Municipal Affairs Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date15 Feb 2025
Closing Soon1 Mar 2025
Tender Amount₹ 4,85,152
Costs
EMD
₹ 9,703Document Cost
₹ 1,463Tender Fee
Refer Documents
Summary
Wbmad/ulb/km/nit-4(e) /dev/2024-2025/sl No-159
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_813612_159Tender No
WBMAD/ULB/KM/NIT-4(e) /Dev/2024-2025Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Repairing of Kalyani Municipality Office Building, Under kalyani Municipality.
BOQ Items
... More
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
(b) Extra rate for each addl floor over the rate of
ground floor. (2nd floor)
Ref. Page - 10, Item 3 a, PWD SOR VOL-I w.e.f. 1.11.2017
6.24
2056
12831.5
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(a) Pakur Variety
Ref. Page -15, Item -7a), PWD SOR Vol-I w. e. f. 1.11.2017
11.99
5718
68589.64
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
III. JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL
Bsaed on Analysis Rate
Ref. Page -43-44, Item -40 II), PWD SOR Vol-I w. e. f. 1.11.2017 8th Addenda & Corrigenda w. e. f. 18.04.2018)
0.53
54882
29087.77
... More
(b)Add extra over the rate of ground floor/initial 4 m for each basement floor and each additional floor below/ above ground floor
(a) For works in foundation, basement and upto roof of ground floor/upto 4 m
(i) 1st floor
III. JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL
Bsaed on Analysis Rate
Ref. Page -43-44, Item -40 II), PWD SOR Vol-I w. e. f. 1.11.2017 8th Addenda & Corrigenda w. e. f. 18.04.2018)
0.51
55362
28234.92
... More
(b)Add extra over the rate of ground floor/initial 4 m for each basement floor and each additional floor below/ above ground floor
(a) For works in foundation, basement and upto roof of ground floor/upto 4 m
(i) 2nd floor
III. JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL
Bsaed on Analysis Rate
Ref. Page -43-44, Item -40 II), PWD SOR Vol-I w. e. f. 1.11.2017 8th Addenda & Corrigenda w. e. f. 18.04.2018)
0.51
55842
28479.72
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(f) 25 mm to 30 mm shuttering without staging in foundation
Ref. Page -43, Item -36 f), PWD SOR Vol-I w. e. f. 1.11.2017
110.88
335
37144.8
... More
Extra for works beyond the roof of ground floor per additional floor
(i) upto 4th (per floor) and in basement.
Ref. Page -43, Item -36 f), PWD SOR Vol-I w. e. f. 1.11.2017
95.48
353
33704.44
... More
Extra for works beyond the roof of ground floor per additional floor
(i) upto 4th (per floor) and in basement.
Ref. Page -43, Item -36 f), PWD SOR Vol-I w. e. f. 1.11.2017
152.18
371
56458.78
... More
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) In ground floor.
Ref. Page - 16, Item 16; PWD SOR VOL-I w.e.f. 1.11.2017
24.85
728
18103.97
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (Ground floor).
(i) With 1:6 cement mortar (c) 15 mm thick plaster
Ref. Page -189, Item -1, PWD SOR Vol-I w. e. f. 1.11.2017 and P-49-50 of 96, Item -1, 3rd CORRIGENDA & ADDENDA wef 04.06.2018
138.96
148
20642.51
... More
Extra for each additional floor over the rate for ground floor items
1 to 3 of subhead A :
(i) External plaster
Ref. Page -193, Item -1, PWD SOR Vol-I w. e. f. 1.11.2017
119.66
154
18493.45
... More
Extra for each additional floor over the rate for ground floor items
1 to 3 of subhead A :
(i) External plaster
Ref. Page -193, Item -1, PWD SOR Vol-I w. e. f. 1.11.2017
178.48
160
28654.16
... More
Add 18 % GST
407075.28
-
73273.55
... More
Add 1 % CESS
480348.83
-
4803.49
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%