Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Civil Works Others
Agriculture or Forestry Works
Eprocure
Opening Date16 Nov 2024
Closing Date2 Dec 2024
Tender Amount₹ 23,28,373
Costs
EMD
₹ 46,567Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAD_769923_1Bid Award Id
ViewTender No
812/DDM/GEN/24-25Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://wbtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Protection Work with Eucalyptus of Patel Nagar Pond with Construction of one Ghat in Ward no 22 under 15th FC (tied)
BOQ Items
... More
(iii) Beyond 500 m & up to total lead of 1000 m
-
-
-
... More
Supplying Eucalyptus-bullah piles at work site, inclunding dressing and making one end pointed
-
-
-
... More
i) 150 mm diameter
4375
217
949375
... More
ii) 125 mm diameter
878
145
127310
... More
Labour for driving sal bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position protection the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
-
-
-
... More
i) 150 mm diameter
2800
105
294000
... More
ii) 125 mm diameter
264
92
24288
... More
Labour charge for fixing of sal bullah tie and runner including cost of nuts & bolts required complete as per direction of EIC.
350
20
7210
... More
Coal tarring on wooden surfaces including cost of materials single coat
-
-
-
... More
a) Double coat
2407.43
36
86667.43
... More
Drum Sheet Walling 1.40m (av.) high on Sal-bullah / Eucalyptus bullah piling 10 cm dia. and 3.25m long driven 1.75m (av.) below G.L. and 75cm centre to centre including fitting fixing 3 nos. of half bullah pieces (from 10 cm dia) and drum(empty bitumen) sheet (approved condition) of height 1.5m , cutting and straightening drum sheet (each joint must have lap length of min.50mm) including cost of necessary nails, bolts, nuts etc. and providing 2 to 3m long half bullah ties of 10cm dia. @ 2.25 m centre to centre fixed with 10 cm dia. bullah posts driven 1.5m below G.L. including cost of all materials and one coat of coal tarring to all bullah etc. complete as per direction
(i) Using Eucalyptus bullah
* Rate as per Annex. 1 (enclosed)
169
634
107201.77
... More
Supply empty cement bags in good condition
29.25+228.15=257.4
257.4/0.0347 =7417.9 say, 7417
7417
330
24476.1
... More
Filling empty cement bags with dry earth or sand stitching the bag (cost of thread included and carrying and placing them in position and all incidental charge complete but excluding cost of sand and gunnybags)
7417
350
25959.5
... More
GHAT
-
-
-
... More
(Based on PWD (WB)with effect from 01.11.17 & 3rd Corrigenda wef 04.06.18)
-
-
-
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
-
-
-
... More
(a) Depth of excavation not exceeding 1,500 mm.
-
-
-
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
-
-
-
... More
c) (ii) With carried earth arranged by the contractor
within a radius of 3 km. including cost of carried
earth.
228.15
35541
81086.79
... More
(I) Cement concrete with graded stone ballast (40 mm size excluding shuttering)
-
-
-
... More
In ground floor
-
-
-
... More
(A) [Pakur Variety]
-
-
-
... More
(a) 1:3:6 proportion
-
-
-
... More
(A) Filling in foundation or plinth by silver sand in
-
-
-
... More
layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made onmeasurement of finished quantity)
-
-
-
... More
Brick work with 1st class bricks in cement mortar (1:4)
-
-
-
... More
(a) In foundation and plinth
-
-
-
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary .[Excluding cost of chipping over concrete surface]
-
-
-
... More
A) In Ground floor
-
-
-
... More
(i) With 1:4 cement mortar
-
-
-
... More
(c) 20 mm thick plaster
-
-
-
... More
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.
-
-
-
... More
NOTE : Cement 0.152 cu.m. per 100 sq.m.
-
-
-
... More
Pumping out water from ponds or tanks
-
-
-
... More
Extra over the corresponding item of earth work for
removing semi liquid mud or slushy earth by iron
pans, buckets etc
-
-
-
... More
Sub Total without GST & Labour Cess
-
-
1953661.41
... More
Add 18 % GST
-
-
351659.05
... More
Sub Total
-
-
2305320.46
... More
Add 1 % Cess of Sub Total
-
-
23053.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements