Municipal Affairs Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date13 Feb 2025
Closing Date1 Mar 2025
Tender Amount₹ 23,21,469
Costs
EMD
₹ 46,429Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
The Extension Of Ug Pipe Drain Dia 900mm(np3) And Restoration Of Road (length 75m) At Green Park Of Ward No.-27 Under Rajpur - Sonarpur Municipality.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_814152_1Bid Award Id
ViewTender No
WBMAD/ULB/RSM/543/24-25Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(c) Depth of excavation for additional depth beyond
3,000 mm. and upto 4,000 mm. but not requiring shoring.
PWD (Bld.), It-2.c, Pg-1
46.52
234
10918.71
... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc.) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).
(a) Depth upto 1.5 m.
PWD (Bld.), It-6.a, Pg-3
274.65
386
106014.9
... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc.) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).
(b) For additional depth beyond 1.5 m. and upto 3.00m
PWD (Bld.), It-6.b, Pg-3
274.28
439
120406.73
... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc.) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)
(c) For additional depth beyond 3.00 m.
PWD (Bld.), It-6.c, Pg-3
61.56
498
30654.39
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
PWD (Bld.), It-1, Pg-14
276.73
361
99899.89
... More
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.
(a) 1:3:6 proportion
PWD(Bld.), It-1.a, Pg-23 (rate recasted)
47.74
4628
220977.62
... More
Supplying and Laying of Reinforced Cement Concrete
Pipe NP3 as per design in Single Row Laying of R.C.C. pipe with spigot – socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches ............... the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge. (Payment to be made on the basis of actual finished length of the pipe line).
(F) 900 mm dia NP3 pipe
PWD (R&B), It-4.09, Pg-247, (rate recasted)
66
4547
300115.2
... More
Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth
PWD (Bld.), It-8.a, Pg-15, (rate recasted)
53.34
5367
286292.15
... More
Supplying & laying Double Wall Corrugated (with external annular
corrugation and smooth internal walls) High Density Polyethelene Pipes conforming to IS 16098 (Part-II):2013 having Stiffness Class of SN 8 with Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR value not more than 10% including necessary jointing materials for nonpressure underground Drainage, Sewerage & Cross drainage application.
(iv) 300mm internal dia.
PWD (S&P), It-36.iv, Pg-23
21.6
1349
29138.4
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm.including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation
PWD (Bld.), It-3, Pg-1
242.62
77
18812.75
... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of
finished quantity)
PWD (Bld.), It-4(A), Pg-2
45.71
936
42790.41
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(ii) With 1:4 cement mortar
(a) 20 mm thick plaster
PWD (Bld.), It-1.ii.a, Pg-189 (rate recasted)
139.32
189
26338.45
... More
Neat cement punning about 1.5mm thick in wall, dado,window
sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
PWD (Bld.), It-15, Pg-192 (rate recasted)
139.32
32
4562.73
... More
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.
In ground floor.
3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement) using grey cement
(ii) 25 mm. thick
PWD (Bld.), It-6.ii, Pg-48 (rate recasted)
17.82
265
4739.23
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns,lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(f) 25 mm to 30 mm shuttering without staging in foundation
PWD (Bld.), It.-36.f, Pg-42
37.3
209
7796.12
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
i) Pakur Variety
PWD (Bld.), It-10.i, Pg-26 (rate recasted)
7.14
5863
41856.89
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(i) Tor steel/Mild Steel
I. SAIL/ TATA/RINL
PWD (Bld.), It-40.a.i.I, Pg-43 (rate recasted)
0.81
55194
44652.36
... More
Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D)
(viii) 5 MT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size
Cover: 470 mm X 420 mm X 80 mm
Frame: 590 mm X 550 mm X 170 mm
opening: 380mm x 305mm
Weight: 100 kg (approx)
PWD (S&P), It-8.viii, Pg-92
12
2001
24012
... More
Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D)
i) 35 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size
Cover: 700 mm X 100 mm
Frame: 910 mm X 185 mm
opening: 560mm
Weight: 245 kg (approx)
PWD (S&P), It-8.i, Pg-91
6
4034
24204
... More
Construction of Sub Base using Local Materials:
Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40).
PWD (R&B), It-4.09.i, Pg-247 (rate recasted)
23.16
2130
49357.85
... More
Water Bound Macadam Sub Base:
By consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating Jhama metal (63 mm to 45 mm) with moorum screening :
PWD (R&B), It-4.10.i, Pg-247 (rate recasted)
14.13
2657
37557.12
... More
Tack Coat:
Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of specifications for Road & Bridge Works of MoRT&H (5th Revision).
(ii) On Granular surface treated with primer (Using Bitumen emulsion @ 0.25 to 0.30 kg per sqm)
PWD (R&B), It-5.02.ii, Pg-251 (rate recasted)
657.78
10
6702.73
... More
Water Bound Macadam Base Course:
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(iii) Grading-II Aggregate (53 mm to 22.4 mm) Using Stone Screening Type B (11.20 mm)
B. Manual Means
PWD (R&B), It-4.11.iii.B, Pg-248 (rate recasted)
34.81
2696
93844.89
... More
Prime coat:
Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For WBM / WMM Surface: (with primer @ 0.70-1.0 kg/sqm)
PWD (R&B), It-5.01(1), Pg-251 (rate recasted)
516.48
28
14962.48
... More
Bituminous Macadam using Mobile Hot Mix Plant
(Light Duty):
Providing and laying bituminous macadam with Mobile Hot Mix Plant (Light Duty) using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature by means of approved and suitable arrangements to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charges of Mmachinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Specifications for Road & Bridge Works of MoRT&H (5th Revision).
B. For Grading 2 (19 mm nominal size, 50-75 mm thick.)
PWD (R&B), It-5.04(B), Pg-252 (rate recasted)
21.79
6381
139047.38
... More
Open-Graded Premix Surfacing using Viscosity grade Paving Bitumen and HMP :
Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by tipper trucks or by any other suitable arrangements, laying the mixture uniformly over the surface with paver finisher, including manual operations as and when required for proper line, grade and level to serve as wearing course on a previously prepared base, including mixing in Hot Mix Plant and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperature and including the hire charges of Hot Mix Plant and other machinery, pay of operators, cost of fuel and lubricants etc. complete as per Clause 510 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
PWD (R&B), It-5.11, Pg-257 (rate recasted)
516.48
122
63176.08
... More
Seal Coat:
Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
II. By Manual Means
With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)
PWD (R&B), It-5.13.B.II, Pg-258 (rate recasted)
516.48
41
21666.42
... More
GST @ 18%
1947867.84
-
350616.21
... More
Labour Welfare Cess @ 1%
2298484.05
-
22984.84
... More
Total in Figures (including all taxes)
-
-
2321468.89
... More
Quoted Rate in Figures (including all taxes)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements