Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date14 Jan 2025
Closing Date29 Jan 2025
Tender Amount₹ 1,19,460.37 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 50,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_800021_1Tender No
EQ-38 /WS/Eng/2025Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Stripping off worn out plaster and raking out
joints of walls, celings etc. upto any height and in
any floor including removing rubbish within a
lead of 75m as directed.
300
19
-
... More
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm.
15
119
-
... More
Filling in foundation or plinth by Fine sand in layers not exceeding 150 mm. as directed and consolidating same by thorough saturation with water ramming complete, including the cost of supply of sand. (Payment to be made on measurement of finished quantity)
(B) Do - by fine sand
8.5
640
-
... More
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand .
75
324
-
... More
Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety
14.8
4706
-
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering
in any concrete work
120
363
-
... More
4m-8m
60
381
-
... More
8m-12m
60
403
-
... More
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel Cost of steel Material as per Schedule (TATA/SAIL/RINL)
1.95
55092
-
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
14.65
5215
-
... More
Labour for Chipping of concrete surface before taking up Plastering work.
512
21
-
... More
Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth
2.95
5012
-
... More
Brick work with 1st class bricks in cement mortar (1:6) (a) In Super Structure
4.5
4989
-
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface
(i) With 1:6 cement mortar
(b) 20 mm thick plaster G.F
165
151
-
... More
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface
(ii) With 1:4 cement mortar
(c) 10 mm thick plaster G.F
80
120
-
... More
4m-8m
95
124
-
... More
8m-12m
95
128
-
... More
Neat cement punning about 1.5mm thick in all,dado,window
sill,floor etc.
NOTE:Cement 0.152 cu.m per100 sq.m.
45
32
-
... More
Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC
In Ground Floor: (b) Two Coats
80
45
-
... More
4m-8m
80
47
-
... More
8m-12m
80
50
-
... More
12m-16
350
53
-
... More
Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The
rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.
In Ground floor (Two Coat)
b) Premium 100% Acrylic Emulsion
80
84
-
... More
4m-8m
80
86
-
... More
8m-12m
80
89
-
... More
12m-16
350
92
-
... More
Priming one coat on steel or other metal surface with synthetic oilbound primer of approved quality including smoothening surfaces by sand papering etc.
60
29
-
... More
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :
(b) On steel or other metal surface with other than hi-gloss approved quality.
(iv) Two coats (with any shade except white)
(Build/Page-200, Item No-2)
60
79
-
... More
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor.
(ii) Grill weighing above 16 Kg./sq.mtr and above
2.82
9696
-
... More
Batch Mixed concrete of M 30 Grade with well Graded stone chips of 20 mm nominal size containing designed quantity of cement per Cu. M of Wet concrete produced in computerised batching plant under controlled condition using approved super plasticizer designing concrete mix following I.S 10262 and I.S. 456 transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required level of concreting and then placing the mix in its final location of form work compacting and curing the same complete as per specification and direction of the Engineer-in charge including hire charges of computerised batching plant, transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through
separate item. Consumption of cement will not be less than 320 Kg of cement per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. [Cement to be supplied by Deptt, if Cement is supplied by agency then item rate to be deduced as per Format A of Annexure I] [with Batching Plant & transit mixer] In Ground Floor & Foundation. [Pakur Variety].(i) Without approved concrete pump. [ Item no.-14,i, page-29]
19.75
5742
-
... More
4m-8m
9.5
5837
-
... More
8m-12m
9.5
5932
-
... More
(b) Extra for Staging beyond 4 m [mode of measurement: Area of
unsupported horizontal projection (where staging beyond 4 m is practically
unavoidable) x mean height of staging] above initial 4 m.)
6028.8
149
-
... More
Shop welding of M.S plates for fabrication of different diameter of M.S. pipes and specials by means of electric arc welding as per relevant I.S. specification using standard electrodes including edge preparation and charges for deployment of all types of tools and plants with electricity all complete as per specification and direction of the Engineer-in-Charge. (The Engineer-in-charge shall approve the electrode for arc welding before use)
Throat thickness in mm
6mm
200
330
-
... More
Making drill holes with suitable nozzel & fitting fixing in RCC wall column etc. where necessary acord into crack and damged parts as per exparts opinion and direction of Engineer in Charge including necessary tools and approved rate) plants
150
100
-
... More
Supply of cement Ambuja Plus / Lafarge Concreto / Ultratech Premium / ACC F to R/ Dalmia DSP at site as per direction of EIC all complete inb all respect (supply will be made as per consumption received) supply will be made by the contractor.
6.75
6343
-
... More
Injecting resicrete chemicals (Resine powder hardener etc) as per technical specification into the wall & where necessary according to the crack and damged point by pressure pump through the nozzel placed in the drilled hole as per exparts opinion and direction of Engineer in Charge complete including necessary chemical at site tools and plants at site.
100
453
-
... More
Making cement grouting by drilling in wall where necessary according to the crack or damaged point or any structure, fixing nozzel injecting Cico- conplast and NSC (Non- sinking Polymatic grouting) compound through the nozzels by pressure pump as per exparts opinion with supply of all materials, tools and plants etc (Only cement will be supplied by the department free of cost as per requirement).
250
352
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements