Municipal Affairs Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Municipal Affairs Department - MAD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date6 Feb 2023
Closing Date22 Feb 2023
Tender Amount₹ 11,64,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(ii) With 1:6 cement mortar 20 mm thick plaster

246.17

-

156

... More
Neat cement punning about 1.5mm thick Wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

55.36

-

32.85

... More
Reinforcementforreinforcedconcreteworkinallsortsofstructuresincludingdistributionbars,stirrups,bindersetcinitialstraighteningandremovaloflooserust(ifnecessary),cuttingtorequisitelength,hookingandbendingtocorrectshape,placinginproperpositionandbindingwith16gaugeblackannealedwireateveryintersection,completeasperdrawingand directio

3.04

-

53468.07

... More
HireandLabourChargesforshutteringwithhardwoodforprecastR.C.Slabcurved,orstrightandstrikingoutthesameincludingfitting,fixingtheprecastslabinpositionwithnecessarycarriageandhaulage,hostingetc,complete in all respect.(only the area in contact with concrete to be measured)

327.71

-

346

... More
OrdinaryCementconcrete(mix1:1.5:3)withgradedstonechips(6mmnominalsize)excludingshutteringandreinforcement,ifany,ingoundfloorasperrelevant IS codes (i) upto 4 th floor

35.25

-

5365.49

... More
Artificialstoneinfloor,dado,staircaseetcwithcementconcrete(1:2:4)withstonechips,laidinpanelsasdirectedwithtoppingmadewithordinaryorwhitecement(asnecessary)andmarbledustinproportion(1:2)includingsmoothfinishingandroundingoffcornersincludingrakingoutjointsorrougheningofconcretesurfaceandapplicationofcementslurrybeforeflooringworksusingcement@1.75kg/sq.m all complete including all materials and labour.In ground floor.3mm.thicktopping(Highpolishinggrindingonthisitemisnot permitted with ordinary cement).Using grey cement (ii) 25 mm. thick

120.7

-

257.13

... More
White washing including cleaning and smoothening surface thoroughly. All floors (b) Two coats (to be done on specific instruction).

428.2

-

18.14

... More
ApplyingExteriorgradeAcrylicprimerofapprovedqualityandbrandonplasteredorcencretesurfaceoldornewsurfacetoreceivedecorativetextured(mattfinish)orsmoothfinishacrylicexterioremulsionpaintincludingscrapingandpreparingthesurfacethroughly,completeaspermanufacturer'sspecificationandasperdirectionoftheEIC.

1

-

1

... More
ProtectiveandDecorativeAcrylicexterioremulsionpaintofapprovedquality,aspermanufacturer'sspecificationandasperdirectionofEngineer-in-Chargetobeappliedoveracrylicprimerasrequired.Therateincludescostofmaterial,labour,scaffoldingandallincidentalcharges but excluding the cost of primer.In Ground floor (Two Coat)a) Normal Acrylic Emulsion

246.2

-

67

... More
M.S.gateofJailtypeasperapproveddesignmadeofstrongM.S.framework,intermediatestiffenersandround/squarebarsorangles.M.S.sheet(notlessthan14gauge)gussets,cleatsetc.includingnecessaryriveting,bolting,welding,lockingandhangingarrangements,fittingandfixingcompleteasperdirectionoftheEngineer-in -charge.

6.57

-

10190

... More
(a)M.S.orW.I.OrnamentalgrillofapproveddesignjointscontinuouslyweldedwithM.S,W.I.Flatsandbarsofwindows,railingetc.fittedandfixedwithnecessaryscrewsandlugsingroundfloor.upto4thfloor

2.12

-

9986.88

... More
Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

38.88

-

29

... More
Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessar On steel or other metal surface : With other than hi-gloss of approved quality- (ii) Two coat (white in shade)

38.88

-

70

... More
Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, alamoid/Bitumen/M-Seal etc) complete.UPVC Pipes:110 mm. Dia.

17.07

-

251

... More
c) Bend 87.5 degree (iii) 110 mm. Dia.

6

-

140

... More
d) Shoe (iii) 110 mm. Dia.

6

-

111

... More
GST 18%

1

-

175801.16

... More
CESS 1%

1

-

11524.74



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.