Municipal Affairs Department Tender

... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Municipal Affairs Department - MAD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date24 Dec 2024
Closing Date17 Jan 2025
Tender Amount₹ 1,00,40,303.63 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Wbmad/ulb/hm/5605/nit-1745/2nd Call Dt-16.12.2024

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No. 4 / Page No. - 10/3 Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.

16

1956

31296

... More
Item No. 5 / Page No. - 1/2 (a) Earth work in excavation in foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1500 mm.

80

119

9541.6

... More
Item No. 6 / Page No. - 24/4 (a) (Analysis Rate) Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. a) Pakur Variety

6.5

5124

33307.69

... More
Item No. 7 / Page No. - 26/10 (Analysis Rate) Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety

66

5623

371166.84

... More
Item No. 8 / Page No. - 25/6 (Analysis Rate) Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture] M 25 Grade (i) Pakur Variety

51

6112

311729.85

... More
Item No. 9 / Page No. - 42/36 Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fittings, fixing and striking out after completion of works. ( upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height. shall be taken as 4 m and extra for woks beyond the initial 4 m. ht. shall be allowed under 12(e) for every 4 m or part thereof. ) (f) 25 mm to 30 mm shuttering without staging in foundation

28

205

5740

... More
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work

208

359

74672

... More
Item No. 10 / P - 43/40 (Analysis Rate) Reinforcement for all reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders, etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. a) For works in foundation , basement and upto roof of ground floor/ upto 4 m. (i) Tor Steel / Mild Steel I . TATA / SAIL

27

55480

1497974.31

... More
Item No. 11 / Page No. - 15/7 (a) (Analysis Rate) Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth

13

5397

70168.67

... More
Item No. 12 / Page No. - 1/3 Earth work in filling in foundation trenches or plinth with good earth. in layers not exceeding 150 mm. including watering and raming etc. layer by layer complete. ( Payment to be made on basis of measurement of fiinished quantity of work ) a) With earth obtained from excavation of foundation.

54

77

4187.16

... More
Item No. 13 / Page No. - 74/46 (Rate taken from 3rd Corrigenda ,dt - 04/06/2018) Supplying and laying chequered tiles of any shade & of approved quality with (1:1½:3) cement concrete laid in panels or patterns as directed in pavement, footpath etc. including necessary underlay 25 mm thick [avg] cement mortar (1:3) complete in all respect with all labour and materials. [Using cement slurry @ 4.4 kg/Sq.m at back side and @2.4 kg/Sq.m for joint filling] Red Variety (ii) 30 mm. thick

440

493

216920

... More
Item No. 14 / P - 101/1 (III) (Rate taken from 3rd Corrigenda ,dt - 04/06/2018) M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m

8

72603

580824

... More
II) For Structural Works in Roof Trusses etc. using joists, channels and angles of specified section weighing less than 22.5 kg/ m

9.2

73761

678601.2

... More
III) For built up sections / srtuctural members of specified sections weighing not less than 22.5 Kg./m

23.75

75266

1787567.5

... More
Item No. 15 / Page No. - 83/17 Supplying, fitting & fixing Industrial Troughed Aluminium sheet (excluding the supporting frame work) of approved make & brand in alloy 3105 conforming to IS: 1254-1991 fitted and fixed with 75 mm & 25 mm Self tapping screw ,EPDM Washer 16 mm dia & 3 mm th washer etc complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work) (Aluminium sheet to be supplied by contractor). (i) In Roof:- b) With 0.71 mm thick sheet

472

821

387512

... More
Item No. 16 / Page No. - 81/10 Galvanised iron sheet ridging fitted with necessary bolts, screws, washers etc complete.(225mm end lapping) (A) 300 mm lapping each way (b) With 0.63 mm sheet

24.5

380

9310

... More
Item No. 17 / Page No. - 82/12 Galvanised iron sheets valley gutter with perimeter not less than 750 mm with 225 mm lap each way fitted and fixed with necessary bolts, nuts, screws, etc.complete. Valley gutter made of 0.63 mm. thick sheets. (300mm End lapping)

58

543

31494

... More
Item No. 18 / Page No. - 82/12 Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen/M-Seal etc) complete A) UPVC Pipes: (iii) 160 mm. Dia.

30

485

14550

... More
B) UPVC Fittings: c) Bend 87.5 degree (iii) 160 mm. Dia

4

507

2028

... More
Item No. 19 / Page No. -200/1 a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.

1077

29

31233

... More
Item No. 20 / Page No. -200/2 Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary b) On steel or other metal surface ; With super gloss( hi - gloss ) (iv) Two coats (with any shade except white)

1077

79

85083

... More
GST Item (Effect from 01.11.2017) 18 % GST on Estimated Cost of Sl No- 1 to 21

1

1516407

1516407.66

... More
Labour Welfare Cess Item (Effect from 01.11.2017) 1% Labour Welfare Cess on Estmated Cost of Sl No -1 to 22

1

99408

99408.95



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.