Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date16 Mar 2024
Closing Date27 Mar 2024
Tender Amount₹ 2,77,148
Costs
EMD
₹ 5,543Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAD_686243_1Bid Award Id
ViewTender No
WBMAD/ULB/RSM/569/23-24Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth
18.56
99626
5367.81
125mm thick Brick work with 1st class bricks in cement mortar (1:4) in ground floor
27.5
20032
728.47
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and
consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
6.75
6319
936.21
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm thick wooden shuttering without staging in found
1.63
340
209
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes ) (a) Pakur & Chandil variety.
0.6
3517
5863.13
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar
including rounding off or chamfering corners as directed and
raking out joints including throating, nosing and drip course,
scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface] (i) With 1:6 cement mortar (c) 15 mm thick plaster
103.25
15335
148.53
Neat cement punning about 1.5 mm. thick in wall dado,window, sills, floor drains etc.
103.25
3381
32.75
Reinforcement for reinforced…………direction. For works in foundation, basement…….. Page-43 Item 40 (i) Tor steel/Mild steel
0.09
4967
55194.51
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation
8.46
655
77.54
GST @ 18%
232545.55
41858
0.18
Labour Welfare Cess @ 1%
274403.75
2744
0.01
Total in Figures (including all taxes)
-
277147
-
Quoted Rate in Figures (including all taxes)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements