Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date17 Jan 2025
Closing Date25 Jan 2025
Tender Amount₹ 3,00,703
Costs
EMD
₹ 6,014Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Nit No. 1681/pwd(bmc), Dtd. 17/01/2025
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_803007_2Bid Award Id
ViewTender No
NIT NO. 1681/PWD(BMC), DTD. 17/01/2025Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1,500
30
119
3578.1
... More
(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring
shoring.
30
19238
5771.4
... More
c) Depth of excavation for additional depth beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary.
20
23470
4694
... More
Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the
Enginner in charge). (a) Depth upto 1.5 m.
27
386
10422
... More
(b) For additional depth beyond 1.5 m. and upto 3.00 m
27
439
11853
... More
(c) For additional depth beyond 3.00 m.
18
498
8964
... More
A) Filling in foundation or plinth by silver sand in layers not exceeding 150mm as directed and consolidating the same by through etc.
16.2
936
15166.6
... More
Supplying 5 HP Disel pump on hire basis for dewatering including fuel, operator and accessories complete in all respect as per instruction of EIC.
40
1500
60000
... More
Supplying of NP3 R.C.C. pipe complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in-charge.(Payment to be made on the basis of actual finished length of the pipe line). 1600mm dia
1
32199
32199
... More
Laying of R.C.C. pipe with spigot - socket/Roll on jointed pipe, lowering the same into the trench laying on the bed in trenches in prescribed gradient, depth and alignment, filling the end grooves with necessary bitumastic compound, filling caulking space with tarred gasket or with rubber gasket of appropriate size & covering with cement mortar (1:2) & testing the joints etc. complete as per drawing, specification including carriage of pipes from site stacks to the place of laying etc. & as per direction of the Engineer-in- charge. (Payment to be made on the basis of actual finished length of the pipe line). A) Class NP-3 Pipe
s) 1600 mm dia
5
1234
6170
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
18.9
361
6822.9
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety for laying bed
9.03
5999
54177.47
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety for collar joint
9.88
5999
59277.23
... More
Repairing leakage of RCC pipe line of any dia and coller joints of RCC drainage under ground lines with cementcaulking (1:1:1.5) and gasket soaked in tar and projection upto required depth including all complete in all respect as per direction of the Engineer-in-charge.
10
1527
15271.2
... More
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation.
14
7754
1085.56
... More
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
10
166
1660