Municipal Affairs Department Tender

Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.

Municipal Affairs Department - MAD Tender

Works
Housekeeping Services
Eprocure
Opening Date23 Dec 2022
Closing Date10 Jan 2023
Tender Amount₹ 96,63,950 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cutting of branches of trees shrubs and trimming of grass and weeds. i) Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location as per technical specification Clause 1914 for Rural Roads of MORD.

141

-

-

... More
Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them outside Government land including all leads and lifts to stack in a nearby available space complete.

629.28

-

-

... More
Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed

995

-

-

... More
Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer - in - Charge.

45

-

-

... More
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.- In Ground Floor

67.5

-

-

... More
(c) Extra rate for careful dismantling and recovering at least 150 no of useable bricks per cum.

67.5

-

-

... More
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof (a) upto 150 mm. thick

59.78

-

-

... More
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof.

52.81

-

-

... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge

180.09

-

-

... More
Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification][Mode of measurement:The affected surface area of reinforcement shall be considered for payment]

3.5

-

-

... More
Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m² of concrete surface).

3.5

-

-

... More
Cleaning and removing conservancy garbage mixed with rubbish & other filthy materials from the road side flank, drain and compound including cutting, loading, unloading to and from truck or cart by Mathor labour & removing the same to any distance.

27.36

-

-

... More
Taking out Mirzapur or glazed porcelain tiles carefully by chiselling from walls or floor including stacking serviceable material as directed.

124.8

-

-

... More
Providing and fixing at or near ground level precast cement concrete in kerbs (size: 450 mm x 350 mm x width 150 mm at bottom with bevelled nosing at top) of cement concreat M20 Grade without reinforcement, fixing as per approved pattern and setting in position at site after preparing the bed grade and slopes by laying Cement concrete with jhama khoa (1:4:8) as per specification and direction of Engineer-in Charge including filling of joints with 10 mm thick cement morter (3:1) and back filling the vertical piece properly with earth duly compacted and curing the morter joints for atleast 3 days including cost and carriage of all materials complete.

518

-

-

... More
Labour for taking out old soling edging including removing debris (a) Single flat soling

299

-

-

... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.

684.93

-

-

... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.

301.69

-

-

... More
Bamboo pile walling made of 65 mm to 75 mm dia. Bamboo (in single line) driven about half length into the ground at very close spacing side by side including necessary bamboo stays, ties, runners etc and lining the exposed portion with sheets made form cut-drums fitted and fixed complete as per direction. (c) With bamboos of length above 2.40 m. and up to 3.00 m. each

175

-

-

... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.

542.33

-

-

... More
Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth.

342.79

-

-

... More
(A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand.

18.77

-

-

... More
(II) Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety In ground floor (a) 1:3:6 proportion

71.04

-

-

... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) of Pakur variety excluding shuttering and reinforcement if any, as per relevant IS codes.- In Ground Floor

106.64

-

-

... More
Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture] M 25 Grade (i) Pakur Variety

32.96

-

-

... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor / upto 4m (i) Tor steel/Mild Steel (In Gr.floor) II. JSW/JSPL/SHYAM/ SRMB/BMASL/ELECROSTEEL/SSL

13.06

-

-

... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)

-

-

-

... More
(f) 25 mm to 30 mm shuttering without staging in foundation

185.83

-

-

... More
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work

1076.23

-

-

... More
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth

106.76

-

-

... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). (ii) With 1:4 cement mortar a)20 mm. thick plaster With 1:6 cement mortar In Gr. Fl.

1193.33

-

-

... More
Extra for Rusticated plaster (over rate of corresponding item of plaster) (a) With sand plus cement (Cement 0.053 Cu.m/100Sq.m)

287.7

-

-

... More
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.

378

-

-

... More
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in Ground floor (ii) Grill weighing above 16 Kg./sq.mtr and above

138.96

-

-

... More
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. i) On steel surface Two coats

926.4

-

-

... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : b) On steel surface(super gloss) (iv) Two coats (with any shade except white)

926.4

-

-

... More
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor:(b) Two Coats

860.33

-

-

... More
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification In Ground floor: (iii) Two coats

860.33

-

-

... More
Band moulding (horizontal or vertical) rectangular section,made with cement plaster (1:4) complete. In ground floor. i) Projection upto 25 mm. (a) Depth or width (75 mm to 100 mm) (Cement 1.25Kg/Mtr.)

411

-

-

... More
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.

390.27

-

-

... More
(b)Supplying and laying in the specific pattern of interlocking concrete paver block Pavements (ICBP) with concrete blocks (with concrete grade as specified as per table I of IS 15658:2006) manufactured from BIS lincence manufacturer , withspacer nib (small protruding profile on the vertical face of a paver block used as a device for keeping minimum joint gap in beteen the paving block , as per Cl. No. 3.26 of IS : 15658 with flexural strength/ breaking load as per Annexure G of IS : 15658 on the prepared base course of specified CBR as per Table 1 of IRC SP 63 92018) or else as mentioned in design and drawing with a cushion of compacted bending sand of 25-35 mm thick (grading of the bedding sand as per clause 6.5.1 of IRC SP-63) and filling up the gaps in between paver block with joint filling sand ( the grading of the joint filling sand will be as per clause 6.5.2 of IRC SP63) and competing the edges with cut blocks as per Cl. No. 8.7 of IRC SP- 63(2018) with proper confinement of bedding and joint filling sand , compaction , levelling and filling up of the edge gap 50 mm thick

388.5

-

-

... More
(a) Supplying, fitting and fixing 20 mm. to 37.5 mm. thick Chunar / Mirzapur / Dholpur slab in floor set in 20 mm thick (avg) cement mortar (1:4) bed and pointing in cement mortar (1:2) [1 cement: 2 marble dust] with admixture of pigment matching the stone shade, polishing all complete as per direction of the E-I-C (Using cement slurry for bedding @ 4.4 kg/Sq.m and jointing @ 2.4 kg/Sq.m). In ground floor

225

-

-

... More
(b) Supplying fitting and fixing in position 8 mm. to 12 mm. thick Dholpur slab in wall, dado making suitable arrangement to hold the stone properly with approved polymerised adhesives (6 mm thick) as per ISI specification including pointing with cement mortar (1:2) (1 cement: 2 marble dust) with admixture of pigment matching the stone shades all complete as per direction of Engineer-in-charge including cost of all materials, labour, scaffolding, staging, curing complete [using white cement for pointing @ 2.4 kg/ Sq.m]. In ground floor

135.72

-

-

... More
Pumping out water from ponds or tanks

2359.8

-

-

... More
Planting of trees ( Avenue plants) in 0.60m dia holea, 1m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure. This includes supply of labour, tools & plants including materials but excluding cost of tree.

50

-

-

... More
Maintanance of trees for one year (Avenue Plants) including watering, trimming, manuring, spraying insecticide and guarding as required. This includes supply of labour, tools & plants including materials (considered for five years Maintanance)

250

-

-

... More
Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment)

50

-

-

... More
Supplying and stacking sludge (adequate for Horticulture work) at site in dry cake form from approved disposal work site including royalty, all lead and lift etc. (Sludge measured in stack will be reduced by 8%).

50

-

-

... More
Spreading of sludge, dump manure,/farm yard manure/animel dung manure and good earth in required thickness. This includes supply of labour, tools & plants excluding materials.

369

-

-

... More
Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc.

-

-

-

... More
i) Furcaria veriegated 10-12 leaves in height 20-30cm in earthen pots of size 25cm.

50

-

-

... More
viii) Chaina palm of leavs 4-5 in earthen pot size 25cm

30

-

-

... More
xii)China palm of leaves 4-5 in earthen pots size 25cm

100

-

-

... More
xiii)Ficus regnold well branched (bushy) of height 120cm- 135cm in cement pots of size 35cm.

50

-

-

... More
x)Adenium obesum of height 90cm-60cm in earthen pots of size 25cm.

60

-

-

... More
xix)Bougainvillea (name variety, bushy plants, full bloom) of height 90cm-60cm in cement pots of size 30cm

40

-

-

... More
xxvi)Areca Palm 4 - 5 suckers of height 90 cm to 105 cm in earthen pots of size 25 cm.

80

-

-

... More
x) Ficus blakii (F. Vivicon) well branched (Bushy) of height 120cm - 135 cm in earthen pot of size 30cm.

3

-

-

... More
xv) Acalypha species (Red/Green) of height 30cm-90cm in earthen pots of size 20 cm.

120

-

-

... More
xviii) Bougainvillea (mix variety) of height 30cm-90cm in poly bag of size 10cm-15cm

80

-

-

... More
xxx) Dracaena Fragrance of height 90 cm to 60 cm in earthen pots of size 35 cm.

60

-

-

... More
xxxii) Dracaena Marginata of height 30 cm to 90 cm in earthen pots of size 20 cm

80

-

-

... More
(b) Maintenance of flowering plants and shrubs in central verge for one year (considered for five years Maintanance)

2

-

-

... More
Supplying and fixing grasses tiles of grass Maxican Carpet/Selection No. 1 Healthy & fresh grasses (size 1'x1' orbigger) including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from wees and fit for mowing including supplying good earth as required by Engineer-in-charge. (Rate includes supply of labour, tools & plants including materials)

915

-

-

... More
Preparation of beds for hedging and shrubbery by excavating 60cm deep and trenching the excavated base to a further depth of 30cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 ( 8 parts of stacked volume of earth after reduction by 20%, one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary watering and finally fine dressing, levelling etc., including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50m lift upto 1.5m complete. This includes supply of labour, tools & plants including materials. Planting hedge plants in two rows at 30cm apart

183

-

-

... More
Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. vi) Duranta healthy plant of big size

2000

-

-

... More
Maintenance of hedge for one year including application of necessary pesticide, farm yard manure, replacement of damaged hedge plant by new one complete in all respect as per instruction of Engineer-in-charge. This includes supply of labour, tools & plants including materials. (considered for five years Maintanance)

915

-

-

... More
Direction and Place Identification Signs with size more than 0.9 sqm size Board. Providing and erecting direction and placeidentification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing and Clause 801 of Specifications for Road & Bridge Works of MoRT&H (5th Revision)..

1

-

-

... More
Painting block letters or digits in Black Japan or any approved paint as per direction. a) Size 2 cm. to 2.5 cm.

300

-

-

... More
Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall / return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications

60

-

-

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 with spigot socket for culverts on first class bedding of granular material in single row including fixing with cement mortar 1:2 as per Technical Specification Clause 1106 for Rural Roads of MORD.(D) 600 mm dia

12

-

-

... More
Construction of Temporary impervious barrier by construction of outer annular layer with two rows of bullahs, suitable spaced, of dia. not less than 125 mm, driven at least half of the total length, properly tied, braced and supported and filling the annular space with sand / soil filled bags, protected by polythene sheet walling on both side including the dismantling, removing and cleaning the site of the construction of main component of the structure.

4

-

-

... More
Manufacturing, supplying, and installing of precast RCC Garden bench 3 seater for outside seating with precast Leg Support painted with Spray Paint for shiny look with Strong and durable design to take load up to 350 Kg. distributed across the length. Relevant specification shall be submitted to the EIC for approval in accordance with the requirements. The Manufacturer/supplier shall provide full details of the materials, including all associated manufacturing processes, test certificates and fasteners. The Manufacturer/supplier shall responsible for all labour, materials, equipment, carriage and all other incidentals cost governed by this specification to manufacture the casting components in accordance with any structural drawings provided by the EIC. Dimension=69D x 160W x 88H Centimeters Material=RCC Style = Garden Size=3 Seater Furniture Finish= Different colour as per image Seat Height : 16 Inches Item Weight : Not less than 55 Kg Waterproof : Yes

16

-

-

... More
Garden family swing with canopy Size- 6 X 6 X 8 Ft. Brand Delux. Material- MS. Load Capacity- 200Kg.

1

-

-

... More
Spring Rider Horse Height 2ft, Spring Dia- 4.5mm,handle made 15 mm NB pipe,Leg support 25 mm IDGI pipe,Size/Dimension 0.9 M X 0.45 M.

1

-

-

... More
FRP dustbin dog Height 3ft, Capacity 30 ltr, Thickness 2 mm.

8

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.