Municipal Affairs Department Tender
Search from over 10,000+ business opportunities that have been announced from the biggest West Bengal tenders, e tender West Bengal, WB government tenders, and the Online Tender Notices posted on West Bengal e tenders to date. Find opportunities that have come in from multiple corporations, West Bengal government departments, State PSUs, and several Private companies from the state.
Municipal Affairs Department Tender
Civil And Construction
Road Construction
Eprocure
Opening Date28 Jan 2025
Closing Date7 Feb 2025
Tender Amount₹ 3,40,591
Costs
EMD
₹ 6,812Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of Concrete Road From Main Road To Gokul Bhowmi Hous
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MAD_718680_6Tender No
WBMAD/ULB/CONTAI/152/MPLAD/ 2024-25Tender Authority
Municipal Affairs Department ViewPurchaser Address
-Website
http://http://www.wburbanservices.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Water Bound Macadam Sub Base by consolidating
Jhama metal / Laterite chelly or stone metal /
shingles of specific size in hard crust to requisite
thickness (measured after compaction) in layers
including screening of metals etc. as necessary,
hand packing, sweeping, watering and rolling in
stages with power roller to proper line, grade and
camber, lighting, guarding & barricading and
making necessary earthen bundh of one metre
width on each side where necessary to protect
edges and preparing the bed by necessary cutting
or filling and rolling all complete including the cost of
all materials and hire and labour charges of all men
and machineries and compacting to the required
density, as per Clause 404 of Specifications for Road
& Bridge Works of MoRT&H (5th Revision).
(i) For Construction of Sub Base by consolidating
Jhama metal
22.5
2268
51032.7
... More
P.W.D, Page No. 47, Item No. 3
-
-
-
... More
supplying and laying polythene Sheet ( 150 gm / sq.m) over damp proof couse or below flooring or roof terracing or in foundation trenches. For Road
225
24
5400
... More
P.W.D, Page No.- 26, Item no.- 10(i) 6th Adenda Corigenda, Dated. 29.07.2019
-
-
-
... More
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
33.75
6177
208504.8
... More
P.W.D, Page No.- 43, Item no.- 36 (f).
-
-
-
... More
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) a) 25 to 30 mm thick wooden shuttering with out staging in foundation.
30
205
6150
... More
Page No.- 242 / Item No.- 4.04
-
-
-
... More
Supplying, spreading and consolidating Moorum to a depth of 75 mm at desired density and C.B.R. as per specification with power roller to proper gradient and camber including watering as necessary, and lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks by rolling where necessary including all incidental charges of roller, cost of fuel & lubricants etc. complete as per specification.
6
1908
11451.42
... More
Add 18% GST (Sl No. 1 to 6)
1
51440
51440.21
... More
Add 1% Welfare Cess
1
3372
3372.19
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements