Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date31 Dec 2024
Closing Date17 Jan 2025
Tender Amount₹ 17,38,354.27 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 34,767Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Wbmad/ulb/hm/5753/nit-1859 Dt-21.12.2024
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAD_791075_1Bid Award Id
ViewTender No
WBMAD/ULB/HM/5753/NIT-1859Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Page No. - 47/3
Supplying & laying polythene sheet ( 150 gm. / SqM.) over the layer of compacted moorum at starched condition.
454.5
24
10908
... More
P - 24/4
Ordinary Cement concrete ( mix 1:2:4) with graded stone chips ( 20 mm nominal size ) excluding shuttering and reinforcement , if any, in ground floor as per relevant IS codes. a) Pakur Variety
21.37
5124
109505.44
... More
Page No. - 26/10 (i ) ( Analysis rate ) Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm
nominal size) excluding shuttering and reinforcement if any, in ground floor
as per relevant IS codes.
(i) Pakur Variety
103.85
5623
584025.4
... More
Page No. - 42/36
Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fittings, fixing and striking out after completion of works. ( upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height. shall be taken as 4 m and extra for woks beyond the initial 4 m. ht. shall be allowed under 12(e) for every 4 m or part thereof. ) f) 25 mm to 30 mm shuttering without staging in foundation.
67.5
205
13837.5
... More
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work
856.5
359
307483.5
... More
Page No. - 43/40 (ii) ( Analysis rate, 10th Corrigenda dt 24.08.2022 ) Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m
(i) Tor steel/Mild Steel
II. JSW /JSPL /SHYAM / SRMB / BMASL / ELECTROSTEEL / SSL
5.7
55087
314001.43
... More
Page No. -10/3
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.
(a) In ground floor including roof.
9.1
1956
17799.6
... More
Page No. - 43/38
Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect.(only the area in contact with concrete to be measured)
33.62
93
3126.66
... More
GST Item (Effect from 01.11.2017)
18 % GST on Estimated Cost of Sl No- 1 to 11
1
262547
262547.21
... More
Labour Welfare Cess Item (Effect from 01.11.2017) 1% Labour Welfare Cess on Estmated Cost of Sl No -1 to 12
1
17211
17211.43