Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date10 Jan 2025
Closing Soon29 Jan 2025
Tender Amount₹ 6,53,987
Costs
EMD
₹ 13,080Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_798331_4Tender No
ET-49 / PW/Eng/24Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in filling in foundation trenches or plinth
with good earth, in layers not exceeding 150 mm.
including watering and ramming etc. layer by layer
complete. (Payment to be made on the basis of
measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation.
28.44
77
2205.11
... More
(iii) With carried earth arranged by the contractor
within a radius exceeding 3 km. but not exceeding 5
km. including the cost of carried earth.
54
399
21546.54
... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand
7.23
640
4636.3
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand
81.46
324
26393.04
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4m
(i) Tor steel/Mild Steel (Other manufacturers not specified)
2.3
53045
122005.18
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, In ground floor as per relevant IS codes. (i) Pakur Variety
24.49
5343
130864.67
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
138.44
328
45408.32
... More
1. Brick work with 1st class bricks in cement mortar (1:4) a. In foundation & Plinth
25.2
5012
126311.47
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface]
(ii) With 1:4 cement mortar (b) 15 mm thick plaster
136.65
148
20224.2
... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
136.65
32
4488.95
... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications.
I. Stone/Boulder
15.62
496
7747.52
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
100.52
166
16686.32
... More
GST 18% =Rs.
1
98772
98772.91
... More
Labour Cess 1 % = Rs.
1
6475
6475.11
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%