Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Opening Date24 Sep 2018
Closing Date12 Oct 2018
Tender Amount₹ 30,70,854
Costs
EMD
₹ 61,417Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of Bituminous Repairing Work At Ward No-12
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_MAD_191110_22Tender No
WBMAD/HM/PWD /NiT e-433/2018-19Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Water Bound Macadam Sub Base by consolidating
Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessarycutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required
density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision) (i) For Construction of Sub Base by consolidating
Jhama metal (63 mm to 45 mm) with moorum
screening :
185.52
499056
2690.04
... More
Water Bound Macadam Sub Base by consolidating
Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
162.33
758673
4673.65
... More
Providing and applying tack coat with Cationic
Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with
Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
2164.4
20691
9.56
... More
Providing and laying bituminous macadam with Mobile Hot Mix Plant (Light Duty) using approved crushed aggregates of specified grading as per Table 500.4 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature by means of approved and suitable arrangements to the required grade, level and alignment and rolled with suitable power roller for
break down, inter-mediate and finished rolling as per
specification to achieve the desired compaction
including cost and carriage of stone materials and
bitumen, hire charges of machinery and equipment,
cost of fuel and lubricants and wages of operational
staff, quality control complete as per Specifications for Road & Bridge Works of MoRT&H (5th Revision) B. For Grading II (19 mm nominal size, 50-75 mm thick.).
108.22
857838
7926.8
... More
Providing, laying and rolling of Open - graded premix surfacing of 20 mm thickness composed of 13.2 mm (@ 0.018 m³ per m²) and 11.2 mm (@ 0.009 m³ per m²) size stone aggregates, including thoroughly cleaning of the surface, screening, cleaning and pre-heating stone chips and fully pre-coating the same either using viscosity grade paving bitumen or cut-back or emulsion, carrying the mixture by any suitable arrangements, laying the mixture uniformly over the surface, including line, grade and level to serve as wearing course on a previously prepared base, including mixing in Mobile Hot Mix Plant (Light Duty) and thoroughly rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades including the cost and carriage of stone chips and matrix, heating the matrix, preheating the aggregates to required temperatureand including the hire charges of Mobile Hot Mix Plant (Light Duty) and other machinery, pay of operators,cost of fuel and lubricants etc. complete as per Clause 510 for Roads & bridge of MORT&H.With out Tack Coat.
2164.4
366216
169.2
... More
Providing and laying Premixed Seal Coat (Type B) with approved quality sand/grit @ 0.6 m3/ 100 m2 and bitumen binder on thoroughly cleaned black top surface coated with tack coat, including heating and mixing cleaned sand/grit (100 % passing through 2.36 mm sieve and retained on 180 micron sieve) uniformly with bitumen binder, laying and spreading the mix at an uniform rate using suitable means, brushing the surface, if necessary, to ensure uniformity, followed by rolling with power roller including the cost and carriage of binder and aggregates, cost of heating the binder and aggregates and all other incidental charges, cost of fuel and lubricants, including hire charges of machineries, tools & plants required for construction and quality control complete as per Clause 511 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). II By Mechanical Means With Hot Bitumen Binder (@ 6.80 kg / 10 sqm.)
2164.4
104713
48.38
... More
Add GST @12% of estimated ammount
1
325762
325762.48
... More
add welfare cess@1%
1
30404
30404.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements