.04
21
15036.84
... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
716.04
32
23421.67
... More
Applying Exterior grade Acrylic primer of approved quality and brand
on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC.
In Ground Floor:(a) One Coat
36.88
31
1158.03
... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly
(plastered or concrete surface) as per manufacturer's specification
In Ground floor: (iii) Two coats
36.88
49
1807.12
... More
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
254.73
29
7387.17
... More
Supplying& laying 20 mm designer chequered tiles of any shade and of approved quality as per IS: 1237: 1980 laid in patterns as directed in pavement, footpath including necessary underlay 25 mm thick average cement mortar (1:3) complete in all respect with all labour and materials [using cement slurry @ 4.4 kg/Sq.m at back side of tiles. Cement of mortar & slurry will be supplied by the Department. Border concrete if necessary to be paid separately
531.87
811
431665.69
... More
Labour for fitting line of wire to posts, tightening by straining bolts and fixing the wire ( in taut condition) to the post with staples
(including the cost of cutting and lapping joints in the wire, as necessary and including the cost of staples and straining bolts and
also the labour for fixing the staples but excluding the cost of straining bolts)
2016
3
6209.28
... More
Supplying at site or stackyard or as directed PCC (1 : 2 :4) Fencing Post 215 cm 150 mm X 150 mm section at bottom, 100 mm
X 100 mm section at top with T-Base 300 mm X 150 mm X 100 mm, having 4 nos 6 mm dia vertical M.S. reinforcement and 6 mm dia binders @ 200 mm centres, finished smooth etc., complete.
112
454
50848
... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : b) On steel surface(super gloss) (iv) Two coats (with any shade except white)
254.73
79
20123.67
... More
G.S.T. @ 18%
5054237.34
-
909762.72
... More
Labour cess @ 1%
5964000.06
-
59640
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%