Municipal Affairs Department Tender
... More
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department - MAD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date25 Jan 2025
Closing Date21 Feb 2025
Tender Amount₹ 24,37,491
Costs
EMD
₹ 48,750Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of C.c Road In Ward No - 18 Within Jangipur Municipality.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_MAD_805736_10Tender No
MAD/ULB/JM/DEV/NIeT2/24-25 (1st Call)Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Page No - 1, Item No - 3 (a), V - I, PWD Building Work, Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work), (a) With earth obtained from excavation of foundation.
99.29
77
7698.95
... More
Page No - 42, Item No - 36(f)
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works
(When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof)
25 mm to 30 mm shuttering without staging in foundation
100.24
205
20549.2
... More
Page No - 15, Item No - 7 (a)
Brick work with 1st class bricks in cement mortar (1:4)
52.82
4882
257904.21
... More
Page No - 16, Item No - 16
125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor
175.06
669
117197.42
... More
Page -245, Item - 4.06, V - III, PWD Road and Bridge Work, Supplying, spreading and consolidating Stone Dust to a depth of 100 mm and above at desired density and C.B.R. as per Specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants complete as per specification. Add cost at site of the materials to arrive at the complete rate. The compaction factor is 0.70.
113.33
1241
140670.86
... More
Page No - 74, Item No - 47
Supplying& laying 20 mm designer chequered tiles of any shade and of approved quality as per IS: 1237: 1980 laid in
patterns as directed in pavement, footpath including necessary
underlay 25 mm thick average cement mortar (1:3) complete
in all respect with all labour and materials [using cement
slurry @ 4.4 kg/Sq.m at back side of tiles. Cement of mortar & slurry will be supplied by the Department. Border concrete if necessary to be paid separately].
752.4
824
619977.6
... More
Page No - 189, Item No - 1©
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
15 mm thk. Plaster (1:6)
284.98
139
39763.26
... More
Page No - 192, Item No - 15
Neat cement punning about 1.5mm thick in wall,dado,window sill,floor etc
284.98
32
9333.1
... More
Add applicable 9.00% CGST = Rs
1
178759
178759.92
... More
Add applicable 9.00% SGST = Rs
1
178759
178759.92
... More
Add 1.00% Labour welfare Cess = Rs
1
23437
23437.41
... More
Add 3.00% Contingency = Rs
1
70312
70312.24
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%