Municipal Affairs Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Municipal Affairs Department - MAD Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date13 Mar 2024
Closing Date4 Apr 2024
Tender Amount₹ 21,77,022 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Page No - 1, Item No - 3 (a), V - I, PWD Building Work, Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work), (a) With earth obtained from excavation of foundation.

11.57

897

77.54

... More
Page No - 42, Item No - 36(f) Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) 25 mm to 30 mm shuttering without staging in foundation

128.55

26352

205

... More
Page No - 15, Item No - 7 (a) Brick work with 1st class bricks in cement mortar (1:4)

96.42

470789

4882.7

... More
Page -245, Item - 4.06, V - III, PWD Road and Bridge Work, Supplying, spreading and consolidating Stone Dust to a depth of 100 mm and above at desired density and C.B.R. as per Specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification. Add cost at site of the materials to arrive at the complete rate. The compaction factor is 0.70.

96.42

122335

1268.78

... More
Page No - 48, Item No - 6, V - I, PWD Building Work, Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement iii) 35 mm. thick

71.42

22365

313.15

... More
Page No - 189, Item No - 1© Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] 15 mm thk. Plaster (1:6)

492.8

68760

139.53

... More
Page No - 192, Item No - 15 Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc

492.8

16139

32.75

... More
Add applicable 9.00% CGST = Rs

1

159657

159657.77

... More
Add applicable 9.00% SGST = Rs

1

159657

159657.77

... More
Add 1.00% Labour welfare Cess = Rs

1

20932

20932.91

... More
Add 3.00% Contingency = Rs

1

62798

62798.72



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.