Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Eprocure
Opening Date28 Jul 2023
Closing Date18 Aug 2023
Tender AmountRefer Documents
Costs
EMD
₹ 9,667Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbmad/ulb/hm/2888/nit-1425 Dt-19.07.2023
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_MAD_551168_1Bid Award Id
ViewTender No
WBMAD/ULB/HM/2888/NIT-1425Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Item No. 4 / Page No. - 43/40 (ii) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
II. SHYAM / SRMB
0.9
49579
55087.97
Item No. 5 / Page No. - 42/36
Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fittings, fixing and striking out after completion of works. ( upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height. shall be taken as 4 m and extra for woks beyond the initial 4 m. ht. shall be allowed under 12(e) for every 4 m or part thereof. ) f) 25 mm to 30 mm shuttering without staging in foundation.
16
3280
205
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
62
22258
359
Item No. 6 / Page No. - 104/13 a (ii ) (3rd Corrigenda,dt - 04.06.2018)
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs.
(Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25%
for each addl. floor above 4th floor)
(ii) Grill weighing above 16 Kg./sq.mtr and above
1.2
11635
9696
Item No. 7 / Page No. 99/1 (i) M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with
bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to
IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section,
consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. I) For structural members of specified sections weighing less than 22.5 Kg./m
3.3
239589
72603
Item No. 8 / Page No. - 200/1 (a) (a) Priming one coat on steel or other metal surface with synthetic oil
bound primer of approved quality including smoothening surfaces by sand
papering etc.
56
1624
29
Item No. 9 / Page No. - 189/1
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(ii) With 1:4 cement mortar
(b) 15 mm thick plaster
45
6885
153
Item No. 10 / Page No. - 192/15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
44
1496
34
Item No. 11 / Page No. - 197/17 (c) Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The
rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.
In Ground floor (Two Coat)
c) Super Protective 100% Acrylic Emulsion.
45
4365
97
Item No. 12 / Page No. - 200/2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary (b) On steel or other metal surface :
With super gloss (hi-gloss) -
(iv) Two coats (with any shade except white)
56
4424
79
GST Item (Effect from 01.11.2017)
18 % GST on Estimated Cost of Sl No- 1 to 12
1
73003
73003.03
Labour Welfare Cess Item (Effect from 01.11.2017) 1% Labour Welfare Cess on Estmated Cost of Sl No -1 to 13
1
4785
4785.75
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements